Jump to content

Dorang-class patrol boat: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Tags: Mobile edit Mobile web edit Advanced mobile edit
Tags: Mobile edit Mobile web edit Advanced mobile edit
Line 87: Line 87:
! scope="row" | 874
! scope="row" | 874
| Caputra Mitra Sejati
| Caputra Mitra Sejati
| Februari 2020
| February 2020
| 25 Maret 2022
| 25 March 2022
| 31 August 2022
| 31 August 2022
| [[Ambon]]
| [[Ambon]]
Line 96: Line 96:
! scope="row" | 875
! scope="row" | 875
| Caputra Mitra Sejati
| Caputra Mitra Sejati
| Februari 2020
| February 2020
| 25 Maret 2022
| 25 March 2022
| 31 August 2022
| 31 August 2022
| [[Sorong]]
| [[Sorong]]

Revision as of 16:11, 11 December 2022

Koarmada1tnial-1647921112
Dorang (874) and Bawal (875) during the commissioning ceremony
Class overview
NameDorang class
Builders
Operators Indonesian Navy
Preceded byPari class
Built2020 - present
In commission2022 - present
Planned7
Building4
Completed2
Active2
General characteristics
Class and typeType PC-60 patrol boat
TypePatrol boat
Tonnage520 Tonnes (full load)
Length60 m (196 ft 10 in)[1]
Beam8.5 m (27 ft 11 in)
Height4.95 m (16 ft 3 in)
Draught2.72 m (8 ft 11 in)
Propulsion2 x MTU 20V400M73 diesel engines
Speed24 knots (44 km/h; 28 mph)
Endurance8 days
Complement55
Armament
  • 1 x Bofors 40 mm (1.6 in) main gun
  • 2 x 12.7 mm (0.50 in) machine gun

Dorang class is a patrol boat class of the Indonesian Navy, also known as Type PC-60 or PC-60M patrol boat. It was developed from KCR-60M and PC-40 design and built locally across various Indonesian Shipyard.[2]An indirect successor of FPB-57 class in terms of size and tonnage.

As of December 2022, 2 vessels of the Dorang class already in active service with 4 other under construction.

Background

During the appointment ceremony of Indonesian Navy's then Eastern Fleet Command chief of staff, Rear Admiral Darwanto on 23 January 2015, Indonesia's then Chief of Staff of the Navy, Admiral Ade Supandi stated that to prevent illegal fishing by foreign commercial vessels in eastern Indonesia, the Indonesian Navy needs at least 15-20 patrol boats operating every day. The performance of elements of military force also needs to be intensified so he concluded that the Indonesian navy needed 40 new patrol boats with a size of 60 meters. But for the initial stage, he projects to acquire at least 22 patrol boats first through a gradual procurement process, and also aims to replace older patrol boats.[3]

On August 31, 2022, the first two PC-60 patrol boats were inaugurated by Admiral Yudo Margono with Dorang (874) being the lead ship for the class.[4]

Ship in class

Name Hull no. Builder Laid down Launched Commissioned Home port Status
Dorang 874 Caputra Mitra Sejati February 2020 25 March 2022 31 August 2022 Ambon Active[5]
Bawal 875 Caputra Mitra Sejati February 2020 25 March 2022 31 August 2022 Sorong Active[5]
tbd tbd Karimun Anugrah Sejati 4 March 2022 tbd Under construction[6]
tbd tbd Palindo Marine 15 March 2022 tbd Under construction[7]
tbd tbd Caputra Mitra Sejati 9 December 2022 tbd Under construction[8]
tbd tbd Caputra Mitra Sejati 9 December 2022 tbd Under construction[8]

References

  1. ^ "Kapal Patroli Cepat 60M" (in Indonesian). Retrieved 11 December 2022.
  2. ^ Perdana, Gilang (7 August 2021). "Tahun 2022, PT Caputra Mitra Sejati Kirim Unit Perdana PC-60 Pesanan TNI AL" (in Indonesian). Retrieved 11 December 2022.
  3. ^ "ksal minta pangarmatim efektifkan operasi "illegal fishing"" (in Indonesian). 23 January 2015. Retrieved 11 December 2022.
  4. ^ "Bawal 875 Pangkoarmada l Menghadiri Upacara Peresmian dan Pengukuhan Komandan KRI Dorang 874 dan KRI Bawal 875" (in Indonesian). 31 August 2022. Retrieved 11 December 2022.
  5. ^ a b "Bawal 875 Pangkoarmada l Menghadiri Upacara Peresmian dan Pengukuhan Komandan KRI Dorang 874 dan KRI Bawal 875" (in Indonesian). 31 August 2022. Retrieved 11 December 2022.
    "TNI Angkatan Laut Luncurkan Dua Kapal Patroli Karya Anak Bangsa" (in Indonesian). 25 March 2022. Retrieved 11 December 2022.
  6. ^ "Optimalkan Tugas Opskamla, TNI AL Pesan Kapal PC 60 M". SINDOnews.com (in Indonesian). Retrieved 2022-03-05.
  7. ^ "DANLANTAMAL IV HADIRI FIRST STEEL CUTTING DAN KEEL LAYING KAPAL PC - 60 KOARMADA II DI BATAM" (in Indonesian). 21 March 2022. Retrieved 11 December 2022.
  8. ^ a b "Datangi Galangan Kapal di PT CMS Banten, Wakasal Ahmadi Heri Lihat Kesiapan Alutsista Maritim RI". Tribunbanten.com (in Indonesian). Retrieved 2022-12-09.