m I changed the construction status and added the 3rd phase of the metro line
List of stations: Diamond park under planned
Tags: Mobile edit Mobile web edit
Line 64: Line 64:
* Joka to Majerhat (Trials underway)
* Joka to Majerhat (Trials underway)
* Majerhat to Esplanade (Under construction)
* Majerhat to Esplanade (Under construction)
*Diamond Park to Joka (Construction Completed)
*Diamond Park to Joka (Planned)


{| class="wikitable" style="text-align: center;" width="70%"
{| class="wikitable" style="text-align: center;" width="70%"
Line 89: Line 89:
| rowspan="3" |[[Joka, Kolkata|Joka]]
| rowspan="3" |[[Joka, Kolkata|Joka]]
| rowspan="2" |1
| rowspan="2" |1
| rowspan="2" |Construction Completed
| rowspan="2" |Planned
| rowspan="2" |{{rint|kolkata|bus}} Vivekananda Mission School Bus Stop
| rowspan="2" |{{rint|kolkata|bus}} Vivekananda Mission School Bus Stop
| rowspan="10" |Elevated
| rowspan="10" |Elevated

Revision as of 09:01, 15 December 2022

Kolkata Metro Line 3

Joka-Esplanade Metro
Overview
StatusUnder trials
OwnerMetro Railway, Kolkata
Line number3
LocaleIndia Kolkata, India
Termini
Connecting lines Blue Line   Green Line 
Stations14
WebsiteIndian Railways
Service
TypeRapid transit
SystemKolkata Metro
Operator(s)Metro Railway, Kolkata
History
Planned openingJoka to Taratala December 2022[1]
Technical
Line length15.246 kilometres (9.473 mi)

(10.246 kilometres (6.367 mi) (Under Construction)

5 kilometres (3.1 mi) (Planned))[2]
Number of tracks2
CharacterElevated and Underground
Track gauge5 ft 6 in (1,676 mm) broad gauge
Electrification750 V DC using third rail[3]
Operating speed80 km/h (50 mph) (designed)
Route map

Esplanade
Park Street
Victoria
Tolly Canal
Khidirpur
Mominpur
Majerhat
Taratala
Behala Bazar
Behala Chowrasta
Sakher Bazar
Thakurpukur
Joka
IIM Calcutta
Diamond Park

Kolkata Metro Line 3 or the Purple Line is a line of the Kolkata Metro. As of 2021, the line is still under construction.[4] The route spans 15.246 kilometres (9.473 mi) from Joka in the south, to Esplanade in the north with an extension of 3.39 kilometres (2.11 mi) to Diamond Park from Joka.[5] It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.

Development

It is partially elevated and partially underground: around 8.5 kilometres (5.3 mi) of the project will be elevated and the rest 6.32 kilometres (3.93 mi) of the metro line will be underground.[4] The project is getting delayed due to non availability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019.[6] Tenders for its construction and plant & machinery were invited in April 2020.[7]

Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.

Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.

As of 15th September, 2022, the stretch from Joka to Taratala has been fully constructed and electrification has been done. Testing trials are underway from Joka to Taratala using the old decommissioned Metro Rakes. Eventually in service there will be new air conditioned metro rakes. The stretch from Majherhat to Esplanade is under contruction.

List of stations

The work has been sanctioned in 2010-11 for the new Metro line from Joka to B.B.D. Bagh for a length of 16.72 km at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at Esplanade. A separate Depot is under construction in Joka. It is being built by RVNL and the tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for 2 km has been sanctioned in the Budget of 2012-13 at a cost of Rs. 294.49 Cr. The execution of this work has been entrusted to RVNL.

There are 3 phases in this line-

  • Joka to Majerhat (Trials underway)
  • Majerhat to Esplanade (Under construction)
  • Diamond Park to Joka (Planned)
Line 3 (Purple Line)
No. Station Name Location Phase Opening Connections Layout Coordinates Notes
English Bengali
1 Diamond Park ডায়মন্ড পার্ক Joka 1 Planned Vivekananda Mission School Bus Stop Elevated
2 IIM আইআইএম
3 Joka জোকা 1 Under Trial Runs Joka bus Depot

Diamond Park Bus Stop

Also known as Diamond Park
4 Thakurpukur ঠাকুরপুকুর Thakurpukur

Thakurpukur Police Station Bus Stop

Thakurpukur Bazar Bus Stand

5 Sakherbazar সখেরবাজার Behala

Thakurpukur Bus Depot

Silpara Bus Stop

Behala Sakherbazar Minibus Stand

Kadamtala Bus Stand

Also known as Silpara
6 Behala Chowrasta বেহালা চৌরাস্তা

Behala Chowrasta Bus Stand

7 Behala Bazar বেহালা বাজার

Behala Bazar Bus Stop

8 Taratala তারাতলা Taratala

Ajanta Cinema Bus Stop

Taratala Bus Stand

Also known as Pathakpara
9 Majerhat মাঝেরহাট Majerhat Majerhat Station

DH Road Mint Bus Stop

Majherhat Gurudwara Bus Stop

10 Mominpur মোমিনপুর Mominpur Mominpore Bus Stop
11 Kidderpore খিদিরপুর Kidderpore 2 Under Construction Khidirpur Station

Khidderpore Crossing Tram Stop Khidderpore Bus Stop

Underground
12 Victoria ভিক্টোরিয়া Maidan Hastings Tram Stop

Victoria Memorial Bus Stop

PG Hospital Bus Stop

Birla Planetarium Bus Stop

Also known as Hastings
13 Park Street পার্ক স্ট্রিট Park Street Park Street Bus Stop

 Blue Line 

14 Esplanade এসপ্ল্যানেড Esplanade Under Construction  Blue Line 

 Green Line  (Under Construction)

Esplanade Bus Station(WBTC,SBSTC,NBSTC)

Esplanade Tram Depot

International Bus Terminus. Also known as Dharmatala / Chowringhee

See also

References

  1. ^ https://www.magicbricks.com/blog/amp/kolkata-metro-route-map-timings-fare-update/128222.html
  2. ^ "Kolkata Metro Map".
  3. ^ "CAF to supply Kolkata metro trains". Railway Gazette. 9 September 2012. Retrieved 6 September 2018.
  4. ^ a b Bandyopadhyay, Krishnendu; Chakraborty, Ajanta (10 June 2019). "Kolkata: Work on fast track as East-West Metro eyes new links in next two years | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.
  5. ^ "Kolkata Metro Line 3".
  6. ^ Bandyopadhyay, Krishnendu (1 March 2019). "Work begins at Joka Metro depot, wall built | Kolkata News - Times of India". The Times of India. Retrieved 28 June 2019.
  7. ^ "RVNL Invites Bids for Kolkata Metro Line-3's Joka Depot". The Metro Rail Guy. 28 April 2020. Retrieved 29 April 2020.