Jinjang MRT station: Difference between revisions
Appearance
Content deleted Content added
Wiki Farazi (talk | contribs) No edit summary |
→Bus Services: // Edit via Wikiplus |
||
Line 67: | Line 67: | ||
|''Terminus'' |
|''Terminus'' |
||
|- |
|- |
||
|{{KL bus code|MAGENTA|bgcolor=# |
|{{KL bus code|MAGENTA|bgcolor=#{{klbcr|goklmagenta}}}} |
||
|{{KLRT code|PY|11}} Jinjang MRT Station Gate B |
|{{KLRT code|PY|11}} Jinjang MRT Station Gate B |
||
|[[ |
|[[MATRADE Exhibition and Convention Centre|MATRADE]] |
||
|Jalan 1/32A<br>Jalan 5/32A<br>Jalan 1/40<br>Segambut Bypass<br>{{KLRT code|KA|05}} [[Segambut Komuter station]]<br>Jalan Segambut<br>Persiaran Dutamas<br>[[Federal Territory Mosque]] |
|Jalan 1/32A<br>Jalan 5/32A<br>Jalan 1/40<br>Segambut Bypass<br>{{KLRT code|KA|05}} [[Segambut Komuter station]]<br>Jalan Segambut<br>Persiaran Dutamas<br>[[Federal Territory Mosque]] |
||
|''Terminus'' |
|''Terminus'' |
||
Line 111: | Line 111: | ||
| |
| |
||
|} |
|} |
||
== References == |
== References == |
Revision as of 19:14, 15 December 2022
This article needs additional citations for verification. (January 2019) |
PY11 Jinjang | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mass rapid transit station | |||||||||||
General information | |||||||||||
Location | Jinjang, Kuala Lumpur Malaysia | ||||||||||
Coordinates | 3°12′34″N 101°39′22″E / 3.20955195°N 101.65606396°E | ||||||||||
Owned by | MRT Corp | ||||||||||
Operated by | Rapid Rail | ||||||||||
Line(s) | 12 Putrajaya | ||||||||||
Platforms | 1 island platform | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Parking | Available | ||||||||||
Other information | |||||||||||
Status | Operational | ||||||||||
Station code | PY11 | ||||||||||
History | |||||||||||
Opened | 16 June 2022 | ||||||||||
Services | |||||||||||
|
The Jinjang MRT station is a mass rapid transit (MRT) station in the township of Jinjang, Kuala Lumpur, Malaysia. It is one of the stations on the MRT Putrajaya line.[1]
The station began operations on 16 June 2022 as part of Phase One operations of the Putrajaya Line.[2]
Location
The station is located at the junction of Jalan Kepong and Segambut Bypass.
Station features
- Elevated station with island platform
- Park & Ride
Bus Services
Feeder buses
Route No. | Origin | Desitination | Via | Connecting to |
---|---|---|---|---|
T117 | PY11 Jinjang MRT Station Gate B | Taman Sri Segambut | Jalan 1/32A Jalan 5/32A Jalan 4/40 Jalan Mergastua Segambut Bypass |
Terminus |
MAGENTA | PY11 Jinjang MRT Station Gate B | MATRADE | Jalan 1/32A Jalan 5/32A Jalan 1/40 Segambut Bypass KA05 Segambut Komuter station Jalan Segambut Persiaran Dutamas Federal Territory Mosque |
Terminus |
Other buses
References
- ^ "MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit". Archived from the original on 2017-06-27. Retrieved 2017-05-29.
- ^ Wahab, Farid (2022-06-16). "First Putrajaya MRT stretch opens today". The Star. Retrieved 2022-06-16.
External links