Yamagata Shinkansen: Difference between revisions
Zekerocks11 (talk | contribs) No edit summary |
|||
Line 317: | Line 317: | ||
[[Category:Standard gauge railways in Japan]] |
[[Category:Standard gauge railways in Japan]] |
||
[[Category:Railway lines opened in 1992]] |
[[Category:Railway lines opened in 1992]] |
||
[[Category:1992 establishments in Japan]] |
Revision as of 06:29, 25 December 2022
Yamagata Shinkansen | |||
---|---|---|---|
Overview | |||
Native name | 山形新幹線 | ||
Owner | JR East | ||
Locale | Fukushima and Yamagata Prefectures | ||
Termini | |||
Stations | 11 | ||
Service | |||
Type | Mini-shinkansen | ||
Rolling stock | E3-1000 series/E3-2000 series | ||
History | |||
Opened | 1 July 1992 | ||
Technical | |||
Line length | 148.6 km | ||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Electrification | 20 kV AC, 50 Hz, overhead catenary | ||
Operating speed | 130 km/h (80 mph) | ||
|
The Yamagata Shinkansen (山形新幹線) is a Mini-shinkansen route in Japan, operated by East Japan Railway Company (JR East). It provides service between Tokyo and Shinjō in Yamagata Prefecture over the tracks of the Tohoku Shinkansen and the Ōu Main Line.
The term Yamagata Shinkansen refers to the segment that connects Fukushima and Shinjō. Because the shinkansen trains share tracks with regular service trains, it is often referred to as a "mini-shinkansen".
Operations
Trains consist of 7-car E3 series trainsets operating as Tsubasa services. Between Tokyo and Fukushima, the trains run coupled to Yamabiko trains on the Tōhoku Shinkansen. Between Fukushima and Shinjō, the trains run on their own at a maximum speed of 130 km/h (80 mph) and share the line with regular Ōu Main Line trains.[1]
As of July 2012, about 62 million passengers had ridden the line since it opened in July 1992.[2] The fastest trains connected Tokyo and Yamagata stations in two hours and 29 minutes.[2]
Proposed Ou Base Tunnel
Construction of a Base tunnel on the Yamagata Shinkansen is proposed, with JR East having undertaken a survey of a planned route from Niwasaka to Sekine, just south of Yonezawa station.[3] 23.1 km (14.4 mi) of the proposed 24.9 km (15.5 mi) line would be in tunnel, mostly to the north of the existing 88 km (55 mi) Fukushima – Yamagata section. To be built on an improved alignment, the tunnel would lower journey times between Fukushima and Yamagata by ~10 min due to a proposed line speed of up to 200 km/h.[citation needed]
The tunnel would avoid the Itaya Toge pass through the Ou mountains west of Fukushima. Gradients range from 3.0% to 3.8% and the line reaches an altitude of 548 m (1,798 ft). The curvature and steep grades limit train speeds to 55 km/h (34 mph) or less, and the line is vulnerable to heavy rain and snowfall as well as high winds.[citation needed] Between 2011 and 2017 a total of 410 Yamagata mini-Shinkansen services were either suspended or delayed, and 40% of these incidents occurred on the line over the Itaya Toge pass.[citation needed]
If the ¥150 billion base tunnel is authorised, detailed design would take five years and construction another 15 years.[citation needed] The cost could increase by ¥12 billion if the tunnel were to be built with a cross-section large enough to permit the line to be upgraded to the full Shinkansen loading gauge.[citation needed]
Station list
- All stations listed below are located on the Ōu Main Line.
- Beyond Fukushima, trains bound for Tokyo run with Tohoku Shinkansen trains.
Station | Japanese | Distance (km) | Transfers | Location | ||
---|---|---|---|---|---|---|
From Tokyo | From Fukushima | |||||
Fukushima | 福島 | 272.8 | 0.0 | Tōhoku Shinkansen (for Morioka), Tōhoku Main Line AbukumaExpress: Abukuma Express Line Fukushima Transportation: Iizaka Line |
Fukushima | Fukushima |
Yonezawa | 米沢 | 312.9 | 40.1 | Yonesaka Line | Yonezawa | Yamagata |
Takahata | 高畠 | 322.7 | 49.9 | Takahata, Higashiokitama District | ||
Akayu | 赤湯 | 328.9 | 56.1 | Flower Nagai Line | Nanyō | |
Kaminoyama-Onsen | かみのやま温泉 | 347.8 | 75.0 | Kaminoyama | ||
Yamagata | 山形 | 359.9 | 87.1 | Yamagata | ||
Tendō | 天童 | 373.2 | 100.4 | Tendō | ||
Sakurambo-Higashine | さくらんぼ東根 | 380.9 | 108.1 | Higashine | ||
Murayama | 村山 | 386.3 | 113.5 | Murayama | ||
Ōishida | 大石田 | 399.7 | 126.9 | Ōishida, Kitamurayama District | ||
Shinjō | 新庄 | 421.4 | 148.6 | Ōu Main Line, Rikuu East Line, Rikuu West Line | Shinjō |
Rolling stock
As of March 2020, the following types are used on Yamagata Shinkansen services.
- E3-1000 series 7-car sets, since 4 December 1999 (to be replaced by E8 series after 2024)
- E3-2000 series 7 car sets, since 20 December 2008
Former rolling stock
- 400 series 7-car sets (originally 6-car sets) withdrawn by 18 April 2010
Future rolling stock
- E8 series 7-car sets, from 2024 onwards
Non-revenue-earning-types
History
- 1 July 1992: Tsubasa services start from Tokyo to Yamagata with six-car 400 Series Shinkansen attached to a 200 Series Shinkansen on Tōhoku Shinkansen tracks between Tokyo and Fukushima.
- 1 December 1995: Trains are extended to seven cars.
- 4 December 1999: Line is extended to Shinjō.
- 21 September 2001: Double-decker E4 Series Shinkansen replace the 200 series trains on the Tōhoku Shinkansen.
- 18 March 2007: All cars are made non-smoking.
- 20 December 2008: E3-2000 series trains enter service
- 18 April 2010: 400 series trains cease operations.
- 11 March 2011: All services are suspended due to the Tōhoku earthquake and tsunami.
- 31 March 2011: Partial services resume between Fukushima and Shinjō.
- 12 April 2011: Through-service resumed between Tokyo and Shinjō but at half of previous capacity.[4]
- 13 February 2021: Services suspended north of Nasushiobara Station due to the 2021 Fukushima earthquake.[5]
- 9 June 2022: The line celebrates 30 years of operation. An E3 series trainset will be wrapped in a commemorative livery and will stay in service until November 2022.[6]
References
- ^ "300km/hのトップランナー" [300 km/h Top Runners]. Japan Railfan Magazine. Vol. 52, no. 612. Japan: Koyusha Co., Ltd. April 2012. p. 14.
- ^ a b "Yamagata Shinkansen Line turns 20". The Japan Times. Japan: The Japan Times Ltd. 3 July 2012. p. 2. Archived from the original on 25 July 2012. Retrieved 30 December 2013.
- ^ "Yamagata mini-Shinkansen base tunnel proposal makes progress". Railway Gazette International. 7 November 2022. Retrieved 12 November 2022.
- ^ NHK, "Yamagata Shinkansen fully resumes operations", 12 April 2011.
- ^ "Tohoku Shinkansen line breaks from the base of utility poles" (in Japanese). TBS News. 14 February 2021. Retrieved 14 February 2021.
{{cite news}}
: CS1 maint: url-status (link) - ^ "山形新幹線開業30周年を記念したラッピング車両を運転" [Driving a wrapping vehicle commemorating the 30th anniversary of the opening of the Yamagata Shinkansen]. Japan Railfan Magazine Online (in Japanese). 7 June 2022. Archived from the original on 7 June 2022. Retrieved 8 June 2022.
External links
- Stations of Yamagata Shinkansen (JR East) (in Japanese)