Wind power in South Australia: Difference between revisions
→Wind farm overview: removed Clear template, made for some unnecessary amount of white space |
ScottDavis (talk | contribs) m →Wind farm proposals: updated Barn Hill and Ceres - not dead |
||
Line 211: | Line 211: | ||
|[[AGL Energy]] |
|[[AGL Energy]] |
||
|2009 approved, 2013 revised<ref>{{Cite news|url=http://www.abc.net.au/news/2013-09-03/council-panel-back-changes-to-barn-hill-wind-farm-plan/4931184|title=Council panel backs changes to Barn Hill wind farm plan|website=ABC News|date=2 September 2013 |language=en-AU|access-date=2016-03-20|archive-date=7 May 2016|archive-url=https://web.archive.org/web/20160507135439/http://www.abc.net.au/news/2013-09-03/council-panel-back-changes-to-barn-hill-wind-farm-plan/4931184|url-status=live}}</ref> |
|2009 approved, 2013 revised<ref>{{Cite news|url=http://www.abc.net.au/news/2013-09-03/council-panel-back-changes-to-barn-hill-wind-farm-plan/4931184|title=Council panel backs changes to Barn Hill wind farm plan|website=ABC News|date=2 September 2013 |language=en-AU|access-date=2016-03-20|archive-date=7 May 2016|archive-url=https://web.archive.org/web/20160507135439/http://www.abc.net.au/news/2013-09-03/council-panel-back-changes-to-barn-hill-wind-farm-plan/4931184|url-status=live}}</ref> |
||
| AGL target investment decision Mid 2023<ref>{{cite web |url=https://www.agl.com.au/content/dam/digital/agl/documents/about-agl/media-centre/2022/220503-agl-to-partner-with-global-infrastructure-partners-to-establish-$2-billion-energy-transition-investment-partnership-etip.pdf |date=3 May 2022 |publisher=[[AGL Energy]] |title=AGL to partner with Global Infrastructure Partners to establish $2 billion Energy Transition Investment Partnership (ETIP) |access-date=9 January 2023}}</ref> |
|||
|Unknown, AGL still holds the rights in 2019<ref>{{cite web |url=https://www.2019annualreport.agl.com.au/financial-report/notes-to-the-consolidated-financial-statements/subsidiaries |title=27. Subsidiaries |publisher=[[AGL Energy]] |date=30 June 2019 |work=Annual Report |access-date=6 November 2019 |archive-date=6 November 2019 |archive-url=https://web.archive.org/web/20191106003558/https://www.2019annualreport.agl.com.au/financial-report/notes-to-the-consolidated-financial-statements/subsidiaries |url-status=live }}</ref> |
|||
|- |
|- |
||
| 600 ||[[Ceres Project]] |
| 600 ||[[Ceres Project]] |
||
|Yorke Peninsula || [[Senvion]] Australia || Approved 2014.<br/>Revised plan approved August 2019<ref>{{cite news |url=https://reneweconomy.com.au/massive-south-australia-wind-farm-undersea-cable-project-wins-new-approval-62508/ |title=Massive South Australia wind farm, undersea cable project wins new approval |first=Sophie |last=Vorrath |date=27 August 2019 |access-date=28 August 2019 |archive-date=28 August 2019 |archive-url=https://web.archive.org/web/20190828100503/https://reneweconomy.com.au/massive-south-australia-wind-farm-undersea-cable-project-wins-new-approval-62508/ |url-status=live }}</ref> |
|Yorke Peninsula || [[Spark Renewables]] (acquired May 2022 from [[Senvion]] Australia) || Approved 2014.<br/>Revised plan approved August 2019<ref>{{cite news |url=https://reneweconomy.com.au/massive-south-australia-wind-farm-undersea-cable-project-wins-new-approval-62508/ |title=Massive South Australia wind farm, undersea cable project wins new approval |first=Sophie |last=Vorrath |date=27 August 2019 |access-date=28 August 2019 |archive-date=28 August 2019 |archive-url=https://web.archive.org/web/20190828100503/https://reneweconomy.com.au/massive-south-australia-wind-farm-undersea-cable-project-wins-new-approval-62508/ |url-status=live }}</ref> New owner preparing fresh development application<ref>{{cite web |url=https://sparkrenewables.com/projects/ceres-wind-farm/ |title=Ceres Wind Farm |publisher=[[Spark Renewables]] |access-date=9 January 2023}}</ref> |
||
|Unknown |
|||
|2021<ref>{{Cite news |url=https://www.adelaidenow.com.au/business/sa-business-journal/senvions-yorke-peninsula-wind-project-put-on-hold-again/news-story/c575fd84a5109bc1a8bb41543723ac69 |title=Senvion's Yorke Peninsula wind project put on hold again |first=Luke |last=Griffiths |newspaper=The Advertiser |date=15 September 2017 |access-date=30 September 2018 |archive-date=4 September 2021 |archive-url=https://web.archive.org/web/20210904063505/https://www.adelaidenow.com.au/business/sa-business-journal/senvions-yorke-peninsula-wind-project-put-on-hold-again/news-story/c575fd84a5109bc1a8bb41543723ac69?nk=24277fdc265d50703d53f8a8eb84024e-1630737305 |url-status=live }}</ref> |
|||
|- |
|- |
||
|? - 26 turbines |
|? - 26 turbines |
Revision as of 07:57, 9 January 2023
Wind power became a significant energy source within South Australia over the first two decades of the 21st century. In 2015, there was an installed capacity of 1,475 MW, which accounted for 34% of electricity production in the state.[1] This accounted for 35% of Australia's installed wind power capacity.[1] In 2021, there was an installed capacity of 2052.95 MW, which accounted for 42.1% of the electricity production in the state in 2020.[2][3]
The development of wind power capacity in South Australia has been encouraged by a number of factors. These include the Australian Government's Renewable Energy Target, which require electricity retailers to source a proportion of energy from renewable sources, incentives from the South Australian Government including a supportive regulatory regime and a payroll tax rebate scheme for large scale renewable energy developments. Also the state's proximity to the Roaring forties means there are high quality wind resources for wind farms to exploit. In mid-2009, RenewablesSA was established by the South Australian Government to encourage further investment in renewable energy in the state.[4]
The load factor (or capacity factor) for South Australian wind farms is usually in the range of 32-38%. This means that a wind farm could typically produce between 32 and 38% of its nameplate capacity averaged over a year.[5]
Wind farm overview
In 2003 the only large wind turbine in South Australia was a 0.15 MW unit at Coober Pedy and by early 2004 there was 34 MW of installed wind power capacity.[5][unreliable source?]
As of December 2010, South Australia had thirteen operational wind farms, with an installed capacity of 1,018 MW. By August 2014 this has increased to 1,473 MW, accounting for 27 per cent of electricity production.[6] As of late 2015 there are a large range of new wind farms in various stages of planning but only one under construction, the Hornsdale Wind Farm. Hornsdale is a place that was generating 86 MW immediately prior to the 2016 South Australian blackout in September 2016.[7]
South Australia has provided regulatory certainty for wind farms, and the government has implemented land use planning policies which represent national best practice for accommodating wind farms.[8] On 2 June 2009, Premier Mike Rann announced plans to increase South Australia's renewable energy production target to 33% by 2020, well above the national target of 20% by 2020.[8][needs update]
Installed capacity (MW) |
Wind farm | Owner | Stage | Installed capacity (MW) |
Generating since... |
---|---|---|---|---|---|
368.7 | Snowtown wind farm | Tilt Renewables | 1 | 98.7 | September 2008 |
2 | 270 | October 2014 | |||
350.7 | Hallett Wind Farm | AGL Energy | 1 | 94.5 | March 2007 |
2 | 71.4 | September 2009 | |||
4 | 132.3 | August 2010 | |||
5 | 52.5 | July 2011 | |||
316.8 | Hornsdale Wind Farm | Neoen | 1 | 102.4 | June 2016 |
2 | 102.4 | February 2017 | |||
3 | 112 | August 2017 | |||
278.5 | Lake Bonney Wind Farm | Infigen Energy | 1 | 80.5 | March 2005 |
2 | 159 | April 2008 | |||
3 | 39 | September 2009 | |||
130.8 | Waterloo Wind Farm | Palisade Investment Partners | 1 | 111 | November 2010 |
2 | 19.8 | November 2016 | |||
126 | Lincoln Gap Wind Farm | Nexif Energy | 1 | 126 | April 2019 |
2 | 86 | ||||
119 | Willogoleche Wind Farm | Engie | - | 119 | August 2018 |
90.75 | Wattle Point Wind Farm | AGL Energy | - | 90.75 | April 2005 |
70 | Mount Millar Wind Farm | Meridian Energy | - | 70 | February 2006 |
66 | Cathedral Rocks Wind Farm | EnergyAustralia/ Acciona |
- | 66 | September 2005 |
56.7 | Clements Gap Wind Farm | Pacific Hydro | - | 56.7 | February 2010 |
46 | Canunda Wind Farm | Engie/Mitsui | - | 46 | March 2005 |
33 | Starfish Hill Wind Farm | RATCH-Australia | - | 33 | September 2003 |
Operational wind farms
Snowtown Wind Farm (369 MW)
It is located on the Barunga Range of hills west of Snowtown in the mid-North of South Australia and around 150 km north of the state capital, Adelaide. The first stage of the Snowtown wind farm with a capacity of 98.7 MW was completed in 2008.[9] The 270 MW second stage was completed in November 2014.[10]
Hallett Wind Farm (350 MW)
Hallett Wind Farm was developed in four stages: Hallett 1 (also known as Brown Hill Wind Farm), Hallett 2 (Hallett Hill), Hallett 4 (North Brown Hill) and Hallett 5 (Bluff Range). The proposed Hallett 3 (Mt Bryan) wind farm was put on hold by AGL in 2012.[11]
Hallett 1 consists of 45 Suzlon 2.1 MW S88 turbines (95 MW in total) and was completed in June 2008. Hallett 2 consists of 34 2.1 MW Suzlon turbines (71.4 MW in total) and was completed in late 2009. Hallett 4 has 63 turbines with a total installed capacity of 132 MW, and was in full operation in early 2011. Hallett 5 consists of 25 Suzlon turbines each of 2.1 MW and was completed in early 2012.
Hornsdale Wind Farm (315 MW)
Hornsdale Wind Farm was built in three stages. Construction of Stage 1 began in September 2015 and was finished in September 2017. Stage 1 consists of 32 turbines each having a rated capacity of 3.2 MW (total 102.4 MW). Construction of Stage 2 began in July 2016 and was finished in June 2017. Stage 2 consists of 32 turbines each having a rated capacity of 3.2 MW (total 102.4 MW). Construction of Stage 3 began in April 2017 and was finished in December 2017. Stage 3 consists of 35 turbines each having a rated capacity of 3.2 MW (total 112 MW).
Lake Bonney Wind Farm (278.5 MW)
Lake Bonney Wind Farm was built in three stages. Stage 1 consists of 46 turbines each having a rated capacity of 1.75 MW (total 80.5 MW) and was finished in March 2005. Construction of Stage 2 began in November 2006 and was finished around April 2008. Stage 2 consists of 53 turbines of 3 MW (total 159 MW). Stage 3 consists of 13 turbines of 3 MW (total 39 MW). The combined capacity of the three stages are 278.5 MW making it the biggest wind farm in Australia at the time of completion.[12][unreliable source?]
Lincoln Gap (212 MW)
Lincoln Gap Wind Farm is built on the hills above Lincoln Gap, a gap in the range where the Eyre Highway and Whyalla railway line pass through.
Waterloo Wind Farm (131 MW)
The Waterloo Wind Farm was built as a 111 MW wind farm which was completed in 2010 at an estimated cost of $300 million.[13] It had thirty-seven Vestas V90 3 MW turbines along the 18 km wind farm site connected through a 33 kilovolt (kV) internal reticulation network to the wind farm substation. The wind farm is approximately 30 kilometres south-east of the township of Clare and 100 km north of Adelaide.[14] A Stage 2 expansion was approved to add up to an additional 6 turbines to the existing farm and increase its total generating capacity to over 130 MW.[15] The wind farm was expanded with six additional Vestas V117 turbines at the southern end in 2016 at a cost of A$43 million.[16]
Willogoleche Wind Farm (119 MW)
Willogoleche Wind Farm is in the Mid North of South Australia, just west of the town of Hallett.
Wattle Point Wind Farm (91 MW)
Wattle Point Wind Farm is near Edithburgh on the Yorke Peninsula. When it was officially opened in June 2005 it was Australia's largest wind farm at 91 MW. The installation consists of 55 wind turbines and was built at a cost of 165 million Australian dollars.
Mount Millar Wind Farm (70 MW)
Mount Millar Wind Farm is situated on an escarpment between the towns of Cowell and Cleve located 100 kilometres southwest of Whyalla. The 35 wind turbines are positioned on the elongated Mount Millar site (about 7 kilometres in length) to maximise wind exposure and can generate up to 70 megawatts of electricity. Construction of this wind farm started in late 2004 and was completed in December 2005. Power production started in February 2006.[5]
Cathedral Rocks Wind Farm (66 MW)
Cathedral Rocks Wind Farm is in a remote coastal area located near the southern tip of the Eyre Peninsula in South Australia, about 30 km south west of Port Lincoln. It has 33 wind turbines capable of generating 66 MW in total. Construction started in 2004, and the first turbines were commissions in late 2005. The wind farm was fully operational by 2007.[17]
Clements Gap Wind Farm (56 MW)
In February 2010, Pacific Hydro opened the 56.7 MW Clements Gap Wind Farm. The wind farm is located in South Australia's mid-north. The project has 27 x 2.1 MW Suzlon wind turbines, which generate enough electricity for 30,000 homes.[18]
Canunda Wind Farm (46 MW)
Canunda Wind Farm is a $92.5 million, 46 MW wind power project located on grazing land approximately 16 kilometres south of Millicent.[19] The wind farm is made up of 23 Vestas 2.0 MW wind turbines. The project was opened in March 2005.
Starfish Hill Wind Farm (33 MW)
Starfish Hill Wind Farm is near Cape Jervis on the Fleurieu Peninsula. It comprises 22 turbines of 1.5 MW each, with turbines on Starfish Hill on the nearby Salt Creek Hill, giving a combined generating capacity of 33 MW. Starfish Hill Wind Farm was commissioned in September 2003, making it the first major wind farm in South Australia.[20]
Wind farm proposals
This section needs to be updated.(June 2022) |
In addition to its operating wind farms, South Australia has several proposals for new farms at various stages of development. These include:
Designed capacity (MW) |
Wind farm | Location | Developer | Development Status | Expected operational date |
---|---|---|---|---|---|
180 | Barn Hill | Will fill the gap between Snowtown and Clements Gap wind farms on the Barunga Range southwest of Redhill[21] | AGL Energy | 2009 approved, 2013 revised[22] | AGL target investment decision Mid 2023[23] |
600 | Ceres Project | Yorke Peninsula | Spark Renewables (acquired May 2022 from Senvion Australia) | Approved 2014. Revised plan approved August 2019[24] New owner preparing fresh development application[25] |
Unknown |
? - 26 turbines | Crystal Brook energy park | Crystal Brook | Neoen | August 2019 approval[26] | Construction due 12 months from approval |
144-250 | Exmoor | Naracoorte | Acciona | Application lodged 2011,[27] possibly lapsed by 2019 | 2017[28][29] |
412 | Goyder South Wind Farm | Southeast of Burra | Neoen | Under construction | 2024[30] |
105 | Keyneton | Keyneton | Pacific Hydro | 2013 approved.[31] 2019 cancelled.[32] |
Construction was to start mid-2019[33] |
120 | Kongorong | Kongorong (west of Mount Gambier) | RATCH-Australia | Possibly lapsed before 2019 | [29] Not mentioned on company web site[34] |
110 | Kulpara | northwest of Port Wakefield | RATCH-Australia | Possibly lapsed before 2019 | [29] Not mentioned on company web site[34] |
375 | Palmer | Palmer, Tungkillo, Sanderston | Tilt Renewables | In Development, being assessed against other options[35] | Approved 2015, appeals dismissed 2019[36] |
206.5 | Port Augusta Renewable Energy Park | south of Port Augusta | DP Energy and Iberdrola[37] | Under construction | 2022[38] |
14–200[39] | Tungketta Hill/Elliston | Between Elliston and Sheringa[40] | Ausker Energies | Approved | The developer's website (last updated in 2014) said construction would begin when transmission issues are resolved.[39] |
185 | Twin Creek Wind Farm | northeast of Kapunda | RES Australia | May 2019 development consent[41] October 2019 Development approval[42] |
[43] |
350 | Woakwine | near Beachport | Infigen Energy | 2012 approved[44] | [45][29] |
Cancelled wind farm proposals
Myponga Wind Farm
The Myponga Wind Farm was a wind farm proposal by TrustPower in the southern Mount Lofty Ranges, on the Fleurieu Peninsula 50 km south of Adelaide, between the towns of Myponga and Sellicks Beach. Development approval was granted in 2003,[46] and the project was planned to be operational by the end of 2010.[47] The approval was revoked in 2011.[48]
In 2009, TrustPower announced that it would not proceed with the project, because the South Australian government had not approved variations to height, layout and turbine type in the existing planning approval.[49] The requested change was to reduce the number of turbines to 16 but increase their power output and increase the height of the turbines from 100 metres to 110 metres.[50] The planning approval was eventually revoked.[48]
Keyneton
Pacific Hydro proposed to build a 105 MW wind farm near Keyneton east of the Barossa Valley.[51] It was approved by the government in 2013.[31] The proposal was cancelled in October 2019.[32]
Impacts
This section needs to be updated.(June 2022) |
The increasing proportion of renewable energy in the state has caused a significant decrease in the emissions intensity of electricity generation in South Australia.
The rapid development of wind power in South Australia has led to direct economic effects from the construction and operation of wind farms. There has been a total of $2.8 billion in wind power investment up to October 2011 which is estimated to have created 3,000 direct and indirect jobs.[52] Studies into the economic effects of wind farms have reported that a 50 MW installation pays host landholders some $250,000 per year, is constructed by workers who spend up to $1.2 million locally and contributes up to $80,000 annually to community projects.[53]
Policies to streamline the approval process for wind farm developments have met with some community opposition. Specific concerns have been raised by rural residents who claim that wind farms have an unacceptable impact on property values, health and the environment.[54]
There has been some controversy with respect to the impact of the rising share of wind power and other renewables such as solar on retail electricity prices in South Australia. A 2012 report by The Energy Users Association of Australia claimed that retail electricity prices in South Australia were then the third highest in the developed world behind Germany and Denmark, with prices likely to rise to become the most expensive in the near future.[55] The then South Australian Opposition Leader, Isobel Redmond, linked the state's high retail prices for electricity to the Government's policy of promoting development of renewable energy, noting that Germany and Denmark had followed similar policies.[56] On the other hand, it has been noted that the impact of wind power on the merit order effect, where relatively low cost wind power is purchased by retailers before higher cost sources of power, has been credited for a decline in the wholesale electricity price in South Australia.[57] Data compiled by the Australian Energy Market Operator (AEMO) shows South Australian wholesale electricity prices are the third highest out of Australia's five mainland states,[58] with the 2013 South Australian Electricity Report noting that increases in prices were "largely driven by transmission and distribution network price increases".[59]
The South Australian Government has stated that the price increase due to the Australian Government's carbon price (in place from July 2012 to June 2014) was approximately half of that experienced by other states due to the high installed capacity of wind and gas-fired generation.[60]
2011 Renewable Energy Plan
This section needs to be updated. The reason given is: was it successful?.(June 2022) |
In October 2011 the South Australian state Government released a renewable energy plan proposing a range of measures including:[52][61]
- a revised renewable energy target of 33% of the state's electricity production coming from renewable sources by 2020
- a ban on new coal-fired power stations
- greater involvement of local government in the development approval process to promote more effective community engagement
- investigations into increasing the capacity of transmission lines to support renewable energy developments including wind energy
- no wind farms allowed within one kilometre of any home unless agreement is reached between the developer and the home owner.
See also
- List of active power stations in South Australia
- List of onshore wind farms
- List of wind farms in Australia
- List of wind farms in South Australia
- Energy in South Australia
- Renewable energy in Australia
- Wind power in Australia
References
- ^ a b "Clean Energy Australia Report 2015". Archived from the original on 24 December 2016. Retrieved 27 November 2016.
- ^ "OpenNEM: South Australia". opennem.org.au. Archived from the original on 1 June 2021. Retrieved 4 September 2021.
- ^ a b "NEM Generation Information July 2021". AEMO. Retrieved 4 September 2021.
{{cite web}}
: CS1 maint: url-status (link) - ^ "Renewable Energy: - Wind Energy in South Australia". Wind Energy South Australia. Government of South Australia. Archived from the original on 18 October 2012. Retrieved 7 October 2011.
- ^ a b c Wind power and wind farms in South Australia
- ^ Government of South Australia: "Wind energy in South Australia" Archived 16 December 2014 at the Wayback Machine, updated 4 August 2014, retrieved 4 November 2014
- ^ Washington, David; Siebert, Bension (5 October 2016). "Blackout report leaves renewables debate dangling in the breeze". InDaily. Archived from the original on 5 October 2016. Retrieved 5 October 2016.
- ^ a b Government of South Australia (8 December 2010). Renewable Energy in South Australia Archived 24 July 2011 at the Wayback Machine
- ^ "SA welcomes construction of $220m wind farm". ABC. 2 November 2008. Archived from the original on 3 March 2009. Retrieved 2 November 2008.
- ^ Vorrath, Sophie: "South Australia’s 270MW Snowtown takes wind energy to new highs" Archived 4 November 2014 at the Wayback Machine, in RenewEconomy, 3 November 2014
- ^ "AGL scraps current Hallett wind farm proposal". www.businessspectator.com.au. Archived from the original on 7 January 2016. Retrieved 28 December 2015.
- ^ "Wind power and wind farms in South Australia: Wind in the Bush". Archived from the original on 27 October 2009. Retrieved 11 October 2010.
- ^ New, Robert (November 2010). Electricity generation Major development projects - October 2010 listing Archived 16 March 2011 at the Wayback Machine Australian Bureau of Agricultural and Resource Economics, p. 8.
- ^ "Waterloo Wind Farm, a Roaring 40s success". EcoGeneration. January–February 2011. Archived from the original on 6 January 2016. Retrieved 16 January 2011.
- ^ "Waterloo Windfarm Extension Project - EnergyAustralia". EnergyAustralia. Archived from the original on 10 March 2016. Retrieved 20 March 2016.
- ^ "About Us". Waterloo Wind Farm. Archived from the original on 3 June 2019. Retrieved 10 August 2019.
- ^ "Renewable Energy: Cathedral Rocks Wind Farm | EnergyAustralia". EnergyAustralia. Archived from the original on 4 March 2016. Retrieved 28 December 2015.
- ^ Clements Gap Wind Farm opened Archived 5 January 2016 at the Wayback Machine EcoGeneration, 25 February 2010.
- ^ Wind Prospect (undated). Wind: Clean, Safe, Australia's Future Archived 3 July 2007 at the Wayback Machine
- ^ "RATCH - Australia Corporation". www.ratchaustralia.com. Archived from the original on 5 January 2016. Retrieved 28 December 2015.
- ^ David Clarke (3 September 2013). "Barn Hill Wind Farm (Red Hill, Mundoora)". Wind Power in SA. Archived from the original on 24 October 2019. Retrieved 6 November 2019.
- ^ "Council panel backs changes to Barn Hill wind farm plan". ABC News. 2 September 2013. Archived from the original on 7 May 2016. Retrieved 20 March 2016.
- ^ "AGL to partner with Global Infrastructure Partners to establish $2 billion Energy Transition Investment Partnership (ETIP)" (PDF). AGL Energy. 3 May 2022. Retrieved 9 January 2023.
- ^ Vorrath, Sophie (27 August 2019). "Massive South Australia wind farm, undersea cable project wins new approval". Archived from the original on 28 August 2019. Retrieved 28 August 2019.
- ^ "Ceres Wind Farm". Spark Renewables. Retrieved 9 January 2023.
- ^ Denholm, Piper (6 August 2019). "Approval has been given to French company Neoen to build an energy park near Crystal Brook". The Flinders News. Archived from the original on 10 November 2019. Retrieved 10 November 2019.
- ^ Impey, Tash (20 September 2011). "Wind farm planned near Naracoorte". ABC News. Archived from the original on 30 October 2016. Retrieved 10 November 2019.
- ^ "Exmoor Wind Farm - Wind - POWER PLANTS". www.aussierenewables.com. Archived from the original on 30 March 2016. Retrieved 20 March 2016.
- ^ a b c d "Electricity Generation Major Projects". Archived from the original on 10 March 2016. Retrieved 20 March 2016.
- ^ "Neoen gives go ahead on 412 MW wind farm, first stage of its Goyder Renewables Zone in South Australia". Neoen. 17 January 2022. Retrieved 21 February 2022.
- ^ a b Changerathil, Valerina (6 December 2013). "Pacific Hydro wins South Australian government approval for Keyneton wind farm, unlikely before 2015 at least, amid community opposition". The Advertiser. Archived from the original on 18 February 2014. Retrieved 20 March 2016.
- ^ a b ORielly, Michelle (22 October 2019). "Victory: Residents rejoice over Keyneton wind farm development pulled". Barossa and Light Herald. Archived from the original on 24 September 2020. Retrieved 25 October 2019.
- ^ "Have your say on the Keyneton Wind Farm". Pacific Hydro. 14 August 2018. Archived from the original on 30 September 2018. Retrieved 30 September 2018.
- ^ a b "Upcoming Developments". RATCH-Australia. Archived from the original on 25 October 2019. Retrieved 10 November 2019.
- ^ "Palmer Wind Farm". Tilt Renewables. Archived from the original on 14 April 2018. Retrieved 27 November 2019.
- ^ Vorrath, Sophie (28 November 2019). "Tilt Renewables 300MW wind farm gets all clear from S.A. Supreme Court". Renew Economy. Archived from the original on 28 November 2019. Retrieved 7 November 2019.
- ^ Butler, Ben (23 December 2019). "'Shovel ready': Spanish firm to put $500m into Australian wind and solar farm". The Guardian. Archived from the original on 23 December 2019. Retrieved 23 December 2019.
- ^ "FAQ". Port Augusta Renewable Energy Park. DP Energy. Archived from the original on 15 January 2020. Retrieved 23 December 2019.
- ^ a b "Windfarm Developments". Ausker Group of Companies. 15 October 2014. Archived from the original on 29 October 2019. Retrieved 10 November 2019.
We will be commencing construction after the transmission issues on the Eyre Peninsula have been resolved.
- ^ "SA MDD". mmdd.dmitre.sa.gov.au. Archived from the original on 19 March 2016. Retrieved 20 March 2016.
- ^ Vorrath, Sophie (24 May 2019). "Twin Creek wind farm and Australia's biggest battery edge closer to approval". Renew Economy. Archived from the original on 24 May 2019. Retrieved 25 May 2019.
- ^ Vorrath, Sophie (25 October 2019). "Big wind farm and even bigger battery approved for South Australia". Renew Economy. Archived from the original on 25 October 2019. Retrieved 25 October 2019.
- ^ "Twin Creek Wind Farm". RES Australia. Archived from the original on 8 May 2019. Retrieved 25 May 2019.
- ^ "Woakwine Wind Farm gets approved - Infigen Energy". www.infigenenergy.com. Archived from the original on 31 March 2016. Retrieved 20 March 2016.
- ^ "Woakwine windfarm confidence - The South Eastern Times". thesoutheasterntimes.com.au. Archived from the original on 30 March 2016. Retrieved 20 March 2016.
- ^ White, Rod (20 November 2003). "Support for Myponga wind farm". The Times. Archived from the original on 6 July 2011. Retrieved 10 August 2019.
- ^ Nankervis, David (23 August 2009). "Wind farm for Adelaide fringe". Sunday Mail. Archived from the original on 27 August 2009. Retrieved 10 August 2019.
- ^ a b "SA puts foot down on Myponga/Sellicks Hill Wind Farm plan". FarmOnline. Fairfax Media. 24 January 2011. Archived from the original on 13 April 2018. Retrieved 10 August 2019.
- ^ "TPW: TrustPower decides not to proceed with Myponga Wind Farm" (Press release). Trustpower. 10 September 2009. Archived from the original on 20 July 2011. Retrieved 16 October 2010.
- ^ Holloway, Paul (8 September 2009). "Myponga/Sellicks Hill Wind Farm". Government of South Australia. Retrieved 10 September 2009.
- ^ "Executive Summary" (PDF). Proposed Keyneton Wind Farm Development Application. Pacific Hydro. June 2012. Archived (PDF) from the original on 6 March 2019. Retrieved 25 October 2019.
- ^ a b "South Australia's renewable energy plan wins praise". Archived from the original on 13 September 2014. Retrieved 28 July 2012.
- ^ "Benefits of wind energy in Australia". Archived from the original on 1 October 2013. Retrieved 5 August 2012.
- ^ South East residents join wind power protest[permanent dead link ]
- ^ "SA power prices to be highest in the world". Archived from the original on 11 June 2012. Retrieved 23 July 2012.
- ^ "Heat blamed for high SA electricity prices". Australian Broadcasting Corporation. 20 March 2012. Archived from the original on 28 July 2012. Retrieved 28 July 2012.
- ^ "South Australia's big win with wind". 20 March 2012. Archived from the original on 26 May 2012. Retrieved 28 July 2012.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on 13 February 2014. Retrieved 13 August 2014.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "AEMO South Australian Electricity Report". Archived from the original on 7 January 2016. Retrieved 13 August 2014.
- ^ "Electricity and gas prices to jump 18% in SA". Australian Broadcasting Corporation. 14 June 2012. Archived from the original on 23 July 2012. Retrieved 23 July 2012.
- ^ "New rules for wind farms in SA". ninemsn. 19 October 2011. Archived from the original on 16 July 2012.