Jump to content

Line M101 (Beijing Subway): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Dimemice (talk | contribs)
not listing long-term lines that is not even included in Phase 3 plan, too early to list them, as long-term plan can change frequently. Also an update, Line S6 doesn't go to Longwangzhuang
Dimemice (talk | contribs)
No edit summary
Line 14: Line 14:
| locale = [[Tongzhou District, Beijing|Tongzhou]] district<br />[[Beijing]]
| locale = [[Tongzhou District, Beijing|Tongzhou]] district<br />[[Beijing]]
| start = {{stl|BJS|Shangwuyuan}}
| start = {{stl|BJS|Shangwuyuan}}
| end = {{stl|BJS|Zhangjiawan East}}
| end = {{stl|BJS|Zhangjiawandong}}
| stations = 14
| stations = 14
| routes =
| routes =
Line 36: Line 36:
}}
}}


'''Line M101''' of the [[Beijing Subway]] ({{Lang-zh|s=北京地铁M101线|t=|p=}}) is a [[rapid transit]] line under planning in [[Tongzhou District, Beijing|Tongzhou District]], [[Beijing]], [[China]]. It will run from Shangwuyuan station to Zhangjiawan East station. The total length of the line is {{Convert|19|km|}}. It is fully underground. There will be 14 stations. It is scheduled to open in 2027.<ref name=news202204>{{cite web|url=https://www.chinanews.com.cn/sh/2022/04-20/9733738.shtml|title=北京城市副中心M101线最新线路图公布 计划2027年年底通车|date=2022-04-20}}</ref><ref name=rails>{{cite web|url=https://www.rails.cn/download/2022/20220418_%E9%99%84%E4%BB%B61%EF%BC%9A%E5%8C%97%E4%BA%AC%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9AM101%E7%BA%BF%E4%B8%80%E6%9C%9F%E5%B7%A5%E7%A8%8B%E7%8E%AF%E5%A2%83%E5%BD%B1%E5%93%8D%E6%8A%A5%E5%91%8A%E4%B9%A6%EF%BC%88%E5%BE%81%E6%B1%82%E6%84%8F%E8%A7%81%E7%A8%BF%EF%BC%89.pdf|date=2022-04-18|title=北京轨道交通M101线一期工程环境影响报告书(征求意见稿).pdf}}</ref>
'''Line M101''' of the [[Beijing Subway]] ({{Lang-zh|s=北京地铁M101线|t=|p=}}) is a [[rapid transit]] line under planning in [[Tongzhou District, Beijing|Tongzhou District]], [[Beijing]], [[China]]. It will run from Shangwuyuan station to Zhangjiawandong station. The total length of the line is {{Convert|19|km|}}. It is fully underground. There will be 14 stations. It is scheduled to open in 2027.<ref name=news202204>{{cite web|url=https://www.chinanews.com.cn/sh/2022/04-20/9733738.shtml|title=北京城市副中心M101线最新线路图公布 计划2027年年底通车|date=2022-04-20}}</ref><ref name=rails>{{cite web|url=https://www.rails.cn/download/2022/20220418_%E9%99%84%E4%BB%B61%EF%BC%9A%E5%8C%97%E4%BA%AC%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9AM101%E7%BA%BF%E4%B8%80%E6%9C%9F%E5%B7%A5%E7%A8%8B%E7%8E%AF%E5%A2%83%E5%BD%B1%E5%93%8D%E6%8A%A5%E5%91%8A%E4%B9%A6%EF%BC%88%E5%BE%81%E6%B1%82%E6%84%8F%E8%A7%81%E7%A8%BF%EF%BC%89.pdf|date=2022-04-18|title=北京轨道交通M101线一期工程环境影响报告书(征求意见稿).pdf}}</ref>


==Stations==
==Stations==

Revision as of 09:52, 27 January 2023

Line M101
Construction site of Beijing Dajuyuan station
Overview
StatusUnder construction
LocaleTongzhou district
Beijing
Termini
Stations14
Service
TypeRapid Transit
SystemBeijing Subway
Depot(s)Fuhaocun
Rolling stock3 car Type A, reservations for 3+3 car Type A in the future
History
Planned opening2027; 3 years' time (2027) (planned)
Technical
Line length19 km (12 mi)
CharacterUnderground
Operating speed100 km/h (62 mph)

Line M101 of the Beijing Subway (Chinese: 北京地铁M101线) is a rapid transit line under planning in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawandong station. The total length of the line is 19 kilometres (12 mi). It is fully underground. There will be 14 stations. It is scheduled to open in 2027.[1][2]

Stations

station name Connections
English Chinese
Shangwuyuan 商务园
Tongzhou West Railway Station 通州西站
Tongshun Lu 通顺路
Tongzhou Huiyi Zhongxin 通州会议中心
Longwangzhuang 龙旺庄
Tonghu Dajie 通胡大街  M103 
Yudaihe Dajie 玉带河大街
Beijing Sub-Center Railway Station 城市副中心站  Pinggu  (U/C)
 6  (via Beiyunhedong)
Xingzheng Bangong Xiqu 行政办公西区
Beijing Dajuyuan 北京大剧院
Tiyu Zhongxin 体育中心
Zhangjiawanxi 张家湾西
Zhangjiawan 张家湾
Zhangjiawandong 张家湾东

References

  1. ^ "北京城市副中心M101线最新线路图公布 计划2027年年底通车". 2022-04-20.
  2. ^ "北京轨道交通M101线一期工程环境影响报告书(征求意见稿).pdf" (PDF). 2022-04-18.