Jump to content

Nallurhalli metro station: Difference between revisions

Coordinates: 12°58′36″N 77°43′29″E / 12.976528°N 77.724763°E / 12.976528; 77.724763
From Wikipedia, the free encyclopedia
Content deleted Content added
Entry/Exit: Modified the information in the wiki page
Update from BMRCL
Line 31: Line 31:
| ADA = Yes {{access icon}}
| ADA = Yes {{access icon}}
| status = Staffed
| status = Staffed
| code = TBC
| code = VDHP
| owned = [[Namma Metro]]
| owned = [[Namma Metro]]
| architect =
| architect =

Revision as of 07:28, 5 April 2023

Nallurhalli
Namma Metro station
Nallurhalli metro station
General information
LocationVijaynagar, KIADB Export Promotion Industrial Area, Whitefield, Bengaluru, Karnataka 560066
Coordinates12°58′36″N 77°43′29″E / 12.976528°N 77.724763°E / 12.976528; 77.724763
Owned byNamma Metro
Operated byBangalore Metro Rail Corporation Ltd (BMRCL)
Line(s) Purple Line 
PlatformsSide platform
Platform-1 → Whitefield (Kadugodi)
Platform-2 → Krishnarajapuram
(to be extended to Baiyappanahalli and Kengeri around June 2023)
Tracks2
Construction
Structure typeElevated
Platform levels2
ParkingCar parking Two Wheelers
AccessibleYes Disabled access
Other information
StatusStaffed
Station codeVDHP
History
Opened26 March 2023; 20 months ago (2023-03-26)
Electrified750 V DC third rail
Services
Preceding station Namma Metro Following station
Sri Sathya Sai Hospital
towards Whitefield
Purple Line Kundalahalli
Purple Line
(Future service)
Kundalahalli
towards Kengeri
Location
Map

Nallurhalli is a metro station on the east-west corridor of the Purple Line of Namma Metro. Around this station, holds the GE Healthcare centre followed by some locations like CWC CFS Container Services, Flipkart ITPL Hub and many more.[1][2][3]

The Whitefield - Krishnarajapura trial runs were successfully conducted from 25 October for a month.[4] This metro station was inaugurated on March 25 2023 by Prime Minister Narendra Modi and was commenced to the public on March 26 2023.[5][6][7][8][9]

Station Layout

G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Eastbound
Towards → Whitefield (Kadugodi) next station is Sri Sathya Sai Hospital
Platform 2
Westbound
Towards ← Krishnarajapuram next station is Kundalahalli (to be further extended to Baiyappanahalli and Kengeri metro stations around June 2023)
Side platform | Doors will open on the left Disabled access
L2

Entry/Exit

There are 2 Entry/Exit points - A and B. Commuters can use either of the points for their travel.

  • Entry/Exit point A - Towards GE HealthCare side
  • Entry/Exit point B - Towards Prasad Tech Park side

See also

References

  1. ^ Rustagi, Abha (5 May 2022). "Baiyappanahalli-Whitefield Line to be functional from Dec 2022". Metro Rail News. Retrieved 21 June 2022.
  2. ^ "Baiyappanahalli-Whitefield Metro stretch to have 13 stops". The New Indian Express. 14 September 2017. Retrieved 28 November 2022.
  3. ^ "Namma Metro: Why upcoming Whitefield stretch is a game changer for Bengaluru?". TimesNow. 5 March 2023. Retrieved 5 March 2023.
  4. ^ "Baiyappanahalli-Whitefield metro line trial from October 25". Deccan Herald. 5 October 2022. Retrieved 6 October 2022.
  5. ^ "Metro finally comes to Whitefield, take a ride on March 26 from 7 am!". Deccan Herald. 26 March 2023. Retrieved 26 March 2023.
  6. ^ "Bengaluru Metro: Much awaited metro line between Whitefield to KR Puram to be operational by March". TimesNow. 25 November 2022. Retrieved 28 November 2022.
  7. ^ Bureau, The Hindu (3 February 2023). "Namma Metro train between K.R. Puram and Whitefield to run at frequency of 10 minutes". The Hindu. ISSN 0971-751X. Retrieved 3 February 2023. {{cite news}}: |last= has generic name (help)
  8. ^ "ಮಾರ್ಚ್ 25ಕ್ಕೆ ವೈಟ್‌ಫೀಲ್ಡ್-ಕೆಆರ್ ಪುರಂ ಮೆಟ್ರೋ ಸೇವೆ ಲೋಕಾರ್ಪಣೆ?". Kannadaprabha (in Kannada). Retrieved 14 March 2023.
  9. ^ "BMRCL to zoom metro from KR Puram to Whiefield in 22 minutes". The New Indian Express. Retrieved 2 March 2023.