Jump to content

Line M101 (Beijing Subway): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Jax-wp (talk | contribs)
Stations: Uncommented transfers to M102-104 and S6, as these were included in same planning document as M101. Did not (yet) uncomment Tongmi line and line 18, though included in Chinese Wikipedia, as these were not mentioned in said document.
Jax-wp (talk | contribs)
m Stations: Forgot to add "(under planning)" to M103. Also re-commented S6 "out of an abundance of caution" because of an earlier claim of updated information that S6 won't stop there.
Line 67: Line 67:
|{{stl|BJS|Longwangzhuang}}
|{{stl|BJS|Longwangzhuang}}
|{{large|{{lang|zh-cn|龙旺庄}}}}
|{{large|{{lang|zh-cn|龙旺庄}}}}
|<!--{{rint|beijing|18|na}}-->S6 (under planning)
|<!--{{rint|beijing|18|na}} S6 (under planning)-->
|-
|-
|{{stl|BJS|Tonghu Dajie}}
|{{stl|BJS|Tonghu Dajie}}
|{{large|{{lang|zh-cn|通胡大街}}}}
|{{large|{{lang|zh-cn|通胡大街}}}}
|{{rint|beijing|M103|na}}
|{{rint|beijing|M103|na}} (under planning)
|-
|-
|{{stl|BJS|Yudaihe Dajie}}
|{{stl|BJS|Yudaihe Dajie}}

Revision as of 09:53, 18 April 2023

Line M101
Construction site of Beijing Dajuyuan station
Overview
StatusUnder construction
LocaleTongzhou district
Beijing
Termini
Stations14
Service
TypeRapid Transit
SystemBeijing Subway
Depot(s)Fuhaocun[1]
Rolling stock3 car Type A, reservations for 3+3 car Type A in the future
History
Planned opening2027; 3 years' time (2027) (planned)
Technical
Line length18.1 km (11.2 mi)[1]
CharacterUnderground
Operating speed100 km/h (62 mph)

Line M101 of the Beijing Subway (Chinese: 北京地铁M101线) is a rapid transit line under construction in Tongzhou District, Beijing, China. It will run from Shangwuyuan station to Zhangjiawandong station. It is fully underground. It is scheduled to open in 2027.[2][3] The line will be 18.1 kilometres (11.2 mi) in length with 14 stations.[1]

Stations

station name Connections
English Chinese
Shangwuyuan 商务园
Tongzhou West Railway Station 通州西站  M102  (under planning)
Tongshun Lu 通顺路
Tongzhou Huiyi Zhongxin 通州会议中心
Longwangzhuang 龙旺庄
Tonghu Dajie 通胡大街  M103  (under planning)
Yudaihe Dajie 玉带河大街
Beijing Sub-Center Railway Station 城市副中心站  Pinggu  (U/C)
 6  (via Beiyunhedong)
Xingzheng Bangong Xiqu 行政办公西区
Beijing Dajuyuan 北京大剧院  M104  (under planning)
Tiyu Zhongxin 体育中心
Zhangjiawanxi 张家湾西
Zhangjiawan 张家湾  M102  (under planning)  M104  (under planning)
Zhangjiawandong 张家湾东

References

  1. ^ a b c "2023年京投公司重大投资项目情况". 2023-02-23. Archived from the original on 2023-02-25.
  2. ^ "北京城市副中心M101线最新线路图公布 计划2027年年底通车". 2022-04-20.
  3. ^ "北京轨道交通M101线一期工程环境影响报告书(征求意见稿).pdf" (PDF). 2022-04-18.