Jump to content

Accra Skytrain: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Jjmerelo (talk | contribs)
m Changing verbal tense to reflect the fact that it's not happening.
Jjmerelo (talk | contribs)
m It's already updated.
Line 1: Line 1:
{{outdated|date=December 2022}}
{{Infobox Public transit
{{Infobox Public transit
| name = Accra Skytrain
| name = Accra Skytrain

Revision as of 09:13, 21 May 2023

Accra Skytrain
Overview
LocaleAccra
Transit typeLight rapid transit system
Number of lines5
Operation
Operator(s)AiSkyTrain
Technical
System length194 km (121 mi)
Track gauge1 metre

Accra SkyTrain was projected as a fully automated, elevated light railway metro network for Accra, Greater Accra, Ghana. The proposed network would have five routes, four of which are radial routes that originate at a new terminal at the Kwame Nkrumah Interchange, and another route that loops around the city. The total track length across all routes would have been 194 kilometres (121 mi).[1]

The announced system was going to use the Aeromovel technology and will have capacity to carry 10,000 passengers per hour per direction on each route.[2]

In 2018 the Government of Ghana signed a MOU with AiSky Train Consortium of South Africa. Following completion of a feasibility study, in November 2019 the parties signed a build–operate–transfer concession agreement. The company will develop the system at an estimated cost of $2.6 billion. The government has said the project is a "100% private sector owned project" and is not government funded.

No work has commenced and the project has been delayed due to legal questions and the coronavirus pandemic. In February 2021 the government announced it was intending to proceed but was waiting for reports from the Attorney General before submitting legislation to the parliament.[3] By November that year it was finally revealed that it would not be made.[4]

2010 monorail proposal

Accra Monorail was a 2010 proposal for a monorail line with 16 stations for Accra.[5] The project did not proceed passed the planning stage.

External References

References

  1. ^ "Government still processing sky train project – Kwaku Ofori Asiamah".
  2. ^ "THE ACCRA SKYTRAIN™ PROJECT" (PDF). Retrieved 13 June 2021.
  3. ^ "Government still processing sky train project – Kwaku Ofori Asiamah". 24 February 2021. Retrieved 13 June 2021.
  4. ^ "Ghana's plan to build sky trains in Accra for $2.6 billion isn't happening after all". 25 November 2021. Retrieved 21 May 2023.
  5. ^ "Monorail system being planned for Accra". Ghana News Agency. 23 July 2010. Retrieved 9 October 2011.