Chiswick Road station: Difference between revisions
→History: update |
|||
Line 33: | Line 33: | ||
In 2003, Chiswick Road was one of five stops on the B branch proposed for closure, due to having a low average daily ridership and being located quite close to nearby, better-used stops.<ref name=drops>{{cite news |url=http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey?mode=PF |title=T drops 4 Green Line stops after results of rider survey |newspaper=Boston Globe |date=16 March 2005 |archiveurl=https://web.archive.org/web/20050318030644/http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey/ |archivedate=18 March 2005 |author=Daniel, Mac |accessdate=6 June 2016}}</ref> Chiswick Road was dropped from the proposal shortly after it was announced due to opposition from residents of a local housing project for the elderly served by the stop.<ref name="drops" /> The other four stops (Fordham Road, Summit Avenue, Mount Hood Road, and Greycliff Road) were provisionally closed on April 20, 2004, which was made permanent on March 15, 2005.<ref name="drops" /><ref>{{cite web |archiveurl=https://web.archive.org/web/20101126012518/http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0504.pdf |url=http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0504.pdf |archivedate=26 November 2010 |title=Green Line B Branch Service Enhancements |work=TRANSreport |publisher=Boston Regional Metropolitan Planning Organization |date=May 2004 |accessdate=6 February 2014}}</ref> |
In 2003, Chiswick Road was one of five stops on the B branch proposed for closure, due to having a low average daily ridership and being located quite close to nearby, better-used stops.<ref name=drops>{{cite news |url=http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey?mode=PF |title=T drops 4 Green Line stops after results of rider survey |newspaper=Boston Globe |date=16 March 2005 |archiveurl=https://web.archive.org/web/20050318030644/http://www.boston.com/news/local/articles/2005/03/16/t_drops_4_green_line_stops_after_results_of_rider_survey/ |archivedate=18 March 2005 |author=Daniel, Mac |accessdate=6 June 2016}}</ref> Chiswick Road was dropped from the proposal shortly after it was announced due to opposition from residents of a local housing project for the elderly served by the stop.<ref name="drops" /> The other four stops (Fordham Road, Summit Avenue, Mount Hood Road, and Greycliff Road) were provisionally closed on April 20, 2004, which was made permanent on March 15, 2005.<ref name="drops" /><ref>{{cite web |archiveurl=https://web.archive.org/web/20101126012518/http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0504.pdf |url=http://ctps.org/bostonmpo/4_resources/2_transreport/archive/trpt0504.pdf |archivedate=26 November 2010 |title=Green Line B Branch Service Enhancements |work=TRANSreport |publisher=Boston Regional Metropolitan Planning Organization |date=May 2004 |accessdate=6 February 2014}}</ref> |
||
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops. |
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.<ref>{{cite web |url=https://cdn.mbta.com/sites/default/files/2021-05/2021-05-28-swa-initiatives-accessible.pdf |title=System-Wide Accessibility Initiatives—May 2021 |date=May 24, 2021 |first=Laura |last=Brelsford |publisher=Massachusetts Bay Transportation Authority Department of System-Wide Accessibility |pages=4–5}}</ref> Design for Chiswick Road and four other B Branch stops was 30% complete by December 2022.<ref name=swadec2022>{{cite web |url=https://cdn.mbta.com/sites/default/files/2022-12/2022-12-7-swa-initiatives-report-december-accessible.pdf |title=System-Wide Accessibility Initiatives—December 2022 |date=December 6, 2022 |publisher=Massachusetts Bay Transportation Authority Department of System-Wide Accessibility |pages=4–5}}</ref> {{As of|June 2023}}, construction is expected to take place during 2024.<ref name=swajun32023>{{cite web |url=https://cdn.mbta.com/sites/default/files/2023-06/2023-06-05-swa-initiatives-june-2023-accessible.pdf |title=System-Wide Accessibility Initiatives—June 2023 |date=June 5, 2023 |publisher=Massachusetts Bay Transportation Authority Department of System-Wide Accessibility |page=4}}</ref> |
||
==References== |
==References== |
Revision as of 22:31, 7 June 2023
Chiswick Road | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||
Location | Commonwealth Avenue at Chiswick Road Brighton, Boston, Massachusetts | ||||||||||
Coordinates | 42°20′27″N 71°09′02″W / 42.340839°N 71.150459°W | ||||||||||
Platforms | 2 side platforms | ||||||||||
Tracks | 2 | ||||||||||
Passengers | |||||||||||
2011 daily | 615[1] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Chiswick Road station is a light rail station on the MBTA's Green Line B branch, located in the median of Commonwealth Avenue north of Chiswick Road in the Brighton neighborhood of Boston, Massachusetts. Chiswick Road consists of two side platforms, which serve the B branch's two tracks.
History
In 2003, Chiswick Road was one of five stops on the B branch proposed for closure, due to having a low average daily ridership and being located quite close to nearby, better-used stops.[2] Chiswick Road was dropped from the proposal shortly after it was announced due to opposition from residents of a local housing project for the elderly served by the stop.[2] The other four stops (Fordham Road, Summit Avenue, Mount Hood Road, and Greycliff Road) were provisionally closed on April 20, 2004, which was made permanent on March 15, 2005.[2][3]
Track work in 2018–19, which included replacement of platform edges at several stops, triggered requirements for accessibility modifications at those stops.[4] Design for Chiswick Road and four other B Branch stops was 30% complete by December 2022.[5] As of June 2023[update], construction is expected to take place during 2024.[6]
References
- ^ "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
- ^ a b c Daniel, Mac (16 March 2005). "T drops 4 Green Line stops after results of rider survey". Boston Globe. Archived from the original on 18 March 2005. Retrieved 6 June 2016.
- ^ "Green Line B Branch Service Enhancements" (PDF). TRANSreport. Boston Regional Metropolitan Planning Organization. May 2004. Archived from the original (PDF) on 26 November 2010. Retrieved 6 February 2014.
- ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. pp. 4–5.
- ^ "System-Wide Accessibility Initiatives—December 2022" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 6, 2022. pp. 4–5.
- ^ "System-Wide Accessibility Initiatives—June 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. June 5, 2023. p. 4.
External links
Media related to Chiswick Road station at Wikimedia Commons