Natomas/Sacramento Airport station: Difference between revisions
Appearance
Content deleted Content added
Thehusband (talk | contribs) Adding north valley rail Tag: Reverted |
Thehusband (talk | contribs) Adding north valley rail Tag: Reverted |
||
Line 29: | Line 29: | ||
|system3=Altamont Corridor Express |
|system3=Altamont Corridor Express |
||
|line3=Valley Rail|right3=Old North Sacramento|to-right3=Ceres |
|line3=Valley Rail|right3=Old North Sacramento|to-right3=Ceres |
||
| |
|system4=North Valley Rail |
||
|line4=North Valley Rail|right4=Chico|to- |
|line4=North Valley Rail|right4=Chico|to-right=terminus |
||
}} |
}} |
||
| map_type = California#USA |
| map_type = California#USA |
Revision as of 04:09, 10 July 2023
Natomas, CA | |||||
---|---|---|---|---|---|
General information | |||||
Location | Blacktop Road, Sacramento, California 95673 | ||||
Coordinates | 38°41′05″N 121°28′48″W / 38.684664°N 121.480089°W | ||||
Line(s) | UP Sacramento Subdivision[1] | ||||
Platforms | 1 side platform | ||||
Tracks | 2 | ||||
Construction | |||||
Accessible | Yes | ||||
History | |||||
Opening | 2026 | ||||
Future service | |||||
Lua error in package.lua at line 80: module 'Module:Adjacent stations/North Valley Rail' not found. | |||||
|
Natomas/Sacramento Airport[2] is a planned train station that will be a stop on Altamont Corridor Express and Amtrak California's San Joaquin services. The station site is in the Natomas area, north of Sacramento, east of Blacktop Road and immediately south of West Elkhorn Boulevard.[3] Planned as the northern terminus of the Valley Rail project, it was expected to open no later than 2023.[2][4] By 2023, then opening date had slipped to 2026.[5] A shuttle bus will provide connectivity for those traveling between the station and Sacramento International Airport, 8 miles (13 km) to the east.
References
- ^ Bizjak, Tony (June 11, 2018). "Catch an Amtrak toward L.A. from midtown Sacramento? Train officials propose new service". Sacramento Bee. Retrieved May 10, 2020.
- ^ a b "Valley Rail Sacramento Extension Project Draft Environmental Impact Report" (PDF). ACE. AECOM. Retrieved May 9, 2020.
- ^ Todd, John (August 10, 2021). "$400M Valley Rail Station Moves Forward". Rio Linda Messenger. Retrieved August 16, 2021.
- ^ Hamann, Emily (September 19, 2019). "Rail plans for San Jose, Stockton move ahead". Sacramento Business Journal. Retrieved May 10, 2020.
- ^ Holland, John (March 13, 2023). "ACE rail expansion runs late, just as Modesto readies its historic downtown depot". Modesto Bee. Retrieved March 13, 2023.