Line 11 (Wuhan Metro): Difference between revisions
Appearance
Content deleted Content added
m Location of Gedian South Station is Ezhou |
mNo edit summary |
||
Line 55: | Line 55: | ||
|style="text-align: left;"|Phase 3 Ezhou Segment<ref>{{Cite web|title=武汉地铁两条新线1月2日开通-荆楚网-湖北日报网|url=http://news.cnhubei.com/content/2021-01/01/content_13537196.html?spm=zm1033-001.0.0.1.SP50YB|access-date=2021-01-01|website=news.cnhubei.com}}</ref> |
|style="text-align: left;"|Phase 3 Ezhou Segment<ref>{{Cite web|title=武汉地铁两条新线1月2日开通-荆楚网-湖北日报网|url=http://news.cnhubei.com/content/2021-01/01/content_13537196.html?spm=zm1033-001.0.0.1.SP50YB|access-date=2021-01-01|website=news.cnhubei.com}}</ref> |
||
|-bgcolor="lightgrey" |
|-bgcolor="lightgrey" |
||
|style="text-align: left;"|East Square of Wuchang Railway Station |
|style="text-align: left;"|East Square of Wuchang Railway Station — Wuhandong Railway Station |
||
|U/C (2024) |
|U/C (2024) |
||
|{{Convert|12.6|km|mi|2|abbr=on}} |
|{{Convert|12.6|km|mi|2|abbr=on}} |
||
Line 61: | Line 61: | ||
|style="text-align: left;"|Phase 2 |
|style="text-align: left;"|Phase 2 |
||
|-bgcolor="lightgrey" |
|-bgcolor="lightgrey" |
||
|style="text-align: left;"|Jiang’an Road |
|style="text-align: left;"|Jiang’an Road — East Square of Wuchang Railway Station |
||
|U/C (2024) |
|U/C (2024) |
||
|{{Convert|4|km|mi|2|abbr=on}} |
|{{Convert|4|km|mi|2|abbr=on}} |
||
Line 67: | Line 67: | ||
|style="text-align: left;"|Phase 3 Wuchang Segment |
|style="text-align: left;"|Phase 3 Wuchang Segment |
||
|-bgcolor="lightgrey" |
|-bgcolor="lightgrey" |
||
|style="text-align: left;"|Huangjinkou |
|style="text-align: left;"|Huangjinkou — Wuhan West Railway Station |
||
|U/C (2027) |
|U/C (2027) |
||
|{{Convert|2|km|mi|2|abbr=on}} |
|{{Convert|2|km|mi|2|abbr=on}} |
||
Line 73: | Line 73: | ||
|style="text-align: left;"|Phase 3 Xinhanyang Segment |
|style="text-align: left;"|Phase 3 Xinhanyang Segment |
||
|-bgcolor="lightgrey" |
|-bgcolor="lightgrey" |
||
|style="text-align: left;"|Wuhan West Railway Station |
|style="text-align: left;"|Wuhan West Railway Station — Jiang’an Road |
||
|U/C (2028) |
|U/C (2028) |
||
|{{Convert|16.2|km|mi|2|abbr=on}} |
|{{Convert|16.2|km|mi|2|abbr=on}} |
Revision as of 09:23, 14 July 2023
Line 11 | |
---|---|
Overview | |
Status | Operating |
Owner | Government of Wuhan |
Locale | Wuhan, Hubei |
Termini | |
Stations | 14 (Operational) 31 (Future) |
Service | |
Type | Rapid transit |
System | Wuhan Metro |
Services | 1 |
Operator(s) | Wuhan Metro Group Co., Ltd. |
Rolling stock | CRRC Zhuzhou Locomotive Chinese Type A[1] |
History | |
Opened | 1 October 2018 |
Technical | |
Line length | 22.530 km (14.00 mi) |
Number of tracks | 2 |
Character | Underground |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Wuhan Metro Line 11 (Chinese: 武汉地铁11号线) is a metro line in Wuhan. This line connects Wuchang with the eastern Optics Valley. Construction of the first section Optic Valley section started on October 28, 2014.[2]
History
Segment | Commencement | Length | Station(s) | Name |
---|---|---|---|---|
Wuhandong Railway Station — Zuoling | 1 October 2018 | 18.744 km (11.65 mi) | 13 | Phase 1 |
Zuoling — Gediannan Railway Station | 2 January 2021 | 3.786 km (2.35 mi) | 1 | Phase 3 Ezhou Segment[3] |
East Square of Wuchang Railway Station — Wuhandong Railway Station | U/C (2024) | 12.6 km (7.83 mi) | 7 | Phase 2 |
Jiang’an Road — East Square of Wuchang Railway Station | U/C (2024) | 4 km (2.49 mi) | 2 | Phase 3 Wuchang Segment |
Huangjinkou — Wuhan West Railway Station | U/C (2027) | 2 km (1.24 mi) | 2 | Phase 3 Xinhanyang Segment |
Wuhan West Railway Station — Jiang’an Road | U/C (2028) | 16.2 km (10.07 mi) | 6 | Phase 4 |
Stations
References
- ^ "First Wuhan-made A-type metro train rolls off the production line".
- ^ sina_mobile (2014-10-28). "武汉地铁11号线光谷段开工:设13站 最早2018年通车". hb.sina.cn. Retrieved 2021-04-09.
- ^ "武汉地铁两条新线1月2日开通-荆楚网-湖北日报网". news.cnhubei.com. Retrieved 2021-01-01.
Wikimedia Commons has media related to Wuhan Metro Line 11.