Jump to content

PCMC Bhavan metro station: Difference between revisions

Coordinates: 18°37′46″N 73°48′12″E / 18.6294°N 73.8033°E / 18.6294; 73.8033
From Wikipedia, the free encyclopedia
Content deleted Content added
Modified look of wikipage
mNo edit summary
Line 36: Line 36:
| opened = {{Start date and age|df=yes|2022|03|6}}
| opened = {{Start date and age|df=yes|2022|03|6}}
| closed = <!-- {{End date|YYYY|MM|DD|df=y}} -->
| closed = <!-- {{End date|YYYY|MM|DD|df=y}} -->
| el = {{25 kV 50 Hz}} [[Overhead line|overhead catenary]]
| passengers =
| passengers =
| pass_year =
| pass_year =

Revision as of 11:18, 9 August 2023

PCMC Bhavan
Pune Metro station
General information
LocationMorewadi, Pimpri Colony, Pimpri Chinchwad, Maharashtra 411018
Coordinates18°37′46″N 73°48′12″E / 18.6294°N 73.8033°E / 18.6294; 73.8033
Owned byMaharashtra Metro Rail Corporation Limited (MAHA-METRO)
Operated byPune Metro
Line(s)Purple Line
PlatformsSide platform
Platform-1 → Civil Court
Platform-2 → Train Terminates Here
Tracks2
Construction
Structure typeElevated, Double track
Platform levels2
AccessibleYes Disabled access
Other information
Station codePIM
History
Opened6 March 2022; 2 years ago (2022-03-06)
Services
Preceding station logo of Pune Metro Pune Metro Following station
Terminus Purple Line Sant Tukaram Nagar
towards Civil Court
Location
Map

PCMC Bhavan is the elevated northern terminal metro station on the North-South corridor of the Purple Line of Pune Metro in Pimpri Chinchwad, India. The station was opened on 6 March 2022 as an inauguration of Pune Metro.[1] From March 2022 to July 2023, the Purple Line operated between PCMC Bhavan and Phugewadi,[2] but from 1 August 2023 the section between Phugewadi and Civil Court metro station came into use, so trains run from PCMC Bhavan to Civil Court.[3]

Station Layout

PCMC Bhavan track layout
to Train Terminates Here
P2
P1
Station with two tracks and two side platforms
G Street level Exit/Entrance
L1 Mezzanine Fare control, station agent, Metro Card vending machines, crossover
L2 Side platform | Doors will open on the left Disabled access
Platform 1
Southbound
Towards → Civil Court next station is Sant Tukaram Nagar
Platform 2
Northbound
Towards ← Train Terminates Here
Side platform | Doors will open on the left Disabled access
L2

An extension has been planned which will remove PCMC station's terminal status and extend the line to Nigdi.[4]

Entry/Exit

See also

References

  1. ^ Mehra, Pallavi, ed. (7 March 2022). "PM Modi inaugurates Pune Metro line; check routes and ticket prices here". Zee News. Retrieved 8 March 2022.
  2. ^ Pandya, Naomi (6 March 2022). "Passenger operations on 12 km routes of Pune Metro launched know all about". Urban Transport News. Retrieved 8 March 2022.
  3. ^ Gadkari, Siddharth (27 July 2023). "It's official, PM to open Pune Metro service on two sections on Aug 1". Hindustan Times.
  4. ^ "Maha-Metro awaits Centre's nod to extend two Pune routes". Hindustan Times. 19 January 2023. Retrieved 3 August 2023.