Orange Line (Bhoj Metro): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Line 48: Line 48:
! English||[[Hindi]]
! English||[[Hindi]]
|-
|-
|1||Karond Chauraha||करोंद चौराहा||Under construction|||None||Elevated||
|1||Karond Chauraha||करोंद चौराहा||Under construction|||None||Elevated
|-
|-
|2||Krishi Upaj Mandi||कृषि उपज मंडी||Under construction|||None||Elevated||
|2||Krishi Upaj Mandi||कृषि उपज मंडी||Under construction|||None||Elevated
|-
|-
|3||DIG Bungalow||डी आइ जी बंगला||Under construction|||None||Elevated||
|3||DIG Bungalow||डी आइ जी बंगला||Under construction|||None||Elevated
|-
|-
|4||Sindhi Colony||सिंधी कॉलोनी||Under construction|||None||Elevated||
|4||Sindhi Colony||सिंधी कॉलोनी||Under construction|||None||Elevated
|-
|-
|5||Nadra Bus Stand||नादरा बस स्टैंड||Under construction||| ||Underground||
|5||Nadra Bus Stand||नादरा बस स्टैंड||Under construction||| ||Underground
|-
|-
|6||Bhopal Railway Station||भोपाल रेलवे स्टेशन||Under construction||| ||Underground||
|6||Bhopal Railway Station||भोपाल रेलवे स्टेशन||Under construction||| ||Underground
|-
|-
|7||Aishbagh||ऐशबाग||Under construction|||None||Elevated||
|7||Aishbagh||ऐशबाग||Under construction|||None||Elevated
|-
|-
|8||Pul Bogda||पुल बोगदा||Under construction||| ||Elevated||
|8||Pul Bogda||पुल बोगदा||Under construction||| ||Elevated
|-
|-
|9||Subhash Nagar||सुभाष नगर||Under construction|||None||Elevated||
|9||Subhash Nagar||सुभाष नगर||Under construction|||None||Elevated
|-
|-
|10||Kendriya Vidyalaya||केन्द्रीय विद्यालय||Under construction|||None||Elevated||
|10||Kendriya Vidyalaya||केन्द्रीय विद्यालय||Under construction|||None||Elevated
|-
|-
|11||Board Office Chauraha||बोर्ड ऑफिस चौराहा||Under construction|||None||Elevated||
|11||Board Office Chauraha||बोर्ड ऑफिस चौराहा||Under construction|||None||Elevated
|-
|-
|12||MP Nagar||एम पी नगर||Under construction|||None||Elevated||
|12||MP Nagar||एम पी नगर||Under construction|||None||Elevated
|-
|-
|13||Rani Kamalapati Railway Station||रानी कमलापति रेलवे स्टेशन||Under construction||| ||Elevated||
|13||Rani Kamalapati Railway Station||रानी कमलापति रेलवे स्टेशन||Under construction||| ||Elevated
|-
|-
|14||DRM Office||डी आर एम ऑफिस||Under construction|||None||Elevated||
|14||DRM Office||डी आर एम ऑफिस||Under construction|||None||Elevated
|-
|-
|15||Alkapuri||अलकापुरी||Under construction|||None||Elevated||
|15||Alkapuri||अलकापुरी||Under construction|||None||Elevated
|-
|-
|16||AIIMS||एम्स||Under construction|||None||Elevated||
|16||AIIMS||एम्स||Under construction|||None||Elevated
|}
|}



Revision as of 11:17, 22 August 2023

Orange Line
Overview
StatusUnder construction
LocaleBhopal, Madhya Pradesh, India
Termini
  • Shubhash Nagar (further extended to Karond Chauraha)
  • AIIMS
Stations
  • 16
  • 8 (Under construction)
Service
TypeRapid transit
SystemBhoj Metro
Operator(s)Madhya Pradesh Metro Rail Corporation Limited
Rolling stockAlstom[1]
Technical
Line length14.99 km (9.31 mi) (Planned)
6.22 km (3.86 mi) (Under construction)
8.77 km (5.45 mi) (Approved)
CharacterElevated & Underground
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC third rail
Operating speed
  • 90 km/h (56 mph) (Top)
  • 32 km/h (20 mph) (average)

The Orange Line (Line 1) (Template:Lang-hi) is an under-construction metro rail line of the Bhoj Metro, a rapid transit system in Bhopal, Madhya Pradesh, India. This line consists of 16 metro stations from Karond Chauraha to AIIMS with a total distance of 27.90 km. However the priority section from Subhash Nagar to AIIMS is in under-construction with a distance of 6.22 km and it is expected to be operational in March 2024.[2][3][4][5]

List of stations

Following is a list of stations on this route:

Orange Line
# Station Name Opening Connections Layout
English Hindi
1 Karond Chauraha करोंद चौराहा Under construction None Elevated
2 Krishi Upaj Mandi कृषि उपज मंडी Under construction None Elevated
3 DIG Bungalow डी आइ जी बंगला Under construction None Elevated
4 Sindhi Colony सिंधी कॉलोनी Under construction None Elevated
5 Nadra Bus Stand नादरा बस स्टैंड Under construction Underground
6 Bhopal Railway Station भोपाल रेलवे स्टेशन Under construction Underground
7 Aishbagh ऐशबाग Under construction None Elevated
8 Pul Bogda पुल बोगदा Under construction Elevated
9 Subhash Nagar सुभाष नगर Under construction None Elevated
10 Kendriya Vidyalaya केन्द्रीय विद्यालय Under construction None Elevated
11 Board Office Chauraha बोर्ड ऑफिस चौराहा Under construction None Elevated
12 MP Nagar एम पी नगर Under construction None Elevated
13 Rani Kamalapati Railway Station रानी कमलापति रेलवे स्टेशन Under construction Elevated
14 DRM Office डी आर एम ऑफिस Under construction None Elevated
15 Alkapuri अलकापुरी Under construction None Elevated
16 AIIMS एम्स Under construction None Elevated

See also

References

  1. ^ "Alstom commences production of rolling stock for Bhopal, Indore Metro Project". www.aninews.in. Retrieved 22 August 2023.
  2. ^ "All You Need to Know About Bhopal and Indore Metro Projects". www.metrorailnews.in. Retrieved 22 August 2023.
  3. ^ "Bhopal Metro Project - Route Map, Proposed Lines, Latest Updates & More". www.magicbricks.com. Retrieved 22 August 2022.
  4. ^ "Find Out All About Bhopal Metro, Map, Timings, Route and its Impact on Bhopal Real Estate Market". www.ghar.tv. Retrieved 22 August 2022.
  5. ^ "Find Out All About Bhopal Metro, Map, Timings, Route and its Impact on Bhopal Real Estate Market". www.timesproperty.com. Retrieved 22 August 2022.