The '''Chengdu–Kunming railway''' or '''Chengkun railway''' ({{zh|s=成昆铁路|t=成昆鐵路|p=chéngkūn tiělù}}), is a major trunkline [[railroad]] in [[southwest China|southwestern]] [[China]] between [[Chengdu]], the capital of [[Sichuan Province]] and [[Kunming]], the capital of [[Yunnan Province]]. The line is {{convert|1,134|km|0|abbr=on}} long and traverses rugged terrain from the [[Sichuan Basin]] to the [[Yunnan-Guizhou Plateau]].<ref name=autogenerated1/> The line was built between 1958 and 1970, with much of the work coming during the [[Third Front (China)|Third Front campaign]] to develop industry in China's interior. Major cities along route include Chengdu, [[Pengshan]], [[Jiajiang]], [[Emei]], [[Ebian]], [[Ganluo]], [[Xide]], [[Xichang]], [[Dechang]], [[Miyi]] and [[Panzhihua]] in [[Sichuan Province]] and [[Yuanmou]], [[Lufeng County|Lufeng]], [[Anning, Yunnan|Anning]] and Kunming in [[Yunnan Province]].
The '''Chengdu–Kunming railway''' or '''Chengkun railway''' ({{zh|s=成昆铁路|t=成昆鐵路|p=chéngkūn tiělù}}), is a major trunkline [[railroad]] in [[southwest China|southwestern]] [[China]] between [[Chengdu]], the capital of [[Sichuan Province]] and [[Kunming]], the capital of [[Yunnan Province]]. The line is {{convert|1,134|km|0|abbr=on}} long and traverses rugged terrain from the [[Sichuan Basin]] to the [[Yunnan-Guizhou Plateau]].<ref name=autogenerated1/> The line was built between 1958 and 1970, with much of the work coming during the [[Third Front (China)|Third Front campaign]] to develop industry in China's interior. Major cities along route include Chengdu, [[Pengshan]], [[Jiajiang]], [[Emei]], [[Ebian]], [[Ganluo]], [[Xide]], [[Xichang]], [[Dechang]], [[Miyi]] and [[Panzhihua]] in [[Sichuan Province]] and [[Yuanmou]], [[Lufeng County|Lufeng]], [[Anning, Yunnan|Anning]] and Kunming in [[Yunnan Province]].


Construction of a largely new double-track line started in 2010 and is expected to be completed in 2023.<ref name="completion date">{{Cite web|date=2 June 2020|title=成昆铁路复线米攀段开通运营全线仅剩峨米段在建,预计2023年开通|url=https://www.ls666.com/html/2020-06/02/content_13294.html|url-status=live|access-date=18 April 2021|website=凉山新闻网|language=zh|archive-url=https://web.archive.org/web/20200603064750/https://www.ls666.com/html/2020-06/02/content_13294.html |archive-date=2020-06-03 }}</ref> A northern section of the old line is now called the '''Emei–Panzhihua railway''' (shortened to '''E-Pan railway''') and a southern section is called the '''Yuanmou–Kunming railway''' (shortened to '''Yuankun railway''').
Construction of a largely new double-track line started in 2010 and was completed on 26 December 2022.<ref name="completion date"">{{cite news|title=成昆铁路带来发展新面貌|trans-title=The new Chengdu–Kunming Railway brings a new look to development|url=https://hs.china.com.cn/gd/64757.html|website=Weicai News Network|date=25 December 2022|accessdate=25 October 2023|archive-date=31 December 2022|archive-url=https://web.archive.org/web/20221231191116/https://hs.china.com.cn/gd/64757.html|url-status=live|language=zh}}</ref> A northern section of the old line was called the '''Emei–Panzhihua railway''', but since the completion of the new line has been called the '''Chengdu–Panzhihua''' (shortened to '''Chengpan''') section of the line and a southern section was called the '''Yuanmou–Kunming railway''', but is now called the '''Yuan-Kunming''' section of the line.


==History==
==History==
Line 113: Line 113:


==Double-track project ==
==Double-track project ==
In the 21st century, with local economic growth, the single-track Chengdu-Kunming Railway has become congested. In order to create more capacity, the line is being replaced by a double track-line with longer tunnels and viaducts, although the original track has generally been retained as one of the two tracks between Chengdu and [[Emeishan City|Emei]]. The Chengdu-Kunming railway double-track project is {{Convert|900|km}} long, with a design speed of {{Convert|160 to 200|km/h}} and a total investment of 55.2 billion yuan. Most of the new line runs near the old line, but on some sections of the route is significantly shortened and straightened. Therefore, the new line will be reduced by nearly {{Convert|200|km}} compared to the old {{Convert|1091|km|adj=on}} line. After completion, it will only take about 7 hours from Chengdu to Kunming.<ref>{{cite web | language = zh-cn | publisher = News.163.com | title = 成昆铁路复线年内开工 2014年建成 |trans-title=Construction of the Chengdu-Kunming railway double track will start within the year and will be completed in 2014| url = http://news.163.com/09/0315/06/54E5L80I000120GU.html | date = 15 March 2009 | accessdate = 20 September 2020 | archive-url = https://web.archive.org/web/20121018000627/http://news.163.com/09/0315/06/54E5L80I000120GU.html | archive-date = 18 October 2012 }}</ref>
In the 21st century, with local economic growth, the single-track Chengdu-Kunming Railway has become congested. In order to create more capacity, the line has been replaced by a double track-line with longer tunnels and viaducts, although the original track has generally been retained as one of the two tracks between Chengdu and [[Emeishan City|Emei]]. The Chengdu-Kunming railway double-track project is {{Convert|900|km}} long, with a design speed of {{Convert|160 to 200|km/h}} and a total investment of 55.2 billion yuan. Most of the new line runs near the old line, but on some sections of the route is significantly shortened and straightened. Therefore, the new line has been reduced by nearly {{Convert|200|km}} compared to the old {{Convert|1091|km|adj=on}} line. Since its completion, trains tale only about 7 hours from Chengdu to Kunming.<ref>{{cite web | language = zh-cn | publisher = News.163.com | title = 成昆铁路复线年内开工 2014年建成 |trans-title=Construction of the Chengdu-Kunming railway double track will start within the year and will be completed in 2014| url = http://news.163.com/09/0315/06/54E5L80I000120GU.html | date = 15 March 2009 | accessdate = 20 September 2020 | archive-url = https://web.archive.org/web/20121018000627/http://news.163.com/09/0315/06/54E5L80I000120GU.html | archive-date = 18 October 2012 }}</ref>


Work on the new line commenced in 2010. Double-tracking of the section between Hualongmen and Pengshan was completed in June 2017.<ref>{{Cite web|date=22 June 2017|title=成昆铁路复线花龙门至彭山段通车[组图]|trans-title=Chengkun Railway Complex Hualongmen to Pengshan Section Opens to Traffic|url=http://photo.china.com.cn/news/2017-06/22/content_41074663.htm|access-date=11 March 2021|website=图片中国|language=zh}}</ref> The final {{Convert|384|km|adj=on}}-long section between Emei and Miyi is due to be completed in 2023.<ref name="completion date"/>
Work on the new line commenced in 2010. Double-tracking of the section between Hualongmen and Pengshan was completed in June 2017.<ref>{{Cite web|date=22 June 2017|title=成昆铁路复线花龙门至彭山段通车[组图]|trans-title=Chengkun Railway Complex Hualongmen to Pengshan Section Opens to Traffic|url=http://photo.china.com.cn/news/2017-06/22/content_41074663.htm|access-date=11 March 2021|website=图片中国|language=zh}}</ref> The final {{Convert|384|km|adj=on}}-long section between Emei and Miyi was completed on 26 December 2022.<ref name="completion date"/>


A northern section of the old line is now called the Emei–Panzhihua railway (shortened to ''E-Pan railway'') and a southern section is called the Yuanmou–Kunming railway (shortened to ''Yuankun railway''). The section of the old line between Huapengzi (south of Panzhihua) and Huangguayuan (north of Yuanmou) has been closed and flooded by the [[Wudongde Dam]].
A northern section of the old line was called the Emei–Panzhihua railway (shortened to ''E-Pan railway''), but changed on completion of the full line to the ''Chengdu–Panzhihua'' (shortened to ''Chengpan'') branch of the Chengdu–Kunming railway. A southern section was called the Yuanmou–Kunming railway (shortened to ''Yuankun railway''), but is now called the ''Yuan-Kunming'' section of the line. The section of the old line between Huapengzi (south of Panzhihua) and Huangguayuan (north of Yuanmou) has been closed and flooded by the [[Wudongde Dam]].


The new line will mainly handle freight. It is proposed that high-speed passenger services between Chengdu and Kunming will be provided by the [[Chengdu–Chongqing intercity railway]] (completed in 2015) from Chengdu to Neijiang North, the [[Southern Sichuan intercity railway]] (due to open in 2023) from Neijiang North to a new station in [[Yibin]], and the [[Chongqing–Kunming high-speed railway]] (approved by the [[National Development and Reform Commission]] in 2019) from Yibin to Kunming.
The new line will mainly handle freight. It is proposed that high-speed passenger services between Chengdu and Kunming will be provided by the [[Chengdu–Chongqing intercity railway]] (completed in 2015) from Chengdu to Neijiang North, the [[Southern Sichuan intercity railway]] (due to open in 2023) from Neijiang North to a new station in [[Yibin]], and the [[Chongqing–Kunming high-speed railway]] (approved by the [[National Development and Reform Commission]] in 2019) from Yibin to Kunming.

Revision as of 12:38, 25 October 2023

Chengdu–Kunming railway
Guancunba Station, on the old line next to the Dadu River (downstream of the Niuri River Valley), in Jinkouhe District, Leshan.
Overview
Other name(s)Chengkun railway
Native name成昆铁路
Status
  • Partially operational
  • Under construction (Yangang–Miyi East)
OwnerChina Railway
LocaleSouthwest China
Termini
Service
TypeHeavy rail
Operator(s)
History
Opened1 January 1971 (1971-01-01)
Completed1 July 1970 (1970-07-01)
Technical
Line length1,100 km (680 mi)
Number of tracks1–2
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification25 kV 50 Hz AC overhead line
New double-track line

km
0
Chengdu
4
Bali
15
Chengdu East
Chengdu South
Left arrow Chengdu west loop
32
Shuangliu
42
Gongxing
Right arrow to Chengdu North marshalling yard
Hualongmen
54
Puxing
Huilong'an
Min
66
Qinglongchang
77
Pengshan
85
Taihe
92
MeishanMeishan East
102
Xiantan
110
Simeng
MeishanLeshan
119
Wuchang
129
Macun
original Chengdu–Kunming line
137
Leshan North
original Chengdu–Kunming line
destroyed in the 1970s
Qingyi
original replacement track
145
Shuangfu
156
Emei
Left arrow
Chengdu–Guiyang HSR
(Emeishan branch)
Right arrow
160
Yangang
Left arrow
Chengdu–Panzhihua section
(part of the original line)
Shawan South
Fandianzi
Ebian South
Jinkouhe South
Teke
Ganluo South
Mantan
Yuexi South
Anluo
Xide West
Right arrow Emei–Panzhihua railway
Mianning
Right arrow Emei–Panzhihua railway
Yuehua West
Xichang West
Youjun
Right arrow Huangshuitang link
Huangshuitang South
Dechang West
Yonglang West
Left arrow Miyi East link
Miyi East
Left arrow Miyi East link
Binggu East
Yanbian
old line
Chengdu–Lijiang expressway
Right arrow Panzhihua–old line link
Puda
Panzhihua South
Xianfeng ying
Yongren
Xinkang
Right arrow
Yuanmou-Kunming section from
Huangguayuan (part of the original line)
Yuanmou West
LowerRight arrow Yuanmou–Kunming railway
Dashucun
Longchuan
Dianwei
Yuanmou–Kunming railway
Guangtong North
Lufeng South
Shuangmeicun
1068
Wenquan
Left arrow Xinyamei Guwuliu freght yard line
Left arrow Kunming–Zhongyicun railway
Left arrow Anning line
1077
Dushupu
1086
Bijiguan
1091
Kunming West
1100
Kunming
km
Fala Spiral of Chengdu–Kunming railway
A memorial for workers who lost their lives in the construction of the railway in Jianshui County.

The Chengdu–Kunming railway or Chengkun railway (simplified Chinese: 成昆铁路; traditional Chinese: 成昆鐵路; pinyin: chéngkūn tiělù), is a major trunkline railroad in southwestern China between Chengdu, the capital of Sichuan Province and Kunming, the capital of Yunnan Province. The line is 1,134 km (705 mi) long and traverses rugged terrain from the Sichuan Basin to the Yunnan-Guizhou Plateau.[1] The line was built between 1958 and 1970, with much of the work coming during the Third Front campaign to develop industry in China's interior. Major cities along route include Chengdu, Pengshan, Jiajiang, Emei, Ebian, Ganluo, Xide, Xichang, Dechang, Miyi and Panzhihua in Sichuan Province and Yuanmou, Lufeng, Anning and Kunming in Yunnan Province.

Construction of a largely new double-track line started in 2010 and was completed on 26 December 2022.[2] A northern section of the old line was called the Emei–Panzhihua railway, but since the completion of the new line has been called the Chengdu–Panzhihua (shortened to Chengpan) section of the line and a southern section was called the Yuanmou–Kunming railway, but is now called the Yuan-Kunming section of the line.

History

The construction of the Luosuoguan Anning River Bridge on the Emei–Miyi double-track section in northern Dechang County, Sichuan, in August 2019.

Planning of the Chengdu–Kunming railway began in 1952 with several routes under consideration.[1] An eastern route would have run via Neijiang, Zigong, Yibin, Shuifu, Yanjin. Yiliang, Malong and Songming. A central route would have taken a similar route as far as Yibin and continued via Pingshan, Suijiang, Yongshan, Daguan, Qiaojia, Huize, Dongchuan and Songming. A western route would run via Meishan, Leshan, Ebian Yi, Ganluo, Xide, Xichang, Dechang, Huili and Guangtong. Soviet advisers recommended the central route as they considered the western route to be too difficult to build, because of its geography and geology, and that it could not be maintained because it would be prone to flooding, mudslides and earthquakes. Nevertheless, a committee headed by Zhou Enlai preferred the western route and this was eventually confirmed. It was considered to give access to important mineral deposits, passed through areas inhabited by ethnic minorities and had advantages for national defence.

The eastern route was later used for much of the Neijiang–Kunming railway, which was completed in 2001. The central route has similarities to the route of the proposed high-speed line between Chengdu and Kunming.

Construction began in 1958 during the Great Leap Forward and expanded to full-scale in 1964. Much of the construction occurred as a focus of the Third Front campaign to develop basic industry and national defense industry in China's interior;[3]: 134  this campaign was accelerated when fears of possible American invasion increased after the Gulf of Tonkin incident.[3]: 7  The only rail connection to Kunming at that time ran through North Vietnam. In July 1970, the line was completed and entered into operation in January 1971.[1] Because it was built as part of the secretive Third Front campaign pursuant to the view that it had to be kept hidden from China's geopolitical rivals, completion of the railway was not announced or promoted.[3]: 134 

The government published a pictorial in 1976 showing pictures of the construction and extreme terrain that required hundreds of tunnels and bridges.[4] Building conditions were hazardous and 2,100 workers perished during the construction of the original line.[5]

On August 30, 2000, the entire line was electrified.[1]

Aside from Chengdu and Kunming, the line has a total of 122 stations,[1][6] although many of these are now closed for passengers and some for freight operations. Four stations on either side of the Jinsha River (Yangtze) crossing were inundated by the Wudongde Dam in 2020.

Cultural significance

Academic Covell F. Meyskens writes that the Chengdu-Kunming railway serves as a symbol of the Communist Party's technical ability to remake the Chinese landscape in accord with its own vision, comparing its function in this regard to the Ten Great Buildings.[3]: 134 

Sculpture

Ivory carving of the Chengdu-Kunming railway presented as a gift to the United Nations on display at UN Headquarters in New York.

In 1974, an ivory sculpture commemorating the completion of the Chengdu–Kunming railway was presented as a gift to the United Nations and is displayed at the U.N. Headquarters in New York.[7] The sculpture depicts the rail bridge across the Dadu River between two mountain peaks, with intricate details of passengers inside the train.[8] The sculpture, 150 cm (59 in) in length and 110 cm (43 in) in height, was made from eight elephant tusks and weighs over 300 kilograms (660 lb).[7]

Railway junctions

The Chengkun railway is a major trunkline in China's railway network and connects with numerous other railway lines including:[6]

Sichuan Province

Yunnan Province

Natural Disaster Vulnerability

Four sections of the railroad which pass through the Niuri River Valley, Manshuiwan to Xichang of the Anning River Valley, Jinsha River Valley and Longchuan River Valley are under the exposure of the vulnerable debris flow and landslide. Soviet experts used to make a prediction that the railroad "will be turned into a pile of scrap iron by violent nature even after it is completed" in the route design stage;[9] An Imagery Analysis Service Note published by CIA in October 1971 made a statement that "[the railroad] will undoubtedly require more than the normal maintenance because of the rugged terrain it passes through" based on the detection of at least two replacement works of the destroyed tracks caused by landslides in the first year of its operation.[10]

Upon operation, major natural disasters did not occur in the Anning River Valley and Longchuan River Valley section due to the considered route selection and adequate protection strategies adopted. However, the section through the Niuri River Valley that had a faster river flow—due to its short, steep channel and unstable valley side slope—was not given sufficient consideration during the construction period. Multiple incidents of debris flow have occurred in the Niuri River Valley section especially between Niri and Suxiong and between Lianghong and Aidai.[11]

Double-track project

In the 21st century, with local economic growth, the single-track Chengdu-Kunming Railway has become congested. In order to create more capacity, the line has been replaced by a double track-line with longer tunnels and viaducts, although the original track has generally been retained as one of the two tracks between Chengdu and Emei. The Chengdu-Kunming railway double-track project is 900 kilometres (560 mi) long, with a design speed of 160 to 200 kilometres per hour (99 to 124 mph) and a total investment of 55.2 billion yuan. Most of the new line runs near the old line, but on some sections of the route is significantly shortened and straightened. Therefore, the new line has been reduced by nearly 200 kilometres (120 mi) compared to the old 1,091-kilometre (678 mi) line. Since its completion, trains tale only about 7 hours from Chengdu to Kunming.[12]

Work on the new line commenced in 2010. Double-tracking of the section between Hualongmen and Pengshan was completed in June 2017.[13] The final 384-kilometre (239 mi)-long section between Emei and Miyi was completed on 26 December 2022.[2]

A northern section of the old line was called the Emei–Panzhihua railway (shortened to E-Pan railway), but changed on completion of the full line to the Chengdu–Panzhihua (shortened to Chengpan) branch of the Chengdu–Kunming railway. A southern section was called the Yuanmou–Kunming railway (shortened to Yuankun railway), but is now called the Yuan-Kunming section of the line. The section of the old line between Huapengzi (south of Panzhihua) and Huangguayuan (north of Yuanmou) has been closed and flooded by the Wudongde Dam.

The new line will mainly handle freight. It is proposed that high-speed passenger services between Chengdu and Kunming will be provided by the Chengdu–Chongqing intercity railway (completed in 2015) from Chengdu to Neijiang North, the Southern Sichuan intercity railway (due to open in 2023) from Neijiang North to a new station in Yibin, and the Chongqing–Kunming high-speed railway (approved by the National Development and Reform Commission in 2019) from Yibin to Kunming.

See also

References

  1. ^ a b c d e 《中国铁路线》 P25-26 Last Accessed 2011-07-31
  2. ^ a b "新成昆铁路带来发展新面貌" [The new Chengdu–Kunming Railway brings a new look to development]. Weicai News Network (in Chinese). 25 December 2022. Archived from the original on 31 December 2022. Retrieved 25 October 2023.
  3. ^ a b c d Meyskens, Covell F. (2020). Mao's Third Front: The Militarization of Cold War China. Cambridge, United Kingdom: Cambridge University Press. doi:10.1017/9781108784788. ISBN 978-1-108-78478-8. OCLC 1145096137. S2CID 218936313.
  4. ^ "Mountains and Rivers Make Way: The Chengtu-Kunming Railroad in Photographs," published by the Foreign Languages Press (Peking: 1976).
  5. ^ (Chinese) "成昆铁路:生命铺就的英雄史诗" Archived May 23, 2011, at the Wayback Machine Last Accessed 2011-07-31
  6. ^ a b Quail Map Company (2008). China railway Atlas (third ed.). Quail Map Company. ISBN 978-1-898319-82-5.
  7. ^ a b "Chinese Ivory Carving" UN.org Archived August 24, 2011, at the Wayback Machine Last Accessed 2011-07-31
  8. ^ "China Presents Ivory Carving to United Nations" Last Accessed 2011-07-31
  9. ^ "成昆铁路40年 与灾害正面交锋的40年". 云南网 昆明铁道报 (in Chinese). 新浪网. 2010-07-13.
  10. ^ "Construction of Cheng-tu/Kun-ming Rail Line was a Major Engineering Accomplishment" (PDF). Imagery Analysis Service Note. CIA. 1971-10-08. p. 2 – via Freedom of Information Act Electronic Reading Room. .
  11. ^ 严壁玉; 王茂靖 (2005). "穿越"地质博物馆"的成昆铁路". 铁道工程学报 (in Chinese). doi:10.3969/j.issn.1006-2106.2005.z1.027.
  12. ^ "成昆铁路复线年内开工 2014年建成" [Construction of the Chengdu-Kunming railway double track will start within the year and will be completed in 2014] (in Chinese (China)). News.163.com. 15 March 2009. Archived from the original on 18 October 2012. Retrieved 20 September 2020.
  13. ^ "成昆铁路复线花龙门至彭山段通车[组图]" [Chengkun Railway Complex Hualongmen to Pengshan Section Opens to Traffic]. 图片中国 (in Chinese). 22 June 2017. Retrieved 11 March 2021.