Transjakarta Corridor 3: Difference between revisions
No edit summary |
|||
Line 64: | Line 64: | ||
== List of BRT stations == |
== List of BRT stations == |
||
* As the impact of the construction of the Jakarta MRT phase 2A project, the terminus is temporarily moved from [[Pasar Baru]] to [[Monumen Nasional (Transjakarta)|Monumen Nasional]] from May 29, 2023 until the MRT construction completed in 2027 or 2029.<ref name=":3" /> |
* As the impact of the construction of the Jakarta MRT phase 2A project, the terminus is temporarily moved from [[Pasar Baru]] to [[Monumen Nasional (Transjakarta)|Monumen Nasional]] from May 29, 2023 until the MRT construction completed in 2027 or 2029.<ref name=":3" /> As the result, Corridor 3 currently does not serve Pecenongan, Juanda, and Pasar Baru stations, which are now instead served by temporarily-extended Corridor 8. |
||
* Currently, all stations are served by buses 24 hours a day.<ref>{{Cite web |last=Wibawana |first=Widhia Arum |date=2023-12-28 |title=Info Layanan Bus Amari TransJakarta: Daftar Koridor, Rute, Jadwal |url=https://news.detik.com/berita/d-7113315/info-layanan-bus-amari-transjakarta-daftar-koridor-rute-jadwal |access-date=2024-01-01 |website=[[Detik.com|detiknews]] |language=id-ID}}</ref> |
* Currently, all stations are served by buses 24 hours a day.<ref>{{Cite web |last=Wibawana |first=Widhia Arum |date=2023-12-28 |title=Info Layanan Bus Amari TransJakarta: Daftar Koridor, Rute, Jadwal |url=https://news.detik.com/berita/d-7113315/info-layanan-bus-amari-transjakarta-daftar-koridor-rute-jadwal |access-date=2024-01-01 |website=[[Detik.com|detiknews]] |language=id-ID}}</ref> |
||
* Italic text indicates that the BRT station is temporarily closed for revitalization or the bus does not stop at the station.<ref name=":4">{{Cite web |last=@pt_transjakarta |author-link=TransJakarta |date=2023-11-05 |title=Sahabat TiJe, Halte Indosiar mulai direvitalisasi pada Senin, 6 November 2023 pukul 00:00 WIB. Selama proses konstruksi Halte Indosiar, kamu bisa menggunakan halte yang letaknya sebelum atau sesudah halte yang direvitalisasi, seperti Halte Jelambar. |url=https://www.instagram.com/p/CzPhU1UyRiC/ |access-date=2023-11-08 |website=[[Instagram]]}}</ref> |
* Italic text indicates that the BRT station is temporarily closed for revitalization or the bus does not stop at the station.<ref name=":4">{{Cite web |last=@pt_transjakarta |author-link=TransJakarta |date=2023-11-05 |title=Sahabat TiJe, Halte Indosiar mulai direvitalisasi pada Senin, 6 November 2023 pukul 00:00 WIB. Selama proses konstruksi Halte Indosiar, kamu bisa menggunakan halte yang letaknya sebelum atau sesudah halte yang direvitalisasi, seperti Halte Jelambar. |url=https://www.instagram.com/p/CzPhU1UyRiC/ |access-date=2023-11-08 |website=[[Instagram]]}}</ref> |
Revision as of 11:29, 15 June 2024
Transjakarta Corridor 3 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Kalideres – Monumen Nasional | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Overview | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
System | Transjakarta | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Operator |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Began service | January 15, 2006 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Route type | Street-level Bus Rapid Transit | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Locale | Central Jakarta West Jakarta | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Length | 16.14 km | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Stations | 14 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
The Transjakarta Corridor 3 is a bus rapid transit route in Jakarta, Indonesia, operated by Transjakarta. It serves from the Kalideres Bus Terminal to the Monumen Nasional BRT station. The streets that are passed by Corridor 3 are: Daan Mogot, Kyai Tapa, Hasyim Ashari, Cideng Barat/Timur Street, Veteran/Majapahit, and Medan Merdeka Barat. Corridor 3 is integrated with KAI Commuter Tangerang Line at Taman Kota Station and Pesing Station.
Until March 3, 2023, Corridor 3 serves the route from Kalideres to Pasar Baru. As the impact of Jakarta MRT phase 2A construction, Corridor 3 temporarily moved the terminus to Monumen Nasional as of May 29, 2023, ceasing service of Pecenongan, Juanda, and Pasar Baru stations, which are now served by temporarily-extended Corridor 8.[1]
History
Early operational
Along with Corridor 2, Corridor 3 was inaugurated on January 15, 2006 which received high enthusiasm from the people.[2][3][4] It was targeted that there would be 71 new bus fleets serving Corridor 3 and 2 on April 2006, or three months after the first day of operational.[5] Corridor 3 was originally serving the route from Kalideres to Pasar Baru until it was temporarily readjusted in 2023.
24-hour service
Corridors 1, 3, and 9 were the first Transjakarta corridors to began 24-hour services starting on June 1, 2014.[6][7] At the time, the bus only stops at certain stations. Sometime later, all stations are served by buses 24 hours a day, so the bus currently stops at all stations.
Bus station revitalization
On December 16, 2020, to improve service quality, one of the BRT stations on Corridor 3, namely the Pasar Baru station (as the terminus of Corridor 3 until it was temporarily moved to Monas, now Monumen Nasional) was temporarily closed for revitalization. The revitalization of the Pasar Baru station was completed one month later on January 16, 2021.[8] The Pasar Baru bus station renovation marked the start of the revitalization of 46 Transjakarta bus shelters in 2022.[9]
As the follow-up of the revitalized Pasar Baru bus station, the Jembatan Gantung bus station was also temporarily closed for revitalization since September 5, 2022[10] and the Kalideres bus station on the next day (September 6, 2022).[11] The revitalized Jembatan Gantung bus station was reopened on April 6, 2023,[12] followed by Kalideres on July 23, 2023.[13]
Later on June 1, 2023, Jembatan Baru bus station was also closed for revitalization and Grogol 1 (now Grogol, and alongside skybridge-connected Grogol 2, now Grogol Reformasi) two days later.[14] Jembatan Baru station was reopened on October 21, 2023.[15] Grogol station was reopened to the public on November 4, 2023.
Temporary readjustment
Starting on March 4, 2023, as the impact of the Jakarta MRT Phase 2A construction, the Harmoni bus station which serves Corridor 1, 2, 3, and 8, was temporarily moved its operational into a temporary building with limited capacity that only serves Corridor 1 passengers. To prevent overcapacity of the Pasar Baru station due to high density of Corridor 3 and 8 passengers, Transjakarta decided to temporarily move the terminus of Corridor 3 to the Bundaran HI bus station, thus no longer serving Pecenongan, Juanda, and Pasar Baru stations, which in turn are now served by temporarily-extended Corridor 8.[16][17][18] However on May 29, 2023, the line was cut short to terminate at Monumen Nasional to reduce headways.[1] Transjakarta also operates Route 3H (Stasiun Pesing–Kota) to serve Corridor 3 passengers who wanted to go to Kota station which usually transit to Corridor 1 at Harmoni Central before the readjustment.[19] This temporary readjustment is effective until the MRT construction completed in 2027 or 2029.
List of BRT stations
- As the impact of the construction of the Jakarta MRT phase 2A project, the terminus is temporarily moved from Pasar Baru to Monumen Nasional from May 29, 2023 until the MRT construction completed in 2027 or 2029.[1] As the result, Corridor 3 currently does not serve Pecenongan, Juanda, and Pasar Baru stations, which are now instead served by temporarily-extended Corridor 8.
- Currently, all stations are served by buses 24 hours a day.[20]
- Italic text indicates that the BRT station is temporarily closed for revitalization or the bus does not stop at the station.[21]
Corridor 3 (Kalideres – Monumen Nasional) | |||
---|---|---|---|
Code | Station name | Transfer/Notes | Bus terminal or train station nearby |
301 | Kalideres | Kalideres | Kalideres Bus Terminal |
302 | Pesakih | Pesakih | |
303 | Sumur Bor | Sumur Bor | |
304 | Rawa Buaya | Rawa Buaya | |
305 | Jembatan Baru | Jembatan Baru | |
306 | Pulo Nangka | Pulo Nangka | |
307 | Jembatan Gantung | Jembatan Gantung | |
308 | Taman Kota | Taman Kota | Taman Kota |
309
817 |
Damai[21] | Damai | Pesing |
310
818 |
Jelambar | Jelambar | |
311 | Grogol | Grogol | Grogol (Planned) |
312 | Roxy | Roxy | |
823 | Petojo | Petojo | |
114
221 |
Monumen Nasional | Monumen Nasional | Monas (U/C) |
Cross-corridor routes
Route 3F (Kalideres – Gelora Bung Karno)
- Italic text indicates that the BRT station is temporarily closed for renovation or the bus does not stop at the station.[21]
- Stations indicated by a → sign has a one way service towards Gelora Bung Karno only.
Route 3F (Kalideres – Gelora Bung Karno) | |||
---|---|---|---|
Code | Station name | Transfer/Notes | Bus terminal or train station nearby |
301 | Kalideres | Kalideres | Kalideres Bus Terminal |
302 | Pesakih | Pesakih | |
303 | Sumur Bor | Sumur Bor | |
304 | Rawa Buaya | Rawa Buaya | |
305 | Jembatan Baru | Jembatan Baru | |
306 | Pulo Nangka | Pulo Nangka | |
307 | Jembatan Gantung | Jembatan Gantung | |
308 | Taman Kota | Taman Kota | Taman Kota |
309
817 |
Damai[22] | Damai | Pesing |
310
818 |
Jelambar | Jelambar | |
819
920 |
Grogol Reformasi → | Grogol Reformasi | |
Towards Kalideres (←) heads straight to Jelambar | |||
820
919 |
Tanjung Duren | Tanjung Duren | Taman Anggrek (planned) |
918 | Kota Bambu | Kota Bambu | |
917 | Kemanggisan | Kemanggisan | |
916 | Petamburan | Petamburan | |
915 | Senayan | Senayan | |
105 | Gelora Bung Karno | Gelora Bung Karno |
Route 3H (Stasiun Pesing – Kota)
- Stasiun Pesing is a bus stop dedicated to serve as a terminus for 3H and is not a BRT station.
- Stations indicated by a → sign has a one way service towards Kota only.
Route 3H (Stasiun Pesing – Kota) | |||
---|---|---|---|
Code | Station name | Transfer/Notes | Bus terminal or train station nearby |
Stasiun Pesing | Bus stop (not a BRT station) | Pesing | |
310
818 |
Jelambar | Jelambar | Pesing |
311 | Grogol | Grogol | Grogol (Planned) |
312 | Roxy | Roxy | |
823 | Petojo | Petojo | Petojo (planned) |
115
220 |
Harmoni | Harmoni | Harmoni (U/C) |
116 | Sawah Besar | Sawah Besar | Sawah Besar (U/C) |
117 | Mangga Besar | Mangga Besar | Mangga Besar (U/C) |
118 | Taman Sari | Taman Sari | |
119 | Glodok | Glodok | Glodok (U/C) |
121
1222 |
Kali Besar → | Kali Besar | |
122
1205 |
Museum Sejarah Jakarta → | Museum Sejarah Jakarta | |
Towards Stasiun Pesing (←) heads straight to Glodok | |||
120
1206 |
Kota | Kota | Jakarta Kota |
Fleets
- Scania K320IA CNG Euro VI, white-light blue (MB)
- Scania K310IB 6x2, white-blue (MYS)
- Mercedes-Benz OH 1626 NG A/T, white-blue (MYS)
- Hino RK1 JSNL, white-blue (TJ)
- Hino RK8 R260, blue (BMP, night bus (22:00 - 05:00))
- Hino RK8 R260, blue (DMR)
- Zhongtong LCK6180GC Euro 5, white-dark blue (DMR)
- Volvo B11R 6×2 A/T, white-blue (SAF)
Depots
- Transjakarta (TJ)
- Rawa Buaya
- Cawang (night bus)
- Mayasari Bakti (MB/MYS)
- Klender
- Perum DAMRI (DMR)
- Pulogadung
- Ciputat
- Klender
- Tangerang
- Steady Safe (SAF)
- Pegangsaan Dua
See also
References
- ^ a b c @buswayfansclub (May 28, 2023). "Saatnya update kembali info rute Transjakarta. 29 Mei: Koridor 3 mengalami perpendekan rute yang semula "KALIDERES - BUNDARAN HI" menjadi "KALIDERES - MONAS", termasuk saat ada kegiatan CFD di Petojo. #BuswayFansClub #BFCLuarBiasa #AyoNaikTransjakarta #Transjakarta". Instagram. Retrieved June 4, 2023.
- ^ "Busway Koridor II dan III Diresmikan". detikcom. January 15, 2006. Retrieved March 24, 2023.[permanent dead link ]
- ^ "Busway Koridor II & III Diresmikan, Warga Jakarta Antusias". detikcom. January 15, 2006. Retrieved March 24, 2023.[permanent dead link ]
- ^ "Dua Jalur Busway Diresmikan". Tempo.co (in Indonesian). January 15, 2006. Retrieved March 24, 2023.
- ^ RH, Priyambodo, ed. (January 15, 2006). "71 Bus Jakarta Koridor II dan III Beroperasi April 2006". ANTARA News. Retrieved March 24, 2023.
- ^ "Pengoperasian Bus Malam Hari 24 Jam". June 2, 2014.[permanent dead link ]
- ^ Elyda, Corry (June 2, 2014). "Jakartans welcome 24-hour Transjakarta services". The Jakarta Post. Retrieved March 30, 2023.
- ^ Hantoro, Juli (January 17, 2021). "Halte Transjakarta Pasar Baru Rampung Direnovasi". Tempo (in Indonesian). Retrieved March 24, 2023.
- ^ Dyantoro, Sunu (June 16, 2022). "Transjakarta Revitalisasi 46 Halte, Shuttle Bus Jadi Solusi Kepadatan Penumpang". Tempo (in Indonesian). Retrieved March 24, 2023.
- ^ Huda, Larissa (September 1, 2022). "Halte Transjakarta Manggarai, PGC1, Jembatan Gantung, dan Kebayoran Lama Ditutup Sementara, Simak Alternatifnya". KOMPAS.com (in Indonesian). Retrieved March 24, 2023.
- ^ "Mulai 6 September, 5 Halte Transjakarta Ini Ditutup Sementara". SINDOnews.com (in Indonesian). Retrieved March 24, 2023.
- ^ @pt_transjakarta (April 6, 2023). "Masih ingetkan dengan JPO Jembatan Gantung Daan Mogot yang rusak karena ditabrak. Nah JPO dan Halte Jembatan Gantung kini sudah selesai direvitalisasi dan mulai beroperasi per hari ini loh! Yuk absen di kolom komentar siapa yang sudah naik Transjakarta dari halte Jembatan Gantung! Bagikan juga kisah menarik kalian di halte Jembatan Gantung. #semangaTJakarta #AyoNaikTransjakarta". Instagram. Retrieved April 6, 2023.
- ^ @pt_transjakarta (July 22, 2023). "Hari minggu ke rumah Ali. Eh, Halte Kalideres sudah mulai beroperasi kembali di hari Minggu 23 Juli! Halte ini melayani rute: 3 Kalideres - Monas via Veteran, 3F Kalideres Gelora Bung Karno, dan M3 Kalideres - Monas via Veteran (AMARI)". Instagram. Retrieved July 22, 2023.
- ^ Wibawana, Widhia Arum (May 17, 2023). "Jadwal 10 Halte TransJakarta yang Ditutup Selama Revitalisasi". detiknews (in Indonesian). Retrieved May 31, 2023.
- ^ @pt_transjakarta (October 21, 2023). "Sahabat TiJe, akhir pekan ini Halte Jembatan Baru kembali melayani pelanggan loh! Yup mulai Sabtu, 21 Oktober 2023. Halte ini melayani rute-rute antara lain: 3: Kalideres - Monas, 2A: Pulo Gadung 1 - Rawa Buaya, 3E: Puri Kembangan - Sentraland Cengkareng, dan 3F: Kalideres - Gelora Bung Karno, dan M3: Kalideres - Monas (AMARI). Jaga fasilitasnya bersama dan ayo naik Transjakarta!". Instagram. Retrieved October 21, 2023.
- ^ Sari, Brigitta Belia Permata (March 3, 2023). "Mulai Besok, Ini Penyesuaian Rute TransJ Imbas Relokasi Halte Harmoni". detiknews (in Indonesian). Retrieved March 24, 2023.
- ^ Dewi, Clara Maria Tjandra (March 3, 2023). "Halte Harmoni Ditutup, Transjakarta Lakukan Penyesuaian 12 Rute Mulai Besok". Tempo (in Indonesian). Retrieved March 24, 2023.
- ^ @pt_transjakarta (March 3, 2023). "Sahabat TiJe, Transjakarta mengucapkan terima kasih atas pengertian para pelanggan akan penyesuaian rute dari konstruksi MRT Jakarta Fase 2A CP 202. Dan mohon maaf atas ketidaknyamanan ini". Instagram. Retrieved March 24, 2023.
- ^ Oktaviani, Tari (March 15, 2023). "Rute Transjakarta 3H Jelambar-Kota". KOMPAS.com (in Indonesian). Retrieved March 24, 2023.
- ^ Wibawana, Widhia Arum (December 28, 2023). "Info Layanan Bus Amari TransJakarta: Daftar Koridor, Rute, Jadwal". detiknews (in Indonesian). Retrieved January 1, 2024.
- ^ a b c @pt_transjakarta (November 5, 2023). "Sahabat TiJe, Halte Indosiar mulai direvitalisasi pada Senin, 6 November 2023 pukul 00:00 WIB. Selama proses konstruksi Halte Indosiar, kamu bisa menggunakan halte yang letaknya sebelum atau sesudah halte yang direvitalisasi, seperti Halte Jelambar". Instagram. Retrieved November 8, 2023.
- ^ @pt_transjakarta (November 5, 2023). "Sahabat TiJe, Halte Indosiar mulai direvitalisasi pada Senin, 6 November 2023 pukul 00:00 WIB. Selama proses konstruksi Halte Indosiar, kamu bisa menggunakan halte yang letaknya sebelum atau sesudah halte yang direvitalisasi, seperti Halte Jelambar". Instagram. Retrieved November 8, 2023.