Madan Ashrit Highway: Difference between revisions
Appearance
Content deleted Content added
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
{{Infobox road |
{{Infobox road |
||
| country = NPL |
| country = NPL |
||
| name = Mada Ashrit Highway |
|||
⚫ | |||
| alternate_name = National Highway 44 |
|||
⚫ | |||
⚫ | |||
⚫ | |||
| length_km = 33.2 |
| length_km = 33.2 |
||
| terminus_a = Narayanghat |
| terminus_a = Narayanghat |
||
Line 10: | Line 12: | ||
| map_custom=yes |
| map_custom=yes |
||
| map_notes=Madan Ashrit Highway in red |
| map_notes=Madan Ashrit Highway in red |
||
| junction = {{Jct|country=NPL| |
| junction = {{Jct|country=NPL|NH|01}} [[Mahendra Highway]] at Narayanghat <br /> |
||
{{Jct|country=NPL| |
{{Jct|country=NPL|NH|17}} [[Prithvi Highway]] at Mugling |
||
| next_type = NH |
|||
| alternate_name = Narayanghat - Mugling Highway |
|||
| |
| next_route = 45 |
||
| |
| previous_type = NH |
||
⚫ | |||
| next_dab = H06 (Nepal) |
|||
| previous_type = H |
|||
⚫ | |||
| previous_dab = H04 (Nepal) |
|||
}} |
}} |
||
'''Madan Ashrit Highway''' or '''NH44''' (previously: '''H05''')s one of Nepal's busiest international roadway link, carrying 90% of all international traffic, or about 20,000 vehicles daily. The 36 km road connects [[Narayangadh|Naryangadh]] and Mugling. A 33.2 km section was being widened from 5 meters to 9–11 meters, and was finished in June 2018.<ref>{{cite web | url=http://kathmandupost.ekantipur.com/news/2018-03-23/muglin-road-project-gets-three-month-extension.html | title=Muglin road project gets three-month extension }}</ref> |
'''Madan Ashrit Highway''' or '''NH44''' (previously: '''H05''')s one of Nepal's busiest international roadway link, carrying 90% of all international traffic, or about 20,000 vehicles daily. The 36 km road connects [[Narayangadh|Naryangadh]] and Mugling. A 33.2 km section was being widened from 5 meters to 9–11 meters, and was finished in June 2018.<ref>{{cite web | url=http://kathmandupost.ekantipur.com/news/2018-03-23/muglin-road-project-gets-three-month-extension.html | title=Muglin road project gets three-month extension }}</ref> |
Revision as of 07:00, 3 July 2024
Mada Ashrit Highway | ||||
---|---|---|---|---|
राष्ट्रिय राजमार्ग ४४ | ||||
National Highway 44 | ||||
Route information | ||||
Maintained by MoPIT (Department of Roads) | ||||
Length | 33.2 km (20.6 mi) | |||
Major junctions | ||||
From | Narayanghat | |||
NH01 Mahendra Highway at Narayanghat NH17 Prithvi Highway at Mugling | ||||
To | Mugling | |||
Location | ||||
Country | Nepal | |||
Highway system | ||||
|
Madan Ashrit Highway or NH44 (previously: H05)s one of Nepal's busiest international roadway link, carrying 90% of all international traffic, or about 20,000 vehicles daily. The 36 km road connects Naryangadh and Mugling. A 33.2 km section was being widened from 5 meters to 9–11 meters, and was finished in June 2018.[1] It connects to Prithvi Highway at Mugling and Mahendra Highway at Naryanghat.
References