User:Cloudsarepretty: Difference between revisions
Appearance
Content deleted Content added
No edit summary |
|||
Line 23: | Line 23: | ||
[[User:Cloudsarepretty/Connect card (transit card)|/Connect Card]], A Transit Card in the Sacramento metro area. |
[[User:Cloudsarepretty/Connect card (transit card)|/Connect Card]], A Transit Card in the Sacramento metro area. |
||
[[Altamont Corridor Express]] (Valley Rail) - Since the Valley Rail project has been integrated into the San Joaquin Regional Rail Comission as a joint project, rather than a separate, standalone project |
[[Altamont Corridor Express]] (Valley Rail) - Since the Valley Rail project has been integrated into the San Joaquin Regional Rail Comission as a joint project, rather than a separate, standalone project, all conceptual stations must be upated to reflect this information. See table below for updated information. (''see [https://www.sjrrc.com/valley-rail/ this website] for more information'') '''If you wish to assist in updating information, visit the table at [[/Valley Rail]] to be updated. Do NOT update the table on my profile. I will do this.''' |
||
{| class="wikitable" |
{| class="wikitable" |
||
|+ |
|+ |
Revision as of 00:09, 9 August 2024
Committed identity: 2441e10dc1c14be28a910b2bce78558ae1b38ed7c86f23fb159e80a2087b7342bd6d525d0d5306c5374183b5b6a6462bbb5f7aeae1ceee11da588213ca920d0a is a SHA-512 commitment to this user's real-life identity.
Cloudsarepretty "cloudd" | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||
Motto(s): if you don't touch it, it'll work | |||||||||||||||||
Time zone | UTC-8 |
Projects
Sacramento
/Connect Card, A Transit Card in the Sacramento metro area.
Altamont Corridor Express (Valley Rail) - Since the Valley Rail project has been integrated into the San Joaquin Regional Rail Comission as a joint project, rather than a separate, standalone project, all conceptual stations must be upated to reflect this information. See table below for updated information. (see this website for more information) If you wish to assist in updating information, visit the table at /Valley Rail to be updated. Do NOT update the table on my profile. I will do this.
SJRCC & Amtrak California Valley Rail Project | |||
---|---|---|---|
Status | Station | Station Page Needs More Information? | Completed (User - Date (MM-DD-YY)) |
Not done | Natomas/Sacramento Airport station | ||
Not done | Old North Sacramento station | ||
Not done | Midtown Sacramento station | ||
Not done | City College station | ||
In Progress | Elk Grove station | Cloudsarepretty 08-08-24 | |
Not done | Lodi Transit Station | ||
Not done | North Lathrop station | ||
Not done | Manteca Transit Center | Manteca will have 2 stations of the same name. Clarification will be required, | |
Not done | Ripon station | ||
Not done | Modesto station | ||
Not done | Ceres station | ||
Not done | Turlock station | ||
Not done | Livingston station (Altamont Corridor Express) | ||
Not done | Merced station | ||
Not done for now. | Union City station | This Station should wait to be updated, as it is still currently in the proposal phase |