==History==
==History==
In 1886, the [[Louisville and Nashville Railroad]] (L&N) began to work toward a route through the [[Eastern Kentucky Coalfield]] and [[Southwest Virginia]] in an effort to connect to the [[Norfolk and Western Railway]] (N&W) somewhere near [[Norton, Virginia]]. Surveyors identified a route via [[Middlesboro, Kentucky]], a tunnel under [[Cumberland Gap]], and up the [[Poor Valley]]. The line was completed to Middlesboro in 1889, and then on to a place called Intermont, Virginia (now [[Appalachia, Virginia|Appalachia]]) where it connected with the Atlantic and Ohio (later [[Southern Railway (U.S.)|Southern Railway]]). The route was completed to [[Norton, Virginia]] (then Prince's Flat) in April 1891.


In 1886, the [[Louisville and Nashville Railroad]] (L&N) began to work toward a route into the [[Eastern Kentucky Coalfield]]. Work from [[Corbin, Kentucky]] commenced on April 29, reaching the town of [[Pineville, Kentucky]] in 1888.<ref name="Trains">{{cite magazine|last=Flanary|first=Ron|date=July 2021|title='The Old Reliable' Lays Steel Into the Cumberlands|url=https://www.trains.com/trn/magazine/archive-access/trains-july-2021/|magazine=[[Trains (magazine)|Trains]]|location=Waukesha, WI|publisher=[[Kalmbach Media]]|volume=81|issue=7|pages=14-15}}</ref> The following year, the line was completed to [[Middlesboro, Kentucky]]. The line would be extended into [[Southwest Virginia]] through a tunnel under the [[Cumberland Gap]] and up the [[Poor Valley]] to a place called Intermont, Virginia (now [[Appalachia, Virginia|Appalachia]]) where it connected with the Atlantic and Ohio (later [[Southern Railway (U.S.)|Southern Railway]]). The route was completed to [[Norton, Virginia]] (then Prince's Flat) in April 1891, connecting with the [[Norfolk and Western Railway]] (N&W).<ref name="WnH"/>
The L&N began to make way into [[Harlan County, Kentucky]] by taking over the under-construction Wasioto and Black Mountain Railroad, completing that line to [[Harlan, Kentucky]] in 1911. Further progress was made in 1930, when L&N completed what was then the Martin's Fork Branch and constructed a 6,244-foot tunnel under the [[Cumberland Mountains|Cumberland Mountain]] at [[Hagan, Virginia]]. Original plans called for an extension to connect with the Carolina, Clinchfield, and Ohio Railway (better known as the [[Clinchfield Railroad]]). However, plans were scrapped due to financial uncertainty, and the L&N decided instead to connect the new tunnel to the existing Middlesboro–Norton mainline via a [[Zig zag (railway)|switchback]].<ref name="WnH"/>

In the early-1900s, the L&N purchased the Wasioto and Black Mountain Railroad from local businessman T.J. Ascher, which split from the CV main south of Pineville at a location named Orby (now [[Harbell, Bell County, Kentucky|Harbell]]). Extending up the [[Cumberland River]] valley towards [[Harlan County, Kentucky]], the line was completed to the town of [[Harlan, Kentucky]] in 1911, followed by branches up the three forks of the river: Poor, Clover, and Martin. The L&N's Harlan County service would be enhanced in 1921 with the construction of a 17-track yard at [[Loyall, Kentucky]].<ref name="Trains"/> Further progress was made in 1930, when L&N completed what was then the Martin's Fork Branch and constructed a 6,244-foot tunnel under the [[Cumberland Mountains|Cumberland Mountain]] at [[Hagan, Virginia]]. Original plans called for an extension to connect with the Carolina, Clinchfield, and Ohio Railway (better known as the [[Clinchfield Railroad]]). However, plans were scrapped due to financial uncertainty, and the L&N decided instead to connect the new tunnel to the existing Middlesboro–Norton mainline via a [[Zig zag (railway)|switchback]].<ref name="WnH"/> To compensate for the lack of a connection to the Clinchfield, the L&N would obtain trackage rights over the Interstate from Norton to reach the railroad.

The L&N would replace the [[Double-track railway|double-tracked]] portion of the line between Corbin and Harlan Junction with [[centralized traffic control]] (CTC) in 1956. Later, in early 1986, now-owner [[CSX Transportation]] constructed a new bridge and a connection to the [[Norfolk Southern Railway]] (ex-[[Southern Railway (U.S.)|Southern Railway]]) at [[Big Stone Gap, Virginia]], utilizing that railroad's [[Appalachian District]] as a new route to the Clinchfield main. The original route to Norton would eventually be abandoned.<ref name="Trains"/>


==References==
==References==

Revision as of 02:28, 26 September 2024

CV Subdivision
Overview
Service typeFreight rail
StatusActive
LocaleEastern Kentucky Coalfield
Southwest Virginia
First servicelate 1880s[1]
Current operator(s)CSX Transportation
Former operator(s)Louisville and Nashville Railroad
Route
TerminiCorbin, Kentucky, United States
Big Stone Gap, Virginia, United States
Distance travelled122.4 mi (197.0 km)[2]
Technical
Track gauge1,435 mm (4 ft 8+12 in)
Operating speed10–60 mph (16–97 km/h)
Track owner(s)CSX Transportation
Timetable number(s)CV, WB, WH, WM

The Cumberland Valley Subdivision ( CV Subdivision) is a railroad line owned and operated by the CSX Railroad (CSX Transportation) in the U.S. states of Kentucky and Virginia. The line runs from Corbin, Kentucky, east to Big Stone Gap, Virginia,[3] along a former Louisville and Nashville Railroad line.

At its west end, the CC Subdivision heads north to Cincinnati, Ohio, and the KD Subdivision heads south to Etowah, Tennessee. The east end is at an interchange with the Norfolk Southern Railway Appalachia District, where CSX trains can proceed south to the Kingsport Subdivision at Frisco, Tennessee, via trackage rights.[4][5]

History

In 1886, the Louisville and Nashville Railroad (L&N) began to work toward a route into the Eastern Kentucky Coalfield. Work from Corbin, Kentucky commenced on April 29, reaching the town of Pineville, Kentucky in 1888.[6] The following year, the line was completed to Middlesboro, Kentucky. The line would be extended into Southwest Virginia through a tunnel under the Cumberland Gap and up the Poor Valley to a place called Intermont, Virginia (now Appalachia) where it connected with the Atlantic and Ohio (later Southern Railway). The route was completed to Norton, Virginia (then Prince's Flat) in April 1891, connecting with the Norfolk and Western Railway (N&W).[1]

In the early-1900s, the L&N purchased the Wasioto and Black Mountain Railroad from local businessman T.J. Ascher, which split from the CV main south of Pineville at a location named Orby (now Harbell). Extending up the Cumberland River valley towards Harlan County, Kentucky, the line was completed to the town of Harlan, Kentucky in 1911, followed by branches up the three forks of the river: Poor, Clover, and Martin. The L&N's Harlan County service would be enhanced in 1921 with the construction of a 17-track yard at Loyall, Kentucky.[6] Further progress was made in 1930, when L&N completed what was then the Martin's Fork Branch and constructed a 6,244-foot tunnel under the Cumberland Mountain at Hagan, Virginia. Original plans called for an extension to connect with the Carolina, Clinchfield, and Ohio Railway (better known as the Clinchfield Railroad). However, plans were scrapped due to financial uncertainty, and the L&N decided instead to connect the new tunnel to the existing Middlesboro–Norton mainline via a switchback.[1] To compensate for the lack of a connection to the Clinchfield, the L&N would obtain trackage rights over the Interstate from Norton to reach the railroad.

The L&N would replace the double-tracked portion of the line between Corbin and Harlan Junction with centralized traffic control (CTC) in 1956. Later, in early 1986, now-owner CSX Transportation constructed a new bridge and a connection to the Norfolk Southern Railway (ex-Southern Railway) at Big Stone Gap, Virginia, utilizing that railroad's Appalachian District as a new route to the Clinchfield main. The original route to Norton would eventually be abandoned.[6]

References

  1. ^ a b c Coleman, Christopher. "W&H MAIN YARDS: Guide to Appalachian Coal Hauling Railroads". Retrieved 17 July 2023.
  2. ^ "CSX Transportation Huntington Division West Timetable No. 1" (PDF). CSX Transportation. 1 January 2005. Retrieved 17 July 2023.
  3. ^ CSX Timetables: CV Subdivision
  4. ^ "CV-CV Sub - the RadioReference Wiki".
  5. ^ CSX Huntington West Division Timetable
  6. ^ a b c Flanary, Ron (July 2021). "'The Old Reliable' Lays Steel Into the Cumberlands". Trains. Vol. 81, no. 7. Waukesha, WI: Kalmbach Media. pp. 14–15.