Jump to content

Fairfield–Black Rock station: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
No edit summary
spelling and done
Line 31: Line 31:
'''Fairfield Metro Center''' is a future station on [[Metro-North Railroad]]'s [[New Haven Line]] in eastern [[Fairfield, Connecticut|Fairfield]], [[Connecticut]]. Once completed, it will be the town's third railroad station, located between [[Fairfield (Metro-North station)|Fairfield station]] and [[Bridgeport (Metro-North station)|Bridgeport station]]. The station and commercial complex will be accessible by exit 24 of [[Interstate 95 in Connecticut|I-95]] and several existing two lane roads. The project has recieved approval as a "major traffic generator" from the CT State Traffic Commission. The town created a special zoning district just for this project. The special district will allow the planned buildings to tower higher than anything built to date in either the entire town of Fairfield or the neighboring Bridgeport section of Black Rock.
'''Fairfield Metro Center''' is a future station on [[Metro-North Railroad]]'s [[New Haven Line]] in eastern [[Fairfield, Connecticut|Fairfield]], [[Connecticut]]. Once completed, it will be the town's third railroad station, located between [[Fairfield (Metro-North station)|Fairfield station]] and [[Bridgeport (Metro-North station)|Bridgeport station]]. The station and commercial complex will be accessible by exit 24 of [[Interstate 95 in Connecticut|I-95]] and several existing two lane roads. The project has recieved approval as a "major traffic generator" from the CT State Traffic Commission. The town created a special zoning district just for this project. The special district will allow the planned buildings to tower higher than anything built to date in either the entire town of Fairfield or the neighboring Bridgeport section of Black Rock.


Part of the plan had included building four office buildings and a [[Hilton Hotel]] next to the station but Hilton has reportedly dropped out with ensuing discussions about revising the plans to include high rise residentila units that are now in demand form the market. The street address of the site is 21 Black Rock Turnpike. The government owned station will have 1,500 parking spaces built on top of material stockpiled as part of the remediation of the former brownfield site. Groundwater monitoring facilites will be in place for thirty years to assure no further remediation will be required. The commercial/residential complex will have its own parking garages as well.
Part of the plan had included building four office buildings and a [[Hilton Hotel]] next to the station but Hilton has reportedly dropped out with ensuing discussions about revising the plans to include high rise residential units that are now in demand from the market. The street address of the site is 21 Black Rock Turnpike. The government owned station will have 1,500 parking spaces built on top of material stockpiled as part of the remediation of the former brownfield site. Groundwater monitoring facilites will be in place for thirty years to assure no further remediation will be required. The commercial/residential complex will have its own parking garages as well.


Actual construction of the train station and associated commercial space has yet to begin. Site clearing did begin under questionable circumstances in spring [[2007]]and continues today. [http://www.fairfieldcitizen-news.com/local/ci_5075215]
Actual construction of the train station and associated commercial space has yet to begin. Site clearing did begin under questionable circumstances in spring [[2007]]and continues today. [http://www.fairfieldcitizen-news.com/local/ci_5075215]

Revision as of 15:51, 15 April 2008

Template:Future railway station

Fairfield Metro Center
(planned)
General information
Location21 Black Rock Turnpike
Fairfield, CT
Line(s)Metro-North:
Construction
Parking1,500
Services
Preceding station   MNRR   Following station
Template:MNRR lines

Fairfield Metro Center is a future station on Metro-North Railroad's New Haven Line in eastern Fairfield, Connecticut. Once completed, it will be the town's third railroad station, located between Fairfield station and Bridgeport station. The station and commercial complex will be accessible by exit 24 of I-95 and several existing two lane roads. The project has recieved approval as a "major traffic generator" from the CT State Traffic Commission. The town created a special zoning district just for this project. The special district will allow the planned buildings to tower higher than anything built to date in either the entire town of Fairfield or the neighboring Bridgeport section of Black Rock.

Part of the plan had included building four office buildings and a Hilton Hotel next to the station but Hilton has reportedly dropped out with ensuing discussions about revising the plans to include high rise residential units that are now in demand from the market. The street address of the site is 21 Black Rock Turnpike. The government owned station will have 1,500 parking spaces built on top of material stockpiled as part of the remediation of the former brownfield site. Groundwater monitoring facilites will be in place for thirty years to assure no further remediation will be required. The commercial/residential complex will have its own parking garages as well.

Actual construction of the train station and associated commercial space has yet to begin. Site clearing did begin under questionable circumstances in spring 2007and continues today. [1]

The station is expected to open in late 2009 or early 2010 but numerous projections for completion have been wrong in the past. [2]

The project has been exteremely controversial for a number of reasons including the fact that it was originated by ConnDOT during the the administration of the disgraced former Governor John G. Rowland who was sentenced to federal prison for corruption. And more recently in early 2008, numerous local citizens are questioning the project because government regulatory processes have been short circuited without question by anyone other than concerned citizens. [3] [4][5] [6]