Jump to content

STS-129: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
MKLUG1 (talk | contribs)
No edit summary
Line 56: Line 56:


{{Space Shuttle Endeavour}}
{{Space Shuttle Endeavour}}
{{All U.S. Space Shuttle Missions}}
{{Manned ISS flight}}
{{Manned ISS flight}}



Revision as of 01:37, 23 April 2008

Template:Future spaceflight

STS-129
COSPAR ID2009-062A Edit this at Wikidata
SATCAT no.36094Edit this on Wikidata
End of mission

STS-129 is a planned Space Shuttle mission to the International Space Station (ISS) which will be flown by Space Shuttle Endeavour. The launch date for the mission is planned no earlier than July of 2009 The completion of this mission will leave two flights remaining except for two as yet unconfirmed flights.[2]

Crew

  • To Be Announced

Launching ISS Expedition 20 Crew:

Landing ISS Expedition 20 Crew:

Number in parentheses indicates number of spaceflights by each individual prior to, and including this mission.

Mission parameters

Mission payload

The primary payload of STS-129 is scheduled to be the EXPRESS Logistics Carrier (ELC1) and the ELC2.

Mission background

Mission timeline

See also

References

  1. ^ NASA (2007). "NASA's Shuttle and Rocket Missions". National Aeronautics and Space Administration. {{cite web}}: Unknown parameter |accessmonthday= ignored (help); Unknown parameter |accessyear= ignored (|access-date= suggested) (help)
  2. ^ a b NASA (2007). "Consolidated Launch Manifest". NASA. {{cite web}}: Unknown parameter |accessmonthday= ignored (help); Unknown parameter |accessyear= ignored (|access-date= suggested) (help) Cite error: The named reference "manifest" was defined multiple times with different content (see the help page).
  3. ^ NASA (2008). "NASA Assigns Crews for STS-127 and Expedition 19 Missions". NASA. {{cite web}}: Unknown parameter |accessmonthday= ignored (help); Unknown parameter |accessyear= ignored (|access-date= suggested) (help)