Jump to content

KLIA East @ Labu: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Okortum (talk | contribs)
No edit summary
Okortum (talk | contribs)
No edit summary
Line 43: Line 43:
3. A bus hub at KLIA East
3. A bus hub at KLIA East


A 3km ppKTM Komuter]] railway line also has been proposed from the railway station in Labu to KLIA East.
A 3km [[KTM Komuter]] railway line also has been proposed from the railway station in Labu to KLIA East.


All the costs for building the airport, road and rail links will be privately financed.
All the costs for building the airport, road and rail links will be privately financed.

Revision as of 17:34, 4 January 2009

Template:Future airport

KLIA East @ Labu

LTAKL Timur @ Labu
Summary
OperatorMalaysia Airports (Sepang) Sdn Bhd
LocationLabu, Negeri Sembilan, Malaysia

KLIA East @ Labu is a planned future airport. The airport will be located at Labu, which is 8.6 kilometres away from Kuala Lumpur International Airport (KLIA). It is proposed to replace the low cost carrier terminal (LCCT) in KLIA. By road, the distance from KL’s Golden Triangle to KLIA East is 50km, compared with a distance of 78km to KLIA The construction of the new airport, on a 2,800ha area at the state’s central corridor in Labu, would be financed by the private sector. The two parties who have agreed to it are AirAsia Group and Sime Darby who owns the land). It had been planned to start construction on January 2009 and will open 2011. All airlines at the present LCCT will move here.

The KLIA East@Labu will be connected with KLIA Main Terminal by:-

1. A porposed 7km branch road to link KLIA East@Labu to KLIA and the North South Expressway.

2. A proposed 7km ERL link from KLIA to KLIA East.

3. A bus hub at KLIA East

A 3km KTM Komuter railway line also has been proposed from the railway station in Labu to KLIA East.

All the costs for building the airport, road and rail links will be privately financed.