Jump to content

King Mountain Wind Farm: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
ref
No edit summary
Line 1: Line 1:
The '''King Mountain Wind Farm''' is a 278.2 MW [[wind farm]] in [[Upton County, Texas]], [[United States]]. 214 [[Siemens]] 1.3 megawatt (MW) [[wind turbine]]s are sited in rows along the south-eastern and north-western edges of a [[mesa]] surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 0.75 TWh.<ref name=king>[http://www.powergeneration.siemens.com/en/windpower/casestudies/king/index.cfm King Mountain Wind Farm]</ref> The wind farm is owned by [[FPL Energy]] and the customers for the electricity generated are [[Reliant Energy]] (198.9 MW), [[Austin Energy]] (76.7 MW) and [[Texas-New Mexico Power Company]] (2.6 MW).
The '''King Mountain Wind Farm''' is a 278.2 megawatt (MW) [[wind farm]] in [[Upton County, Texas]], [[United States]]. 214 [[Siemens]] 1.3 MW [[wind turbine]]s are sited in rows along the south-eastern and north-western edges of a [[mesa]] surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 0.75 [[TW·h]].<ref name=king>[http://www.powergeneration.siemens.com/en/windpower/casestudies/king/index.cfm King Mountain Wind Farm]</ref> The wind farm is owned by [[FPL Energy]] and the customers for the electricity generated are [[Reliant Energy]] (198.9 MW), [[Austin Energy]] (76.7 MW) and [[Texas-New Mexico Power Company]] (2.6 MW).


Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.<ref name=king/>
Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.<ref name=king/>

Revision as of 23:34, 20 January 2009

The King Mountain Wind Farm is a 278.2 megawatt (MW) wind farm in Upton County, Texas, United States. 214 Siemens 1.3 MW wind turbines are sited in rows along the south-eastern and north-western edges of a mesa surrounded by deep ravines. The project was completed in December 2001. Annual electricity production is more than 0.75 TW·h.[1] The wind farm is owned by FPL Energy and the customers for the electricity generated are Reliant Energy (198.9 MW), Austin Energy (76.7 MW) and Texas-New Mexico Power Company (2.6 MW).

Dust, sand and high temperatures place extraordinary demands on the wind turbines. Consequently, the design was modified for the desert-like conditions, providing additional cooling and protection against wind-blown sand.[1]

See also

Template:EnergyPortal

References