Petronas Tower 3: Difference between revisions
Appearance
Content deleted Content added
No edit summary |
No edit summary |
||
Line 34: | Line 34: | ||
'''Lot C, KLCC''' is a 58-story [[skyscraper]] that is currently under construction in the vicinity of KLCC, [[Kuala Lumpur]]. The building will feature a 6-level extension to the [[Suria KLCC]] shopping mall and the rest will be an office block. |
'''Lot C, [[KLCC]]''' is a 58-story [[skyscraper]] that is currently under construction in the vicinity of KLCC, [[Kuala Lumpur]]. The building will feature a 6-level extension to the [[Suria KLCC]] shopping mall and the rest will be an office block. |
||
==Construction== |
==Construction== |
Revision as of 05:40, 30 July 2009
Lot C, KLCC | |
---|---|
General information | |
Status | Under construction |
Location | Kuala Lumpur |
Estimated completion | 2012 |
Cost | MYR 665 million for superstructure |
Owner | KLCC Properties |
Management | KLCC Properties |
Height | |
Roof | 267 meters |
Technical details | |
Floor count | 58 |
Floor area | 900,000 square feet |
Design and construction | |
Architect(s) | Pellie Clark Pellie Architects |
Lot C, KLCC is a 58-story skyscraper that is currently under construction in the vicinity of KLCC, Kuala Lumpur. The building will feature a 6-level extension to the Suria KLCC shopping mall and the rest will be an office block.
Construction
Ground breaking has started since late 2006 and finished in February 2009. Deawoo Engineering and Construction began building the top structure from March 2009 onwards. It is expected the Mall section will be done in early 2011 and office block will be done a year later.
The second crane was installed on 4 July, 2009, while the third crane was install on 18 July, 2009.