'''Lot C, [[KLCC]]''' is a 58-story [[skyscraper]] that is currently under construction in the vicinity of KLCC, [[Kuala Lumpur]]. The building will feature a 6-level extension to the [[Suria KLCC]] shopping mall and the rest will be an office block.
'''Lot C, [[KLCC]]''' is the plot of land covering 1.06 acres in the vicinity of KLCC [[Kuala Lumpur]] which will house the proposed 58-story Menara Carigali [[skyscraper]], and is currently under construction. The building will feature a 6-level extension to the [[Suria KLCC]] shopping mall and the rest will make up office spaces. Along with the completed Kuala Lumpur Convention Centre and the Binjai condominium block, Lot C development falls under Phase 2 of the KLCC project.<ref>{{cite news| title=KLCC Masterplan| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCC}}</ref>


==Construction==
==Construction==
Ground breaking has started since late 2006 and finished in February 2009. Deawoo Engineering and Construction began building the top structure from March 2009 onwards. It is expected the Mall section will be done in early 2011 and office block will be done a year later.
Ground breaking has started since late 2006 and finished in February 2009. In January 2009, KLCCP awarded a RM665mil contract for the main structure to Daewoo Engineering and Construction, which began building the top structure in March 2009.<ref> {{cite news| title=Daewoo gets RM665m job from KLCCP| url=http://biz.thestar.com.my/news/story.asp?file=/2009/1/7/business/20090107173115&sec=business| publisher=The Star| date=2009-01-07}}</ref>
It is expected the retail mall section will be ready by early 2011, followed by the office block component a year later.


The second crane was installed on 4 July, 2009, while the third crane was install on 18 July, 2009.
The second crane was installed on 4 July, 2009, while the third crane was installed on 18 July, 2009.

== References ==
{{reflist}}

== External Links ==
* [http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument KLCC official website]
* [http://www.emporis.com/application/?nav=building&lng=3&id=359523 KLCC Lot C on Emporis]


{{KLCC Vicinity}}
{{KLCC Vicinity}}

Revision as of 04:15, 4 September 2009

Lot C, KLCC
Map
General information
StatusUnder construction
LocationKuala Lumpur
Estimated completion2012
CostMYR 665 million for superstructure
OwnerKLCC Properties
ManagementKLCC Properties
Height
Roof267 meters
Technical details
Floor count58
Floor area900,000 square feet
Design and construction
Architect(s)Pellie Clark Pellie Architects


Lot C, KLCC is the plot of land covering 1.06 acres in the vicinity of KLCC Kuala Lumpur which will house the proposed 58-story Menara Carigali skyscraper, and is currently under construction. The building will feature a 6-level extension to the Suria KLCC shopping mall and the rest will make up office spaces. Along with the completed Kuala Lumpur Convention Centre and the Binjai condominium block, Lot C development falls under Phase 2 of the KLCC project.[1]

Construction

Ground breaking has started since late 2006 and finished in February 2009. In January 2009, KLCCP awarded a RM665mil contract for the main structure to Daewoo Engineering and Construction, which began building the top structure in March 2009.[2]

It is expected the retail mall section will be ready by early 2011, followed by the office block component a year later.

The second crane was installed on 4 July, 2009, while the third crane was installed on 18 July, 2009.

References

  1. ^ "KLCC Masterplan". KLCC.
  2. ^ "Daewoo gets RM665m job from KLCCP". The Star. 2009-01-07.