Petronas Tower 3: Difference between revisions
No edit summary |
No edit summary |
||
Line 34: | Line 34: | ||
'''Lot C, [[KLCC]]''' is |
'''Lot C, [[KLCC]]''' is the plot of land covering 1.06 acres in the vicinity of KLCC [[Kuala Lumpur]] which will house the proposed 58-story Menara Carigali [[skyscraper]], and is currently under construction. The building will feature a 6-level extension to the [[Suria KLCC]] shopping mall and the rest will make up office spaces. Along with the completed Kuala Lumpur Convention Centre and the Binjai condominium block, Lot C development falls under Phase 2 of the KLCC project.<ref>{{cite news| title=KLCC Masterplan| url=http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument| publisher=KLCC}}</ref> |
||
==Construction== |
==Construction== |
||
Ground breaking has started since late 2006 and finished in February 2009. |
Ground breaking has started since late 2006 and finished in February 2009. In January 2009, KLCCP awarded a RM665mil contract for the main structure to Daewoo Engineering and Construction, which began building the top structure in March 2009.<ref> {{cite news| title=Daewoo gets RM665m job from KLCCP| url=http://biz.thestar.com.my/news/story.asp?file=/2009/1/7/business/20090107173115&sec=business| publisher=The Star| date=2009-01-07}}</ref> |
||
It is expected the retail mall section will be ready by early 2011, followed by the office block component a year later. |
|||
The second crane was installed on 4 July, 2009, while the third crane was |
The second crane was installed on 4 July, 2009, while the third crane was installed on 18 July, 2009. |
||
== References == |
|||
{{reflist}} |
|||
== External Links == |
|||
* [http://www.klcc.com.my/KLCCWeb/klccp.nsf/F76B777F465FA6E748256D9E00267526/5A7BB0AC7F3DFC14482570C8003488A7?OpenDocument KLCC official website] |
|||
* [http://www.emporis.com/application/?nav=building&lng=3&id=359523 KLCC Lot C on Emporis] |
|||
{{KLCC Vicinity}} |
{{KLCC Vicinity}} |
Revision as of 04:15, 4 September 2009
Lot C, KLCC | |
---|---|
General information | |
Status | Under construction |
Location | Kuala Lumpur |
Estimated completion | 2012 |
Cost | MYR 665 million for superstructure |
Owner | KLCC Properties |
Management | KLCC Properties |
Height | |
Roof | 267 meters |
Technical details | |
Floor count | 58 |
Floor area | 900,000 square feet |
Design and construction | |
Architect(s) | Pellie Clark Pellie Architects |
Lot C, KLCC is the plot of land covering 1.06 acres in the vicinity of KLCC Kuala Lumpur which will house the proposed 58-story Menara Carigali skyscraper, and is currently under construction. The building will feature a 6-level extension to the Suria KLCC shopping mall and the rest will make up office spaces. Along with the completed Kuala Lumpur Convention Centre and the Binjai condominium block, Lot C development falls under Phase 2 of the KLCC project.[1]
Construction
Ground breaking has started since late 2006 and finished in February 2009. In January 2009, KLCCP awarded a RM665mil contract for the main structure to Daewoo Engineering and Construction, which began building the top structure in March 2009.[2]
It is expected the retail mall section will be ready by early 2011, followed by the office block component a year later.
The second crane was installed on 4 July, 2009, while the third crane was installed on 18 July, 2009.
References
- ^ "KLCC Masterplan". KLCC.
- ^ "Daewoo gets RM665m job from KLCCP". The Star. 2009-01-07.
External Links