Jump to content

Scope creep: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Tagged as needing wikification.
No edit summary
Line 4: Line 4:
'''Scope creep''' (also called '''focus creep''', '''requirement creep''', '''feature creep''', '''function creep''') in [[project management]] refers to uncontrolled changes in a [[project|project's]] [[scope (project management)|scope]]. This phenomenon can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered a negative occurrence that is to be avoided.
'''Scope creep''' (also called '''focus creep''', '''requirement creep''', '''feature creep''', '''function creep''') in [[project management]] refers to uncontrolled changes in a [[project|project's]] [[scope (project management)|scope]]. This phenomenon can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered a negative occurrence that is to be avoided.


Typically, the scope increase consists of either new [[Product (business)|products]] or new features of already approved product designs, without corresponding increases in resources, schedule, or budget. As a result, the project team risks drifting away from its original purpose and scope into unplanned additions. As the scope of a project grows, more tasks must be completed within the budget and schedule originally designed for a smaller set of tasks. Thus, scope creep can result in a project team overrunning its original [[budget]] and [[schedule]].
Typically, the scope increase consists of either new [[Product (business)|products]] or new features of already approved product designs, without corresponding increases in resources, schedule, or budget. As a result, the project team risks drifting away from its original purpose and scope into unplanned additions. As the scope of a project grows, more tasks must be completed within the budget and schedule originally designed for a smaller set of tasks. Thus, scope creep can result in a project team overrunning its original [[budget]] and [[schedule]]mainly to the cause of kasar


If the budget and schedule are increased along with the scope, the change is usually considered an acceptable addition to the project, and the term “scope creep” is not used.
If the budget and schedule are increased along with the scope, the change is usually considered an acceptable addition to the project, and the term “scope creep” is not used.

Revision as of 11:35, 19 May 2010


Scope creep (also called focus creep, requirement creep, feature creep, function creep) in project management refers to uncontrolled changes in a project's scope. This phenomenon can occur when the scope of a project is not properly defined, documented, or controlled. It is generally considered a negative occurrence that is to be avoided.

Typically, the scope increase consists of either new products or new features of already approved product designs, without corresponding increases in resources, schedule, or budget. As a result, the project team risks drifting away from its original purpose and scope into unplanned additions. As the scope of a project grows, more tasks must be completed within the budget and schedule originally designed for a smaller set of tasks. Thus, scope creep can result in a project team overrunning its original budget and schedulemainly to the cause of kasar

If the budget and schedule are increased along with the scope, the change is usually considered an acceptable addition to the project, and the term “scope creep” is not used.

Scope creep can be a result of:

Scope creep is a risk in most projects. Most megaprojects fall victim to scope creep (see Megaprojects and risk).[citation needed] Scope creep often results in cost overrun. A value for free strategy is difficult to counteract and remains a difficult challenge for even the most experienced project managers.