Jump to content

ETS Line: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Reverted to revision 377106636 by AeronPeryton; Reference not cited, seems promotional. (TW)
Ziddty (talk | contribs)
No edit summary
Line 4: Line 4:
{{ETS Express Line}}
{{ETS Express Line}}


ETS (Electric Train Services) is a new express service Ipoh to Kuala Lumpur and Seremban. It was introduced on 12th August 2010.
New express service between Ipoh - Seremban will introduce soon after KTMB has received the first of 5 ordered Electrical Train Set (ETS) from Rotem.


==ETS technical specifications==
==ETS technical specifications==
Maximum operation speed: 140 km/h
*Maximum operation speed: 140 km/h
Maximum design speed: 160 km/h
*Maximum design speed: 160 km/h
Passenger capacity: 350
*Passenger capacity: 350
Length: 138m (6 car train)
*Length: 138m (6 car train)
Weight: 231.8 tons
*Weight: 231.8 tons


==Carriage dimensions==
==Carriage dimensions==

Revision as of 12:42, 12 August 2010

Hat Yai Junction
Khlong Ngae
Padang Besar (Thai)
Thailand
Malaysia
international
border
Padang Besar
International Express  2 
Arau
 2 
Perlis
Kedah
state
border
Kedah River Bridge
Anak Bukit
Sultan Abdul Halim Airport
 2 
Alor Setar
 2 
Gurun
 2 
Sungai Petani
 2 
Sungai Muda bridge
Kedah
Penang
state
border
Tasek Gelugor
 2 
Butterworth Penang ferry service
 2   3 
Bukit Mertajam
 1   2 
Bukit Mertajam junction
North-South Expressway
Nibong Tebal
 1 
Kerian River bridge
Penang
Perak
state
border
Parit Buntar
 1 
Bagan Serai
 1 
North-South Expressway
Bukit Merah Lake Railway Bridge
Kamunting
 1 
Taiping
 1 
Padang Rengas
 1 
Kuala Kangsar
 1 
Perak River bridge
(Formerly Victoria Bridge)
Sungai Siput
 1 
Ipoh
Sultan Azlan Shah Airport
 1 
Batu Gajah
Kampar
Tapah Road
Sungkai
Slim River
Behrang
Tanjung Malim
Sungai Bernam bridge
Perak
Selangor
state
border
Kuala Kubu Bharu
Batang Kali
Rawang
Sungai Buloh
Kepong Sentral
Kuala Lumpur
1 2 5 9
Kuala Lumpur Sentral
1 2 5 6 7 8 9 10
Bandar Tasik Selatan
1 4 7
Kajang
Seremban
Negeri Sembilan
Malacca
state
border
Pulau Sebang/Tampin
Batang Melaka
Gemas
KTM Intercity
extension by 2025
 
Gemas River bridge
Negeri Sembilan
Johor
state
border
Sungai Muar bridge
Segamat
KTM Intercity
Genuang
Tenang
Labis
KTM Intercity
Bekok
KTM Intercity
Paloh
KTM Intercity
Chamek
KTM Intercity
Kluang
KTM Intercity
Mengkibol
Renggam
KTM Intercity
Layang-Layang
KTM Intercity
Kulai
KTM Intercity
Kempas Bahru
KTM Intercity
Johor Bahru Sentral
  RTS   BRT  KTM Intercity
Malaysia
Singapore
international
border

ETS (Electric Train Services) is a new express service Ipoh to Kuala Lumpur and Seremban. It was introduced on 12th August 2010.

ETS technical specifications

  • Maximum operation speed: 140 km/h
  • Maximum design speed: 160 km/h
  • Passenger capacity: 350
  • Length: 138m (6 car train)
  • Weight: 231.8 tons

Carriage dimensions

  • Length: 22.95m
  • Width: 2.75m
  • Height: 4m

See also

References