ETS Line: Difference between revisions
Appearance
Content deleted Content added
AeronPeryton (talk | contribs) Reverted to revision 377106636 by AeronPeryton; Reference not cited, seems promotional. (TW) |
No edit summary |
||
Line 4: | Line 4: | ||
{{ETS Express Line}} |
{{ETS Express Line}} |
||
ETS (Electric Train Services) is a new express service Ipoh to Kuala Lumpur and Seremban. It was introduced on 12th August 2010. |
|||
New express service between Ipoh - Seremban will introduce soon after KTMB has received the first of 5 ordered Electrical Train Set (ETS) from Rotem. |
|||
==ETS technical specifications== |
==ETS technical specifications== |
||
Maximum operation speed: 140 km/h |
*Maximum operation speed: 140 km/h |
||
Maximum design speed: 160 km/h |
*Maximum design speed: 160 km/h |
||
Passenger capacity: 350 |
*Passenger capacity: 350 |
||
Length: 138m (6 car train) |
*Length: 138m (6 car train) |
||
Weight: 231.8 tons |
*Weight: 231.8 tons |
||
==Carriage dimensions== |
==Carriage dimensions== |
Revision as of 12:42, 12 August 2010
This redirect has not been added to any content categories. Please help out by adding categories to it so that it can be listed with similar redirects. (August 2010) |
ETS (Electric Train Services) is a new express service Ipoh to Kuala Lumpur and Seremban. It was introduced on 12th August 2010.
ETS technical specifications
- Maximum operation speed: 140 km/h
- Maximum design speed: 160 km/h
- Passenger capacity: 350
- Length: 138m (6 car train)
- Weight: 231.8 tons
Carriage dimensions
- Length: 22.95m
- Width: 2.75m
- Height: 4m