Intermountain Power Agency: Difference between revisions
m Robot - Moving category Coal power companies of the United States to Power companies of the United States per CFD at Wikipedia:Categories for discussion/Log/2010 July 19. |
Traveler100 (talk | contribs) No edit summary |
||
Line 1: | Line 1: | ||
{{For|other uses|Intermountain}} |
{{For|other uses|Intermountain}} |
||
{{Refimprove|date=December 2009}} {{Cleanup-link rot|date=December 2009}} |
{{Refimprove|date=December 2009}} {{Cleanup-link rot|date=December 2009}} |
||
{{Merge |Intermountain Power Plant|date=September 2010}} |
|||
The '''Intermountain Power Agency''' located in [[Utah]] is responsible for running the [[Intermountain Power Project]] near [[Delta, Utah]], a [[coal fired]] power plant capable of generating 1800 [[megawatts]]. The IPA also runs [[transmission lines]] to [[Mona, Utah]], to [[Adelanto, California]] and near [[Ely, Nevada]]. |
The '''Intermountain Power Agency''' located in [[Utah]] is responsible for running the [[Intermountain Power Project]] near [[Delta, Utah]], a [[coal fired]] power plant capable of generating 1800 [[megawatts]]. The IPA also runs [[transmission lines]] to [[Mona, Utah]], to [[Adelanto, California]] and near [[Ely, Nevada]]. |
||
Revision as of 17:20, 10 September 2010
This article needs additional citations for verification. (December 2009) |
It has been suggested that this article be merged with Intermountain Power Plant. (Discuss) Proposed since September 2010. |
The Intermountain Power Agency located in Utah is responsible for running the Intermountain Power Project near Delta, Utah, a coal fired power plant capable of generating 1800 megawatts. The IPA also runs transmission lines to Mona, Utah, to Adelanto, California and near Ely, Nevada.
About 75 percent of the generated power is purchased by cities in southern California and the remainder is purchased by cities, cooperatives and Pacificorp in Utah and a cooperative in Nevada. The plant employs about 500 people and contributes significantly to the Millard County, Utah economy.
Recently, the IPA and the Utah Associated Municipal Power Systems have filed a lawsuit against the Los Angeles Department of Water and Power for trying to prevent a third coal fired unit at the IPP generation site due to carbon dioxide emissions concerns.[1]
The third unit of the Intermountain Power Project, a 900 megawatt unit is currently scheduled to go online around 2012.[2]