Jump to content

Tennyson Power Station: Difference between revisions

Coordinates: 27°31′29″S 153°00′22″E / 27.5246°S 153.006°E / -27.5246; 153.006
From Wikipedia, the free encyclopedia
Content deleted Content added
add background, wikilinks, fix construction start year
m fixing page range dashes using AWB (7840)
Line 44: Line 44:
The '''Tennyson Power Station''' was a [[coal-fired power station]] in [[Tennyson, Queensland]] which operated between 1953 an 1986.<ref>{{cite web|title=The History of the Tennyson Reach Site|url=http://www.mirvacdevelopment.com/tennyson-reach/site-history}}</ref> The power station was the second major plant constructed for Brisbane, the first being the [[Brisbane Powerhouse|New Farm Powerhouse]]. It had an installed capacity of 250&nbsp;MW.<ref>{{cite web|url=http://www.industcards.com/st-coal-australia-qld-sa.htm|title=Coal-Fired Plants in Australia - QLD & SA}}</ref>
The '''Tennyson Power Station''' was a [[coal-fired power station]] in [[Tennyson, Queensland]] which operated between 1953 an 1986.<ref>{{cite web|title=The History of the Tennyson Reach Site|url=http://www.mirvacdevelopment.com/tennyson-reach/site-history}}</ref> The power station was the second major plant constructed for Brisbane, the first being the [[Brisbane Powerhouse|New Farm Powerhouse]]. It had an installed capacity of 250&nbsp;MW.<ref>{{cite web|url=http://www.industcards.com/st-coal-australia-qld-sa.htm|title=Coal-Fired Plants in Australia - QLD & SA}}</ref>


Planning for a new power station started in 1946 as plants at [[New Farm, Queensland|New Farm]] and [[Bulimba, Queensland|Bulimba]] had reached capacity.<ref name="heq">{{cite book |title=The History of Electricity in Queensland |last=Dunn |first=Col |year=1985 |publisher=Col Dunn |location=Bundaberg |isbn=0 9589229 0 X |pages=85-88 |accessdate=21 July 2011}}</ref> Before the Tennyson Power Station was completed demand for power was exceeding capacity. This led to the successful staggering of work hours and some restrictions on electricity use.
Planning for a new power station started in 1946 as plants at [[New Farm, Queensland|New Farm]] and [[Bulimba, Queensland|Bulimba]] had reached capacity.<ref name="heq">{{cite book |title=The History of Electricity in Queensland |last=Dunn |first=Col |year=1985 |publisher=Col Dunn |location=Bundaberg |isbn=0 9589229 0 X |pages=85–88 |accessdate=21 July 2011}}</ref> Before the Tennyson Power Station was completed demand for power was exceeding capacity. This led to the successful staggering of work hours and some restrictions on electricity use.


The land on which the power station was built was acquired by [[Brisbane City Council]] in 1947 as an ideal site to generate power for the city, due to its proximity to the [[Brisbane central business district]] and both rail and river access from [[Ipswich, Queensland|Ipswich]]. Construction of the power station began in 1949.<ref name="heq"/>
The land on which the power station was built was acquired by [[Brisbane City Council]] in 1947 as an ideal site to generate power for the city, due to its proximity to the [[Brisbane central business district]] and both rail and river access from [[Ipswich, Queensland|Ipswich]]. Construction of the power station began in 1949.<ref name="heq"/>

Revision as of 19:30, 23 September 2011

Tennyson Power Station
Map
CountryAustralia
Coordinates27°31′29″S 153°00′22″E / 27.5246°S 153.006°E / -27.5246; 153.006
StatusDecommissioned
Construction began1949
Commission date1955
Decommission date1986
OperatorsDeptartment of Electricity, Brisbane City Council
External links
CommonsRelated media on Commons

The Tennyson Power Station was a coal-fired power station in Tennyson, Queensland which operated between 1953 an 1986.[1] The power station was the second major plant constructed for Brisbane, the first being the New Farm Powerhouse. It had an installed capacity of 250 MW.[2]

Planning for a new power station started in 1946 as plants at New Farm and Bulimba had reached capacity.[3] Before the Tennyson Power Station was completed demand for power was exceeding capacity. This led to the successful staggering of work hours and some restrictions on electricity use.

The land on which the power station was built was acquired by Brisbane City Council in 1947 as an ideal site to generate power for the city, due to its proximity to the Brisbane central business district and both rail and river access from Ipswich. Construction of the power station began in 1949.[3]

The power plant was fueled by subbituminous coal, brought down the Brisbane River on barges from Ipswich.

After the power station was shut down, demolition was avoided for many years, partially due to the hazardous nature of the asbestos used in construction.[4] In 2005, a contract was awarded to the developer Mirvac by the Government of Queensland to develop the site. The power station was demolished and both the Queensland Tennis Centre and Tennyson Reach apartment complex were built in its place.

References

  1. ^ "The History of the Tennyson Reach Site".
  2. ^ "Coal-Fired Plants in Australia - QLD & SA".
  3. ^ a b Dunn, Col (1985). The History of Electricity in Queensland. Bundaberg: Col Dunn. pp. 85–88. ISBN 0 9589229 0 X. {{cite book}}: |access-date= requires |url= (help)
  4. ^ "Tennyson Power Station".