Jump to content

Greensboro station (Washington Metro): Difference between revisions

Coordinates: 38°55′15″N 77°14′01″W / 38.920847°N 77.233683°W / 38.920847; -77.233683
From Wikipedia, the free encyclopedia
Content deleted Content added
m Dmp348 moved page Tysons Central (WMATA station) to Greensboro (WMATA station): Fairfax County Board of Supervisors changed name
Station renamed
Line 1: Line 1:
{{Infobox Station
{{Infobox Station
| name = Tysons Central
| name = Greensboro
| type = [[Washington Metro]] rapid transit station
| type = [[Washington Metro]] rapid transit station
| image = WMATA_Rendering_Tysons_Central_7.gif
| image = WMATA_Rendering_Tysons_Central_7.gif
Line 32: Line 32:
| mpassengers =
| mpassengers =
}}
}}
'''Tysons Central''' (preliminary name '''Tysons Central 7''') <ref>{{cite news|url=http://www.washingtonpost.com/blogs/dr-gridlock/post/fairfax-oks-names-for-tysons-metrorail-stations/2011/03/29/AFVQC1vB_blog.html|newspaper=Washington Post|title=Fairfax OKs names for new Metrorail stations|last=Hosh|first=Kafia|date=March 29, 2011|accessdate=March 29, 2011}}</ref> is a [[Washington Metro]] station currently under construction in [[Tysons Corner, Virginia|Tysons Corner]], an unincorporated area in [[Fairfax County, Virginia|Fairfax County]], [[Virginia]], on the [[Silver Line (Washington Metro)|Silver Line]]. Expected to open in 2013 with the first part of the Silver Line, Tysons Central is one of four Metro stations in the Tysons Corner area and is planned to be part of the massive regeneration of the district.
'''Greensboro''' (preliminary names '''Tysons Central 7, Tysons Central''') <ref>{{cite news|url=http://www.fairfaxcounty.gov/news/2012/updates/board-approves-silver-line-station-names.htm|title=Board of Supervisors Approves Proposed Silver Line Station Names|date=April 10, 2012|accessdate=April 11, 2012}}</ref><ref>{{cite news|url=http://www.washingtonpost.com/blogs/dr-gridlock/post/fairfax-oks-names-for-tysons-metrorail-stations/2011/03/29/AFVQC1vB_blog.html|newspaper=Washington Post|title=Fairfax OKs names for new Metrorail stations|last=Hosh|first=Kafia|date=March 29, 2011|accessdate=March 29, 2011}}</ref> is a [[Washington Metro]] station currently under construction in [[Tysons Corner, Virginia|Tysons Corner]], an unincorporated area in [[Fairfax County, Virginia|Fairfax County]], [[Virginia]], on the [[Silver Line (Washington Metro)|Silver Line]]. Expected to open in 2013 with the first part of the Silver Line, Greensboro will be one of four Metro stations in the Tysons Corner area and is planned to be part of the massive regeneration of the district.


==Location==
==Location==
Tysons Central station will be located within west-central [[Tysons Corner, Virginia|Tysons Corner]], specifically in the median of [[Virginia State Route 7|Route 7]] (Leesburg Pike). Much of the surrounding area is commercial in nature, with the Pike Seven Plaza Shopping Center to the west and [[Tysons Galleria]] to the east with little in the way of residential development. Traffic counts by the [[Virginia Department of Transportation]] (VDOT) show that the section of Leesburg Pike on which the station will sit is the most heavily-used in Fairfax County with 61,000 vehicles per day using the stretch of road between Route 123 and the Dulles Toll Road.<ref name="traffic">[http://www.virginiadot.org/info/resources/2009/AADT_029_Fairfax_2009.pdf 2009 Fairfax County traffic counts] ''VDOT'' Retrieved 13 August 2010</ref>
Greensboro station will be located within west-central [[Tysons Corner, Virginia|Tysons Corner]], specifically in the median of [[Virginia State Route 7|Route 7]] (Leesburg Pike). Much of the surrounding area is commercial in nature, with the Pike Seven Plaza Shopping Center to the west and [[Tysons Galleria]] to the east with little in the way of residential development. Traffic counts by the [[Virginia Department of Transportation]] (VDOT) show that the section of Leesburg Pike on which the station will sit is the most heavily-used in Fairfax County with 61,000 vehicles per day using the stretch of road between Route 123 and the Dulles Toll Road.<ref name="traffic">[http://www.virginiadot.org/info/resources/2009/AADT_029_Fairfax_2009.pdf 2009 Fairfax County traffic counts] ''VDOT'' Retrieved 13 August 2010</ref>


===Transit-oriented development===
===Transit-oriented development===
In order to reduce congestion and improve walkability and connectivity in the area, the Fairfax County Planning Commission created the "Tysons Corner Urban Center Comprehensive Plan," an outline for the urbanisation of Tysons Corner in conjunction with the opening of the Silver Line. As one of four Metro stations within the identified locale, Tysons Central will be the focal point of one of the [[transit-oriented development]] schemes in the plan. According to the Commission's outline, the area bounded by Route 123, Gosnell Drive, Westpark Drive, and International Drive will be designated as the Tysons Central 7 District and contain high-density residential and commercial mixed-use development.<ref name="district plan">[http://www.fairfaxcounty.gov/dpz/comprehensiveplan/adoptedtext/2007-23.pdf Fairfax County Comprehensive Plan: Tysons Corner Urban Center] ''Fairfax County Planning Commission'' Retrieved 13 August 2010</ref>
In order to reduce congestion and improve walkability and connectivity in the area, the Fairfax County Planning Commission created the "Tysons Corner Urban Center Comprehensive Plan," an outline for the urbanisation of Tysons Corner in conjunction with the opening of the Silver Line. As one of four Metro stations within the identified locale, Greensboro will be the focal point of one of the [[transit-oriented development]] schemes in the plan. According to the Commission's outline, the area bounded by Route 123, Gosnell Drive, Westpark Drive, and International Drive will be designated as the Tysons Central 7 District and contain high-density residential and commercial mixed-use development.<ref name="district plan">[http://www.fairfaxcounty.gov/dpz/comprehensiveplan/adoptedtext/2007-23.pdf Fairfax County Comprehensive Plan: Tysons Corner Urban Center] ''Fairfax County Planning Commission'' Retrieved 13 August 2010</ref>


The Tysons Central 7 District is divided into two sub-districts, North and South, separated by Route 7. The south sub-district is approximately {{convert|76|acre|ha|0}} large and will contain mixed-use development, with offices predominating near the station and residential buildings in the outer transition zone. The plan calls for a "civic commons" to be the central open space in the sub-district with government and civi-related buildings surrounding it.<ref name="district plan"/> The north sub-district is similar in nature, but is {{convert|102|acre|ha|0}} in area. In contrast, the north sub-district is planned to be more vibrant and 24-hour than the south, with a minimum building height of {{convert|175|ft|m||0}}, although both sectors have a maximum allowance of {{convert|400|ft|m|0}}.<ref name="district plan"/> To connect these districts, it is envisioned that Leesburg Pike will be reconfigured, along with Chain Bridge Road, to a "boulevard" design, with a median separating four lanes of traffic each way, as well as landscaping the sidewalks to improve walkability. Radiating out from Route 7 will be a series of avenues and collector streets, each with different regulations to create a hierarchical street grid.<ref name="district plan"/>
The Tysons Central 7 District is divided into two sub-districts, North and South, separated by Route 7. The south sub-district is approximately {{convert|76|acre|ha|0}} large and will contain mixed-use development, with offices predominating near the station and residential buildings in the outer transition zone. The plan calls for a "civic commons" to be the central open space in the sub-district with government and civi-related buildings surrounding it.<ref name="district plan"/> The north sub-district is similar in nature, but is {{convert|102|acre|ha|0}} in area. In contrast, the north sub-district is planned to be more vibrant and 24-hour than the south, with a minimum building height of {{convert|175|ft|m||0}}, although both sectors have a maximum allowance of {{convert|400|ft|m|0}}.<ref name="district plan"/> To connect these districts, it is envisioned that Leesburg Pike will be reconfigured, along with Chain Bridge Road, to a "boulevard" design, with a median separating four lanes of traffic each way, as well as landscaping the sidewalks to improve walkability. Radiating out from Route 7 will be a series of avenues and collector streets, each with different regulations to create a hierarchical street grid.<ref name="district plan"/>


==History==
==History==
Tysons Central station is expected to open as part of the first phase of the Silver Line to [[Reston – Wiehle Avenue (WMATA station)|Reston – Wiehle Avenue]] in 2013. In the planning stages, [[Silver Line (Washington Metro)#Tysons Corner tunnel dispute|controversy ensued]] over whether to build the Metro in a tunnel or on an elevated viaduct through Tysons Corner. It was eventually decided that the majority of the line would be built above ground, but the station will be built partially below ground in order to send trains through a short tunnel connecting the line's Route 7 and Route 123-paralleling sections.
Greensboro station is expected to open as part of the first phase of the Silver Line to [[Reston – Wiehle Avenue (WMATA station)|Reston – Wiehle Avenue]] in 2013. In the planning stages, [[Silver Line (Washington Metro)#Tysons Corner tunnel dispute|controversy ensued]] over whether to build the Metro in a tunnel or on an elevated viaduct through Tysons Corner. It was eventually decided that the majority of the line would be built above ground, but the station will be built partially below ground in order to send trains through a short tunnel connecting the line's Route 7 and Route 123-paralleling sections.


==Station layout==
==Station layout==
Like [[Tysons – Spring Hill Road (WMATA station)|Tysons – Spring Hill Road station]], Tysons Central will be built within the median of SR 7 with a single island platform serving two tracks. However, unique amongst all Silver Line stations in Tysons Corner, it will be built partially at ground level and sub-surface.<ref name="tc7 official">[http://www.dullesmetro.com/stations/tyson_7.cfm Tysons Central 7 station] ''Dulles Metrorail'' Retrieved 13 August 2010</ref> The construction and overall design of the station have been likened to that of [[Naylor Road (WMATA station)|Naylor Road]] station on the Green Line because of its depressed but open-air layout. This is the result of the south end of the station acting as the western portal for the connecting tunnel leading to [[Virginia State Route 123|SR 123]] while SR 7 slopes upwards towards the east.<ref name="tc7 official"/> A mezzanine covering the central half of the platform will contain ticket machines and faregates; two aerial walkway exits will cross either side of Route 7 and meet at the mezzanine.<ref name="tc7 official"/> The main platform will have a height of {{convert|-12|ft|m|abbv=on}} at its east end and {{convert|12|ft|m|abbv=on}} at its west end.<ref>{{cite web|url=http://www.dullesmetro.com/pdfs/DCMPStationHeights-2-18-09.docx|publisher=WMAA|title=DCMP Station Heights Actual|accessdate=2010-11-10}}</ref>
Like [[Tysons – Spring Hill Road (WMATA station)|Tysons – Spring Hill Road station]], Greensboro will be built within the median of SR 7 with a single island platform serving two tracks. However, unique amongst all Silver Line stations in Tysons Corner, it will be built partially at ground level and sub-surface.<ref name="tc7 official">[http://www.dullesmetro.com/stations/tyson_7.cfm Tysons Central 7 station] ''Dulles Metrorail'' Retrieved 13 August 2010</ref> The construction and overall design of the station have been likened to that of [[Naylor Road (WMATA station)|Naylor Road]] station on the Green Line because of its depressed but open-air layout. This is the result of the south end of the station acting as the western portal for the connecting tunnel leading to [[Virginia State Route 123|SR 123]] while SR 7 slopes upwards towards the east.<ref name="tc7 official"/> A mezzanine covering the central half of the platform will contain ticket machines and faregates; two aerial walkway exits will cross either side of Route 7 and meet at the mezzanine.<ref name="tc7 official"/> The main platform will have a height of {{convert|-12|ft|m|abbv=on}} at its east end and {{convert|12|ft|m|abbv=on}} at its west end.<ref>{{cite web|url=http://www.dullesmetro.com/pdfs/DCMPStationHeights-2-18-09.docx|publisher=WMAA|title=DCMP Station Heights Actual|accessdate=2010-11-10}}</ref>


==Station Facilities==
==Station Facilities==

Revision as of 04:22, 12 April 2012

Greensboro
Washington Metro rapid transit station
File:WMATA Rendering Tysons Central 7.gif
General information
Location8300 Leesburg Pike
Tysons Corner, VA 22102
Owned byWMATA
Line(s)
Platforms1 island platform
Tracks2
Construction
Structure typeOpen-cut
AccessibleYes
Other information
Station codeN04
History
OpenedExpected to open in 2013
Services
Preceding station   WMATA   Following station
Ashburn
Loudoun Gateway
Dulles Yard
Dulles International Airport Dulles Airport
Innovation Center
Herndon
Reston Town Center
Wiehle–Reston East
Shady Grove Yard
Spring Hill
Shady Grove
Greensboro
Rockville
Capitol Limited
Twinbrook
Tysons
McLean
North Bethesda
Vienna
Grosvenor–Strathmore
Dunn Loring
Glenmont Yard
Medical Center
Glenmont
Falls Church Yard
Greenbelt Yard
West Falls Church
Greenbelt
Greenbelt–BWI Airport Line
East Falls Church
Wheaton
Ballston–MU
College Park
Bethesda
Forest Glen
Virginia Square–GMU
Hyattsville Crossing
Friendship Heights
Silver Spring
Tenleytown–AU
West Hyattsville
Clarendon
Takoma
Van Ness–UDC
Fort Totten
Court House
Georgia Avenue–Petworth
Cleveland Park
Columbia Heights
Woodley Park
Brookland–CUA
Dupont Circle
Rhode Island Avenue
Rosslyn
Brentwood Yard
Foggy Bottom–GWU
NoMa–Gallaudet U
Farragut North
Union Station
DC StreetcarVirginia Railway ExpressAmtrak
Farragut West
U Street
Shaw–Howard University
Arlington Cemetery
Mount Vernon Square
McPherson Square
Judiciary Square
Metro Center
Gallery Place
Federal Triangle
Smithsonian
Archives
L'Enfant Plaza
Federal Center SW
Waterfront
Capitol South
Navy Yard–Ballpark
Eastern Market
Anacostia
Potomac Avenue
Congress Heights
Stadium–Armory
Pentagon
Pentagon City
Minnesota Avenue
Virginia Railway Express Crystal City
Benning Road
Southern Avenue
Deanwood
Ronald Reagan Washington National Airport National Airport
Cheverly
Naylor Road
Capitol Heights
Suitland
Addison Road
Branch Avenue
Landover
Branch Avenue Yard
New Carrollton
Amtrak
Potomac Yard
Morgan Boulevard
Braddock Road
New Carrollton Yard
Virginia Railway Express King Street–Old Town
Downtown Largo
Alexandria Yard
Van Dorn Street
Eisenhower Avenue
Virginia Railway Express
Franconia–Springfield
Huntington
Key
Red Line
Green Line
Orange Line
Yellow Line
Blue Line
Silver Line
Multiple services
Non-revenue tracks

Handicapped/disabled access All stations are accessible

Greensboro (preliminary names Tysons Central 7, Tysons Central) [1][2] is a Washington Metro station currently under construction in Tysons Corner, an unincorporated area in Fairfax County, Virginia, on the Silver Line. Expected to open in 2013 with the first part of the Silver Line, Greensboro will be one of four Metro stations in the Tysons Corner area and is planned to be part of the massive regeneration of the district.

Location

Greensboro station will be located within west-central Tysons Corner, specifically in the median of Route 7 (Leesburg Pike). Much of the surrounding area is commercial in nature, with the Pike Seven Plaza Shopping Center to the west and Tysons Galleria to the east with little in the way of residential development. Traffic counts by the Virginia Department of Transportation (VDOT) show that the section of Leesburg Pike on which the station will sit is the most heavily-used in Fairfax County with 61,000 vehicles per day using the stretch of road between Route 123 and the Dulles Toll Road.[3]

Transit-oriented development

In order to reduce congestion and improve walkability and connectivity in the area, the Fairfax County Planning Commission created the "Tysons Corner Urban Center Comprehensive Plan," an outline for the urbanisation of Tysons Corner in conjunction with the opening of the Silver Line. As one of four Metro stations within the identified locale, Greensboro will be the focal point of one of the transit-oriented development schemes in the plan. According to the Commission's outline, the area bounded by Route 123, Gosnell Drive, Westpark Drive, and International Drive will be designated as the Tysons Central 7 District and contain high-density residential and commercial mixed-use development.[4]

The Tysons Central 7 District is divided into two sub-districts, North and South, separated by Route 7. The south sub-district is approximately 76 acres (31 ha) large and will contain mixed-use development, with offices predominating near the station and residential buildings in the outer transition zone. The plan calls for a "civic commons" to be the central open space in the sub-district with government and civi-related buildings surrounding it.[4] The north sub-district is similar in nature, but is 102 acres (41 ha) in area. In contrast, the north sub-district is planned to be more vibrant and 24-hour than the south, with a minimum building height of 175 feet (53 m)*, although both sectors have a maximum allowance of 400 feet (122 m).[4] To connect these districts, it is envisioned that Leesburg Pike will be reconfigured, along with Chain Bridge Road, to a "boulevard" design, with a median separating four lanes of traffic each way, as well as landscaping the sidewalks to improve walkability. Radiating out from Route 7 will be a series of avenues and collector streets, each with different regulations to create a hierarchical street grid.[4]

History

Greensboro station is expected to open as part of the first phase of the Silver Line to Reston – Wiehle Avenue in 2013. In the planning stages, controversy ensued over whether to build the Metro in a tunnel or on an elevated viaduct through Tysons Corner. It was eventually decided that the majority of the line would be built above ground, but the station will be built partially below ground in order to send trains through a short tunnel connecting the line's Route 7 and Route 123-paralleling sections.

Station layout

Like Tysons – Spring Hill Road station, Greensboro will be built within the median of SR 7 with a single island platform serving two tracks. However, unique amongst all Silver Line stations in Tysons Corner, it will be built partially at ground level and sub-surface.[5] The construction and overall design of the station have been likened to that of Naylor Road station on the Green Line because of its depressed but open-air layout. This is the result of the south end of the station acting as the western portal for the connecting tunnel leading to SR 123 while SR 7 slopes upwards towards the east.[5] A mezzanine covering the central half of the platform will contain ticket machines and faregates; two aerial walkway exits will cross either side of Route 7 and meet at the mezzanine.[5] The main platform will have a height of −12 feet (−3.7 m)* at its east end and 12 feet (3.7 m)* at its west end.[6]

Station Facilities

  • 2 station entrances (each side of Route 123)
  • Pedestrian bridge crossing Route 123
  • Bus dropoff/pickup

References

  1. ^ "Board of Supervisors Approves Proposed Silver Line Station Names". April 10, 2012. Retrieved April 11, 2012.
  2. ^ Hosh, Kafia (March 29, 2011). "Fairfax OKs names for new Metrorail stations". Washington Post. Retrieved March 29, 2011.
  3. ^ 2009 Fairfax County traffic counts VDOT Retrieved 13 August 2010
  4. ^ a b c d Fairfax County Comprehensive Plan: Tysons Corner Urban Center Fairfax County Planning Commission Retrieved 13 August 2010
  5. ^ a b c Tysons Central 7 station Dulles Metrorail Retrieved 13 August 2010
  6. ^ "DCMP Station Heights Actual". WMAA. Retrieved 2010-11-10.

38°55′15″N 77°14′01″W / 38.920847°N 77.233683°W / 38.920847; -77.233683