Bangladesh Power Development Board: Difference between revisions
Adding place in hierarchy of nation's ministries |
Added Reference |
||
Line 5: | Line 5: | ||
As on June-2010, in FY 2009-2010, BPDB had a total installed capacity of 5823 MW at 88 units (BPDB 3719 MW at 50 Unit and IPP,SIPP & Rental at 38 units) of Power Plants located at different parts of the country. |
As on June-2010, in FY 2009-2010, BPDB had a total installed capacity of 5823 MW at 88 units (BPDB 3719 MW at 50 Unit and IPP,SIPP & Rental at 38 units) of Power Plants located at different parts of the country. |
||
The main fuel used for power generation in BPDB plants is indigenous natural gas. A total of 17,079 Gwh gross energy was generated in the public sector power plants operated by BPDB in 2010. In addition, total 11,327 Gwh of energy was purchased by BPDB from Independent Power Producers (IPP, SIPP & Rental) in the private sector. |
The main fuel used for power generation in BPDB plants is indigenous natural gas. BPDP operations also include projects that utilize renewable power sources including offshore wind power generation.<ref name=mywindpower >{{cite web |url= http://www.mywindpowersystem.com/2010/05/08/bangladesh-power-development-boardbpdb-announces-100200-mw-project/ |title=Offshore Wind Farm | accessdate=10 Jul 2012}}</ref> A total of 17,079 Gwh gross energy was generated in the public sector power plants operated by BPDB in 2010. In addition, total 11,327 Gwh of energy was purchased by BPDB from Independent Power Producers (IPP, SIPP & Rental) in the private sector. |
||
The maximum demand served during peak hours is 4698.5 MW in August 20, 2010. The transmission network is 8465 ckt km long comprising 230, 132 and 66 KV lines. The total numbers of grid sub-stations are 108 and the total capacity is 16,749 MVA as on June-2010. |
The maximum demand served during peak hours is 4698.5 MW in August 20, 2010. The transmission network is 8465 ckt km long comprising 230, 132 and 66 KV lines. The total numbers of grid sub-stations are 108 and the total capacity is 16,749 MVA as on June-2010. |
Revision as of 19:58, 10 July 2012
The Bangladesh Power Development Board (BPDB) was created as a public sector organization to boost the country’s power sector after the emergence of Bangladesh as an independent state in 1972. The organization is responsible for planning and developing the nation's power infrastructure and for operating much of its power generation facilities.
The BPDB is responsible for major portion of generation and distribution of electricity mainly in urban areas of the country. The Board is now under the Power Division of the Bangladesh Ministry of Power, Energy and Mineral Resources.
Operations
As on June-2010, in FY 2009-2010, BPDB had a total installed capacity of 5823 MW at 88 units (BPDB 3719 MW at 50 Unit and IPP,SIPP & Rental at 38 units) of Power Plants located at different parts of the country.
The main fuel used for power generation in BPDB plants is indigenous natural gas. BPDP operations also include projects that utilize renewable power sources including offshore wind power generation.[1] A total of 17,079 Gwh gross energy was generated in the public sector power plants operated by BPDB in 2010. In addition, total 11,327 Gwh of energy was purchased by BPDB from Independent Power Producers (IPP, SIPP & Rental) in the private sector.
The maximum demand served during peak hours is 4698.5 MW in August 20, 2010. The transmission network is 8465 ckt km long comprising 230, 132 and 66 KV lines. The total numbers of grid sub-stations are 108 and the total capacity is 16,749 MVA as on June-2010.
In FY 2010-11, BPDB had about 12,516 employees.
See also
Raozan power station,
Nuclear energy in Bangladesh
External Links
Bangladesh Power Development Board website - http://www.bpdb.gov.bd/bpdb/
References
- ^ "Offshore Wind Farm". Retrieved 10 Jul 2012.