Jump to content

Rawang-Sungai Gadut Route: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Shahrein (talk | contribs)
m Shahrein moved page Rawang-Seremban Route to Tanjung Malim-Sungai Gadut: More stations have been added.
Shahrein (talk | contribs)
No edit summary
Line 1: Line 1:
#REDIRECT [[Tanjung Malim-Seremban]]
{{Infobox Rawang-Seremban Line}}

'''Tanjung Malim-Sungai Gadut Route''' is one of the two [[KTM Komuter]] services provided by [[Keretapi Tanah Melayu]]. KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.

==Route==

{|class="wikitable"
!Name
!Type
!Notes
|-
|[[Tanjung Malim Komuter station|Tanjung Malim]]
|[[Island platform|Island]] & [[Side platform|Side]]
|Terminus of the Rawang-Tanjung Malim shuttle.
|-
|[[Kuala Kubu Bharu Komuter station|Kuala Kubu Bharu]]
|[[Side platform|Side]]
|
|-
|[[Rasa Komuter station|Rasa]]
|[[Side platform|Side]]
|
|-
|[[Batang Kali Komuter station|Batang Kali]]
|[[Side platform|Side]]
|
|-
|[[Serendah Komuter station|Serendah]]
|[[Side platform|Side]]
|
|-
|[[Rawang Komuter station|Rawang]]
|[[Island platform|Island]] & [[Side platform|Side]]
|Terminus of the commuter and shuttle route.
|-
|[[Kuang Komuter station|Kuang]]
|[[Side platform|Side]]
|
|-
|[[Sungai Buloh Komuter station|Sungai Buloh]]
|Side
|
|-
|[[Kepong Sentral Komuter station|Kepong Sentral]]
|Side
|
|-
|[[Kepong Komuter station|Kepong]]
|Side
|
|-
|[[Segambut Komuter station|Segambut]]
|Side
|
|-
|[[Putra Komuter station|Putra]]
|Side
|Walking distance to [[RapidKL LRT]]
|-
|[[Bank Negara Komuter station|Bank Negara]]
|Side
|Walking distance to [[RapidKL LRT]]
|-
|[[Kuala Lumpur Railway Station|Kuala Lumpur]]
|Island & Side
|Connection to KTM [[Batu Caves-Port Klang Route]], walking distance to RapidKL LRT.
|-
|[[KL Sentral]]
|Island
|connection to KTM [[Batu Caves-Port Klang Route]], [[RapidKL LRT]], [[KLIA Ekspres]] and [[KLIA Transit]], walking distance to [[KL Monorail]] and [[RapidKL]] and [[Metrobus Nationwide|Metrobus]] hubs.
|-
|[[Mid Valley Komuter station|Mid Valley]]
|Side
|
|-
|[[Seputeh Komuter station|Seputeh]]
|Side
|
|-
|[[Salak Selatan Komuter station|Salak Selatan]]
|Side
|Walking distance to RapidKL LRT
|-
|[[Bandar Tasik Selatan station|Bandar Tasik Selatan]]
|Side
|Connection to RapidKL LRT and [[KLIA Transit]].
|-
|[[Serdang Komuter station|Serdang]]
|Side
|
|-
|[[Kajang station|Kajang]]
|Island & Side
|
|-
|[[UKM Komuter station|UKM]]
|Side
|
|-
|[[Bangi Komuter station|Bangi]]
|Island & Side
|
|-
|[[Batang Benar Komuter station|Batang Benar]]
|Side
|
|-
|[[Nilai Komuter station|Nilai]]
|[[Side platform|Side]]
|
|-
|[[Labu Komuter station|Labu]]
|Side
|
|-
|[[Tiroi Komuter station|Tiroi]]
|[[Side platform|Side]]
|
|-
|[[Seremban station|Seremban]]
|Island & Side
|
|-
|[[Senawang Komuter station|Senawang]]
|Side
|
|-
|[[Sungai Gadut Komuter station|Sungai Gadut]]
|Island
|The only elevated station in KTM Komuter Line.
|}

===Shuttle route===
The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007 under what was formerly known as the Rawang-Rasa shuttle service. The stations are '''[[Serendah Komuter station|Serendah]]''', '''[[Batang Kali Komuter station|Batang Kali]]''', and '''[[Rasa Komuter station|Rasa]]'''. This 22 km stretch is the first portion of the [[Keretapi Tanah Melayu#Modernisation|Rawang-Ipoh double tracking and electrification project]] to become operational. The service was extended to '''[[Kuala Kubu Bharu Komuter station|Kuala Kubu Bharu]]''' on January 5, 2008. It was further extended to '''[[Tanjung Malim Komuter station|Tanjung Malim]]''' on June 1, 2009, and the service is thus renamed as the Rawang-Tanjung Malim shuttle service.

Passengers have to disembark at [[Rawang Komuter station|Rawang]] and take the '''Rawang-Tanjung Malim shuttle service''' for these stations. Service runs at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 25 minutes.

==Route Maps==
*[http://www.spad.gov.my/klang-valley-rail-transit-map/ The official route map, effective 11th May 2012]

==External links==
*[http://www.ktmb.com.my/ Keretapi Tanah Melayu official website]
*[http://www.ktmkomuter.com.my/ KTM Komuter official website]
*[http://www.keretapi.com/ Keretapi.com - Railway Fan website]
*[http://www.ktmrailwayfan.com/ Keretapi Tanah Melayu Railway Fan Club website]

==See also==
*[[Batu Caves-Port Klang Route]]
*[[KTM Komuter]]
*[[Keretapi Tanah Melayu]]
*[[Malaysian Railway System]]

==Gallery==
<gallery>
File:Klsentral.jpg|KTM Komuter section at KL Sentral
File:Seremban railway station (Rawang-Seremban Line) (front), Seremban.jpg|[[Seremban station]]
File:Rawang railway station, Rawang.jpg|[[Rawang station]]
File:Mid Valley station (Rawang-Seremban Line), Kuala Lumpur.jpg|[[Mid Valley Komuter station|Mid Valley Station]]
File:KTM Komuter (Class 81 train interior).jpg|The (modified—with walls cut open and additional handle bars) interior of a Class 81 EMU train.
</gallery>


{{Rail transport in Malaysia}}

[[Category:Rawang-Seremban Line| ]]

[[id:Rute Rawang-Seremban]]
[[ms:Laluan Rawang-Seremban]]

Revision as of 04:31, 9 September 2012

Template:Infobox Rawang-Seremban Line

Tanjung Malim-Sungai Gadut Route is one of the two KTM Komuter services provided by Keretapi Tanah Melayu. KTM Komuter is an electrified commuter train service first introduced in 1995, catering especially to commuters in Kuala Lumpur and the surrounding suburban areas. It is a popular mode of transportation for commuters working in Kuala Lumpur, as they can travel to the city without the hassle of traffic congestion. Coaches are modern and air-conditioned. For those who drive to the stations/halts, 'Park & Ride' facility is provided at a nominal charge.

Route

Name Type Notes
Tanjung Malim Island & Side Terminus of the Rawang-Tanjung Malim shuttle.
Kuala Kubu Bharu Side
Rasa Side
Batang Kali Side
Serendah Side
Rawang Island & Side Terminus of the commuter and shuttle route.
Kuang Side
Sungai Buloh Side
Kepong Sentral Side
Kepong Side
Segambut Side
Putra Side Walking distance to RapidKL LRT
Bank Negara Side Walking distance to RapidKL LRT
Kuala Lumpur Island & Side Connection to KTM Batu Caves-Port Klang Route, walking distance to RapidKL LRT.
KL Sentral Island connection to KTM Batu Caves-Port Klang Route, RapidKL LRT, KLIA Ekspres and KLIA Transit, walking distance to KL Monorail and RapidKL and Metrobus hubs.
Mid Valley Side
Seputeh Side
Salak Selatan Side Walking distance to RapidKL LRT
Bandar Tasik Selatan Side Connection to RapidKL LRT and KLIA Transit.
Serdang Side
Kajang Island & Side
UKM Side
Bangi Island & Side
Batang Benar Side
Nilai Side
Labu Side
Tiroi Side
Seremban Island & Side
Senawang Side
Sungai Gadut Island The only elevated station in KTM Komuter Line.

Shuttle route

The KTM Komuter service was expanded to include three new stations beyond Rawang on April 21, 2007 under what was formerly known as the Rawang-Rasa shuttle service. The stations are Serendah, Batang Kali, and Rasa. This 22 km stretch is the first portion of the Rawang-Ipoh double tracking and electrification project to become operational. The service was extended to Kuala Kubu Bharu on January 5, 2008. It was further extended to Tanjung Malim on June 1, 2009, and the service is thus renamed as the Rawang-Tanjung Malim shuttle service.

Passengers have to disembark at Rawang and take the Rawang-Tanjung Malim shuttle service for these stations. Service runs at 30 minutes interval. The first and last trains to leave Rawang are at 05:42 and 21:24 while the first and last trains leaving Tanjung Malim are at 05:42 and 21:54. Journey time between Rawang and Tanjung Malim is 25 minutes.

Route Maps

See also