Jump to content

Jacksonville and Southwestern Railroad: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
LPBrennan (talk | contribs)
No edit summary
LPBrennan (talk | contribs)
mNo edit summary
Line 1: Line 1:
The '''Jacksonville & Southwestern Railroad''' was built by W. W. Cummer from his sawmill at Milldale, on the [[St. Johns River]] north of the then city limits of [[Jacksonville, Florida]], to access timber lands near [[Newberry, Florida]].<ref>Atlantic Coast Line Railroad, Richard E. Prince, published by Richard E. Prince, Green River, Wyoming, 1974 printing; p.107</ref> Chartered on March 11, 1899,<ref>Poor's Manual of the Railroads of the United States, 1903 Edition, Poor's Railroad Manual Co., New York, N. Y., p. 280</ref> by November 1899 it was complete to Lake Butler, where connection was made with the [[Georgia Southern & Florida Railway]], and the terminus of Newberry was reached a month later. The company was closely held by the Cummer family at first: The original officers were W. W. Cummer of Jacksonville, President; Jacob Cummer, of Cadillac, Michigan, Vice-President; Arthur G. Cummer, Treasurer; and Waldo E. Cummer, Secretary. General manager of construction was George L. Davis<ref>"The Florida Times-Union and Citizen, Jacksonville, Florida; May 1, 1899</ref>. An agreement with the new [[Atlantic, Valdosta and Western Railway|Atlantic, Valdosta & Western Railway]] allowed the use of their line from the junction at [[Grand Crossing, Florida|Grand Crossing]] near the Jacksonville city limits to a station adjacent to the AV&W depot at Catherine and East Bay streets. Excursions were run for Jacksonville's Gala Week in November, regular daily service began a month later. By then the President was James M. Barnett of Grand Rapids; Jacob Cummer as First Vice-President; W. W. Cummer Second Vice-President; Harvey Hollister of Grand Rapids, Michigan, Treasurer; Arthur G. Cummer, Secretary. Waldo E. Cummer was named Superintendent, and George L. Davis remained as Superintendent of construction.<ref>"The Florida Times-Union and Citizen, Jacksonville, Florida; November 11, 1899</ref>
The '''Jacksonville & Southwestern Railroad''' was built by W. W. Cummer from his sawmill at Milldale, on the [[St. Johns River]] north of the then city limits of [[Jacksonville, Florida]], to access timber lands near [[Newberry, Florida]].<ref>Atlantic Coast Line Railroad, Richard E. Prince, published by Richard E. Prince, Green River, Wyoming, 1974 printing; p.107</ref> Chartered on March 11, 1899,<ref>Poor's Manual of the Railroads of the United States, 1903 Edition, Poor's Railroad Manual Co., New York, N. Y., p. 280</ref> by November 1899 it was complete to Lake Butler, where connection was made with the [[Georgia Southern & Florida Railway]], and the terminus of Newberry was reached a month later. The company was closely held by the Cummer family at first: The original officers were W. W. Cummer of Jacksonville, President; Jacob Cummer, of Cadillac, Michigan, Vice-President; Arthur G. Cummer, Treasurer; and Waldo E. Cummer, Secretary. General manager of construction was George L. Davis.<ref>"The Florida Times-Union and Citizen, Jacksonville, Florida; May 1, 1899</ref> An agreement with the new [[Atlantic, Valdosta and Western Railway|Atlantic, Valdosta & Western Railway]] allowed the use of their line from the junction at [[Grand Crossing, Florida|Grand Crossing]] near the Jacksonville city limits to a station adjacent to the AV&W depot at Catherine and East Bay streets. Excursions were run for Jacksonville's Gala Week in November, regular daily service began a month later. By then the President was James M. Barnett of Grand Rapids; Jacob Cummer as First Vice-President; W. W. Cummer Second Vice-President; Harvey Hollister of Grand Rapids, Michigan, Treasurer; Arthur G. Cummer, Secretary. Waldo E. Cummer was named Superintendent, and George L. Davis remained as Superintendent of construction.<ref>"The Florida Times-Union and Citizen, Jacksonville, Florida; November 11, 1899</ref>


The road operated a round trip daily, leaving Newberry around 6 a.m. and arriving in Jacksonville four and a half hours later; the return left around 5 p.m. for a late evening arrival in Newberry. A close connection was made with GS&F trains at Lake Butler and package cars ran through via Lake Butler to [[Lake City, Florida|Lake City]] and [[Gainesville, Florida|Gainesville]].<ref>"The Florida Times-Union, Jacksonville, Florida; Timetable published January 5, 1903</ref> The J&SW had many connections: In addition to the AV&W and the GS&F, it connected with the [[Florida Central and Peninsular Railroad|Florida Central & Peninsular Railroad]] at Jacksonville, Baldwin and Deep Creek Junction; the [[Plant System]]'s Savannah, Florida & Western Railway at Grand Crossing; and the [[Atlantic, Suwannee River & Gulf Railway]] at [[La Crosse, Florida|La Crosse]].
The road operated a round trip daily, leaving Newberry around 6 a.m. and arriving in Jacksonville four and a half hours later; the return left around 5 p.m. for a late evening arrival in Newberry. A close connection was made with GS&F trains at Lake Butler and package cars ran through via Lake Butler to [[Lake City, Florida|Lake City]] and [[Gainesville, Florida|Gainesville]].<ref>"The Florida Times-Union, Jacksonville, Florida; Timetable published January 5, 1903</ref> The J&SW had many connections: In addition to the AV&W and the GS&F, it connected with the [[Florida Central and Peninsular Railroad|Florida Central & Peninsular Railroad]] at Jacksonville, Baldwin and Deep Creek Junction; the [[Plant System]]'s Savannah, Florida & Western Railway at Grand Crossing; and the [[Atlantic, Suwannee River & Gulf Railway]] at [[La Crosse, Florida|La Crosse]].

Revision as of 21:27, 17 November 2012

The Jacksonville & Southwestern Railroad was built by W. W. Cummer from his sawmill at Milldale, on the St. Johns River north of the then city limits of Jacksonville, Florida, to access timber lands near Newberry, Florida.[1] Chartered on March 11, 1899,[2] by November 1899 it was complete to Lake Butler, where connection was made with the Georgia Southern & Florida Railway, and the terminus of Newberry was reached a month later. The company was closely held by the Cummer family at first: The original officers were W. W. Cummer of Jacksonville, President; Jacob Cummer, of Cadillac, Michigan, Vice-President; Arthur G. Cummer, Treasurer; and Waldo E. Cummer, Secretary. General manager of construction was George L. Davis.[3] An agreement with the new Atlantic, Valdosta & Western Railway allowed the use of their line from the junction at Grand Crossing near the Jacksonville city limits to a station adjacent to the AV&W depot at Catherine and East Bay streets. Excursions were run for Jacksonville's Gala Week in November, regular daily service began a month later. By then the President was James M. Barnett of Grand Rapids; Jacob Cummer as First Vice-President; W. W. Cummer Second Vice-President; Harvey Hollister of Grand Rapids, Michigan, Treasurer; Arthur G. Cummer, Secretary. Waldo E. Cummer was named Superintendent, and George L. Davis remained as Superintendent of construction.[4]

The road operated a round trip daily, leaving Newberry around 6 a.m. and arriving in Jacksonville four and a half hours later; the return left around 5 p.m. for a late evening arrival in Newberry. A close connection was made with GS&F trains at Lake Butler and package cars ran through via Lake Butler to Lake City and Gainesville.[5] The J&SW had many connections: In addition to the AV&W and the GS&F, it connected with the Florida Central & Peninsular Railroad at Jacksonville, Baldwin and Deep Creek Junction; the Plant System's Savannah, Florida & Western Railway at Grand Crossing; and the Atlantic, Suwannee River & Gulf Railway at La Crosse.

The J&SW was built primarily to serve the Cummer mills, and though it crossed some valuable phosphate lands, the Cummers did little to develop that traffic. On July 1, 1903, C. W. Chase, President of the H. F. Dutton & Co., a Gainesville-based phosphate mining company, bought the J&SW and became its President. E. S. Spencer, the road's traffic manager, was named General Manager.[6] Within a month Chase announced that construction was to begin on a large phosphate port at Milldale. The road was extended a few miles west of Newberry to reach the Dutton mine. [7]

The Atlantic Coast Line expressed interest in the J&SW, and bought the road outright as soon as the Florida Railroad Commission approved the purchase on July 28, 1904.[8] The daily train continued to use the Catherine Street station for several months before being switched over to the Jacksonville Terminal on West Bay Street. The ACL extended the new line south and west; eventually it became the West Coast Route for trains to St. Petersburg from Jacksonville. Passenger service ended on May 1, 1971, with the advent of Amtrak, and most of the line was abandoned in 1972. In 1993, CSX sold 14 miles between Imeson Road (about three miles west of Grand Crossing) and Florida State Road 121 near Baldwin to the Florida Department of Natural Resources for the Rails-to-Trails program.[9]

  1. ^ Atlantic Coast Line Railroad, Richard E. Prince, published by Richard E. Prince, Green River, Wyoming, 1974 printing; p.107
  2. ^ Poor's Manual of the Railroads of the United States, 1903 Edition, Poor's Railroad Manual Co., New York, N. Y., p. 280
  3. ^ "The Florida Times-Union and Citizen, Jacksonville, Florida; May 1, 1899
  4. ^ "The Florida Times-Union and Citizen, Jacksonville, Florida; November 11, 1899
  5. ^ "The Florida Times-Union, Jacksonville, Florida; Timetable published January 5, 1903
  6. ^ "The Florida Times-Union, Jacksonville, Florida; July 5, 1903
  7. ^ "The Florida Times-Union, Jacksonville, Florida; July 30, 1903
  8. ^ "The Florida Times-Union, Jacksonville, Florida; July 29, 1904
  9. ^ "The Florida Times-Union, Jacksonville, Florida; March 1, 1993

;