Jump to content

EG LNG: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
{{coord missing}}
cat. added
Line 53: Line 53:


[[Category:Oil and gas companies of Equatorial Guinea]]
[[Category:Oil and gas companies of Equatorial Guinea]]
[[Category:Energy infrastructure in Equatorial Guinea]]
[[Category:Liquefied natural gas plants]]
[[Category:Liquefied natural gas plants]]
[[Category:Bioko]]
[[Category:Bioko]]

Revision as of 09:22, 30 December 2012

CGI view of the plant

EG LNG (also known as Punta Europa LNG) is a LNG company that operates a liquid natural gas terminal and plant in Malabo, Bioko Island, Equatorial Guinea. The LNG plant began operation in 2007 and the first cargo of LNG was delivered on 24 May 2007.[1]

LNG plant

The plant's Train 1 has a capacity of 3.4 million metric tonnes per annum. Several systems are in places such as feed gas metering, liquefaction, refrigeration, ethylene storage, boil off gas compression, product transfer to storage and LNG product metering.[2] The EG LNG plant utilizes the ConocoPhillips Optimized Cascade(SM) Process.[3]

EG LNG from the air

A planned second train will produce 4.4 million metric tonnes of LNG per annum. In addition to the construction of the second train, the US$3 billion project includes construction of three gas pipelines to connect Nigeria, Cameroon and Equatorial Guinea gas fields with the LNG plant. In addition to the shareholders of the Train 1, Unión Fenosa Gas, a joint venture of Unión Fenosa and Eni, and E.ON will participate in this project.[4]

Shareholders

The shareholders in EG LNG Co are:

References

  1. ^ "EG LNG Completes Delivery of First LNG Cargo from Train 1 Plant in Equatorial Guinea" (Press release). Marubeni Corporation. 2007-05-25. Retrieved 2007-07-11.
  2. ^ a b "Marathon and partners award front end engineering and design contract for train 2 LNG project in Equatorial Guinea". Scandinavian Oil-Gas Magazine. 2006-08-24. Retrieved 2007-07-11.
  3. ^ a b "Marathon, Partners Make Early LNG Delivery from Bioko Island". Rigzone. 2007-05-24. Retrieved 2007-07-11.
  4. ^ "Fenosa, E.ON To Build Second LNG Train in Gulf of Guinea". Downstream Today. 2008-02-22. Retrieved 2008-02-23.