Emergency disconnect package: Difference between revisions
Magioladitis (talk | contribs) m Fix section names per WP:EXTLINKS + general fixes using AWB (8548) |
MisterUnit (talk | contribs) m Adding link to orphaned article, Wikiproject Orphanage: You can help! |
||
Line 7: | Line 7: | ||
''The Emergency Disconnect Package'' (EDP) is designed for an emergency |
''The Emergency Disconnect Package'' (EDP) is designed for an emergency |
||
allowing the completion/intervention vessel(also known as a [[well intervention]] vessel to disconnect from the subsea well while under load with a high disconnection angle.The EDP is used within what is called a workover system. A workover system is basically a series of valves and high strength pipe connecting a floating drilling rig to the subsea Christmas tree. |
allowing the completion/intervention vessel(also known as a [[well intervention]] vessel to disconnect from the subsea well while under load with a high disconnection angle.The EDP is used within what is called a workover system. A workover system is basically a series of valves and high strength pipe connecting a floating drilling rig to the subsea Christmas tree. |
||
The EDP disconnects from the [[lower riser package]], and isolates the riser from the environment.The EDP consists of a connector to the lower riser package,an isolation valve, [[Accumulator (energy)|accumulator]], a subsea control module and a connection point at the top for connection to the riser pipe. |
The EDP disconnects from the [[lower riser package]], and isolates the riser from the environment.The EDP consists of a connector to the lower riser package,an [[isolation valve]], [[Accumulator (energy)|accumulator]], a subsea control module and a connection point at the top for connection to the riser pipe. |
||
A production retainer valve shuts in the riser and the annulus master |
A production retainer valve shuts in the riser and the annulus master |
||
valve shuts in the riser. A crossover valve allows circulation of the riser |
valve shuts in the riser. A crossover valve allows circulation of the riser |
Revision as of 17:53, 5 February 2013
This article has multiple issues. Please help improve it or discuss these issues on the talk page. (Learn how and when to remove these messages)
|
The Emergency Disconnect Package (EDP) is designed for an emergency allowing the completion/intervention vessel(also known as a well intervention vessel to disconnect from the subsea well while under load with a high disconnection angle.The EDP is used within what is called a workover system. A workover system is basically a series of valves and high strength pipe connecting a floating drilling rig to the subsea Christmas tree. The EDP disconnects from the lower riser package, and isolates the riser from the environment.The EDP consists of a connector to the lower riser package,an isolation valve, accumulator, a subsea control module and a connection point at the top for connection to the riser pipe. A production retainer valve shuts in the riser and the annulus master valve shuts in the riser. A crossover valve allows circulation of the riser after disconnection.A Heavy Completion / Intervention System includes Lower Riser Package, Emergency Disconnect Package, riser joints, specialty riser joints, tensioner system and surface tree.
External links