Jump to content

Delivering Security in a Changing World: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Clue (talk | contribs)
mNo edit summary
Clue (talk | contribs)
m helicopter wiki link
Line 21: Line 21:
**Current [[BAe Nimrod|Nimrod MR.2]] maritime patrol aircraft fleet to be reduced from 21 to 16.
**Current [[BAe Nimrod|Nimrod MR.2]] maritime patrol aircraft fleet to be reduced from 21 to 16.
**Reduction in purchase of remanufactured Nimrod MRA.4s from 18 to 12 aircraft.
**Reduction in purchase of remanufactured Nimrod MRA.4s from 18 to 12 aircraft.
**Reduction of 6 [[Westland Puma|Puma]] helicopters of [[No. 230 Squadron RAF]] based in Northern Ireland.
**Reduction of 6 [[Westland Puma|Puma]] [[helicopter]]s of [[No. 230 Squadron RAF]] based in Northern Ireland.
**Reduction of [[RAF Tornado F3|Tornado F3]] force by one squadron (16 aircraft) in preparation for replacement with Typhoon.
**Reduction of [[RAF Tornado F3|Tornado F3]] force by one squadron (16 aircraft) in preparation for replacement with Typhoon.
**Reduction in [[Rapier missile]] launchers from 48 to 24 and transfer to Army control and the disbandment of four [[RAF Regiment]] Squadrons which operated Rapier.
**Reduction in [[Rapier missile]] launchers from 48 to 24 and transfer to Army control and the disbandment of four [[RAF Regiment]] Squadrons which operated Rapier.

Revision as of 23:26, 4 September 2004

The 2003 Defence White Paper, entitled Delivering Security in a Changing World sets out the future of the British military , and builds on the 1998 Strategic Defence Review (SDR) and the 2002 SDR New Chapter which responded to the challenges raised by the War on Terror.

Key points

Most of the reforms listed below were announced as part of the Delivering Security in a Changing World: Future Capabilites review, published on July 21 2004.

The review also mentioned "significant" classified enhancements of British special forces, including strength increases and investment in new equipment.

Financially, in a Treasury spending review announced the week before, the budget would rise by 3.7bn pounds, from £29.7bn in 2004/2005 to £33.4bn in 2007/2008. The review also mentions £3bn to be invested into procuring new helicopters over the next ten years.

See also