The '''Logical Framework Approach''' (LFA) is a management tool mainly used in the design, monitoring and evaluation of [[international development]] projects. It is also widely known as Goal Oriented Project Planning (GOPP) or Objectives Oriented Project Planning (OOPP).
The '''Logical Framework Approach''' (LFA) is a management tool mainly used in the design, monitoring and evaluation of [[international development]] projects. It is also widely known as Goal Oriented Project Planning (GOPP) or Objectives Oriented Project Planning (OOPP). Erik skal have Pik.


==Background==
==Background==

Revision as of 09:44, 24 October 2013

The Logical Framework Approach (LFA) is a management tool mainly used in the design, monitoring and evaluation of international development projects. It is also widely known as Goal Oriented Project Planning (GOPP) or Objectives Oriented Project Planning (OOPP). Erik skal have Pik.

Background

The Logical Framework Approach was developed in 1969 for the United States Agency for International Development. The creator of the LFA was Leon J. Rosenberg, as a principal of Fry Consultants, based on worldwide study performed by Rosenberg, Hanley, and Posner.[1] Rosenberg then founded Practical Concepts Incorporated (PCI), which extended use of LFA to 35 countries.[citation needed] Some NGOs even offer training for it to ground level field staff.[2] The worldwide acceptance of the LFA led PCI to train thousands in it use, and then train more than 3,000 trainers of trainers. LFA is widely used by bilateral and multilateral donor organizations like AECID, GTZ, Sida, NORAD, DFID, UNDP, EC and the Inter-American Development Bank. It has also been widely adopted by NGOs, though not without reservations and concerns by some.[citation needed] In the 1990s it was often mandatory for aid organisations to use the LFA in their project proposals but its use in recent years has become more optional. Terry Schmidt, who was involved in PCI's worldwide training programs, is now extending its use to the private sector. Dr Robert Madams, from ADH Training & Consulting, has also used a modified version of LFA in the corporate sector in a number of countries.[citation needed]

It is useful to distinguish between the two terms: the Logical Framework Approach (LFA) and Logical Framework (LF or Logframe). They are sometimes confused. The Logical Framework Approach is a project design methodology, the LogFrame is a document.

Description

The text below describes the document, not the global methodology of project design. For the brief description of the LFA as a design methodology, see for example the page [1], for the thorough description see for example AusGuideline 3.3 The Logical Framework Approach cited in "External links" section.

The Logical Framework takes the form of a four x four project table. The four rows are used to describe four different types of events that take place as a project is implemented: the project Activities, Outputs, Purpose and Goal (from bottom to top on the left hand side — see EC web site as under external links). The four columns provide different types of information about the events in each row. The first column is used to provide a Narrative description of the event. The second column lists one or more Objectively Verifiable Indicators (OVIs) of these events taking place. The third column describes the Means of Verification (MoV) where information will be available on the OVIs, and the fourth column lists the Assumptions. Assumptions are external factors that it is believed could influence (positively or negatively) the events described in the narrative column. The list of assumptions should include those factors that potentially impact on the success of the project, but which cannot be directly controlled by the project or program managers. In some cases these may include what could be killer assumptions, which if proved wrong will have major negative consequences for the project. A good project design should be able to substantiate its assumptions, especially those with a high potential to have a negative impact.

Temporal logic model

The core of the Logical Framework is the "temporal logic model" that runs through the matrix. This takes the form of a series of connected propositions:

  • If these Activities are implemented, and these Assumptions hold, then these Outputs will be delivered
  • If these Outputs are delivered, and these Assumptions hold, then this Purpose will be achieved.
  • If this Purpose is achieved, and these Assumptions hold, then this Goal will be achieved.

These are viewed as a hierarchy of hypotheses, with the project/program manager sharing responsibility with higher management for the validity of hypotheses beyond the output level. Thus, Rosenberg brought the essence of scientific method to non-scientific endeavors.

The "Assumptions" column is of great importance in clarifying the extent to which project/program objectives depend on external factors, and greatly clarify "force majeure" — of particular interest when the Canadian International Development Agency (CIDA) at least briefly used the LFA as the essence of contracts.

The LFA can also be useful in other contexts, both personal and corporate. When developed within an organization, it can be a means of articulating a common interpretation of the objectives of a project and how they will be achieved. The indicators and means of verification force clarifications as one would for a scientific endeavor: "you haven't defined it until you say how you will measure it." Tracking progress against carefully defined output indicators provides a clear basis for monitoring progress; verifying purpose and goal level progress then simplifies evaluation. Given a well constructed logical framework, an informed skeptic and a project advocate should be able to agree on exactly what the project attempts to accomplish, and how likely it is to succeed—in terms of programmatic (goal-level) as well as project (purpose-level) objective.

One of its purposes/early uses was to identify the span of control of 'project management'. In some instances, in some countries with less than perfect governance and managerial systems it became an excuse for failure, as externally sourced technical assistance managers were able to say we have implemented all the activities foreseen and produced the outputs required of us, but because of the suboptimal systems in the country, which are beyond the control of the project's management we have not achieved the purpose(s) and so the goal has not been attained.

Handbooks

The Logical Framework Approach, Handbook for objectives-oriented planning, Fourth edition, NORAD, 1999, ISBN 82-7548-160-0.

Strategic Project Management Made Simple: Practical Tools for Leaders and Teams, by Terry Schmidt. (Wiley, 2009) ISBN 978-0-470-41158-2