Gantt chart: Difference between revisions
Appearance
Content deleted Content added
m ganttproject |
→External links: Flash demo (cool!) |
||
Line 17: | Line 17: | ||
==External links== |
==External links== |
||
* [http://ganttproject.sourceforge.net/ ganttproject], [[open source]] software for planning projects using Gantt charts |
* [http://ganttproject.sourceforge.net/ ganttproject], [[open source]] software for planning projects using Gantt charts,<br/> |
||
: and a [http://ganttproject.sourceforge.net/demo/demo.html flash demo] showing the construction of a Gantt chart with ganttproject. |
|||
{{msg:stub}} |
{{msg:stub}} |
Revision as of 22:14, 8 September 2004
A Gantt chart is a popular type of bar chart, showing the interrelationships of how projects, schedules, and other time related systems progress over time.
In project management, a Gantt chart can show when the project terminal elements start end finish, summary elements (shown) or terminal element dependencies (not shown).
It was developed by Henry L. Gantt by 1910 (see "Work, Wages and Profit" by H. L. Gantt, published by The Engineering Magazine, NY, 1910).
Gantt charts appear in several project management software packages, such as Microsoft Project or Mr. Project.