Jump to content

Vijaydurg Port: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
New topic added
m Reference links added
Line 40: Line 40:


== Construction of a new Minor Port ==
== Construction of a new Minor Port ==
[[Maharashtra Maritime Board]] has proposed the construction of a modern and all weather port at [[Vijaydurg (city)|Vijaydurg]] in [[Sindhudurg]] District, [[Maharashtra]]. The estimated investment in the project is Rs. 5000.0 Million (USD 100.0 million).<ref>[http://www.fdi.net/documents/WorldBank/databases/india/port.pdf Ports and Shipping, Maharashtra Maritime Board]</ref>
[[Maharashtra Maritime Board]] has proposed the construction of a modern and all weather port at [[Vijaydurg (city)|Vijaydurg]] in [[Sindhudurg]] District, [[Maharashtra]]. The estimated investment in the project is Rs. 5000.0 Million (USD 100.0 million).<ref name=":4">[http://www.fdi.net/documents/WorldBank/databases/india/port.pdf Ports and Shipping, Maharashtra Maritime Board]</ref>


=== Project Description ===
=== Project Description ===
[[Maharashtra]] has a long coastline which could be effectively developed for carrying out inland water transport for goods and passengers. [[Maharashtra Maritime Board]] has identified development of a minor port at [[Vijaydurg (city)|Vijaydurg]] in [[Sindhudurg]] District. The proposed port will be located at southern portion of Burmana bay near the mouth of Wagothane River. As per a study carried out by Consulting Engineering Services (CES), the traffic projections are in the region of 2.0 mtpa and 2.5 mtpa for the years 2005 and 2010 respectively. The traffic composition will be of general cargo with or without containers.<ref>[http://www.researchgate.net/publication/27668722_Marine_archaeological_exploration_and_excavation_of_Vijaydurg_-_A_naval_base_of_the_Maratha_Period_Maharashtra_on_the_west_coast_of_India Research Article - National Institute of Oceanography]</ref>
[[Maharashtra]] has a long coastline which could be effectively developed for carrying out inland water transport for goods and passengers. [[Maharashtra Maritime Board]] has identified development of a minor port at [[Vijaydurg (city)|Vijaydurg]] in [[Sindhudurg]] District. The proposed port will be located at southern portion of Burmana bay near the mouth of Wagothane River.<ref name=":5" /> As per a study carried out by Consulting Engineering Services (CES), the traffic projections are in the region of 2.0 mtpa and 2.5 mtpa for the years 2005 and 2010 respectively. The traffic composition will be of general cargo with or without containers.<ref name=":4" /><ref name=":5" />


{| class="wikitable"
{| class="wikitable"
Line 63: Line 63:


=== Project Benefits ===
=== Project Benefits ===
* To facilitate inland movement of cargo and passengers.
* To facilitate inland movement of cargo and passengers.<ref name=":4" />


=== Status of government clearances needed for successful implementation of the project ===
=== Status of government clearances needed for successful implementation of the project ===
Line 77: Line 77:


=== Location ===
=== Location ===
The site lies in [[Sindhudurg]] district at about 60 km from Kokisare Railway station and 55 km from [[NH-17]]. Presently, there is one jetty (51m* 6.6 m) with maximum permissible draft of 3.0 m. Bore logs available indicate soft clay for a depth of 3 to 6 m below sea bed at proposed harbour basin and channel, which is unerlain by moderate to completely weathered basalt layer and hard rock.
The site lies in [[Sindhudurg]] district at about 60 km from Kokisare Railway station and 55 km from [[NH-17]]. Presently, there is one jetty (51m* 6.6 m) with maximum permissible draft of 3.0 m.<ref name=":6">[http://www.researchgate.net/publication/27668722_Marine_archaeological_exploration_and_excavation_of_Vijaydurg_-_A_naval_base_of_the_Maratha_Period_Maharashtra_on_the_west_coast_of_India Research Article - National Institute of Oceanography]</ref> Bore logs available indicate soft clay for a depth of 3 to 6 m below sea bed at proposed harbour basin and channel, which is unerlain by moderate to completely weathered basalt layer and hard rock.<ref name=":4" /><ref name=":6" />


=== Proposed implementation plan ===
=== Proposed implementation plan ===
The project implementation schedule begins with selection of the agency (Licensee) which will under take construction of facilities on “Build, Own, Operate & Transfer” basis. The licensee will have to complete the survey of the project site, carry out detailed soil & other investigations followed by detailed engineering, selection of agencies to construct the port before commencing construction.<ref>[http://www.deloitte.com/assets/dcom-india/local%20assets/documents/ainfrastructure%20in%20maharashtra.pdf Deloitte - A background paper on Infrastructure in Maharashtra]</ref> Considering the variety & volume of work involved in creation of the Port, it is suggested that total works be divided into several packages for execution as indicated below:
The project implementation schedule begins with selection of the agency (Licensee) which will under take construction of facilities on “Build, Own, Operate & Transfer” basis.<ref name=":4" /> The licensee will have to complete the survey of the project site, carry out detailed soil & other investigations followed by detailed engineering, selection of agencies to construct the port before commencing construction.<ref name=":5">[http://www.deloitte.com/assets/dcom-india/local%20assets/documents/ainfrastructure%20in%20maharashtra.pdf Deloitte - A background paper on Infrastructure in Maharashtra]</ref> Considering the variety & volume of work involved in creation of the Port, it is suggested that total works be divided into several packages for execution as indicated below:
* Breakwater
* Breakwater
* Jetties
* Jetties
Line 88: Line 88:
* Roads
* Roads
The construction, repair, maintenance and management of the port will be the sole responsibility
The construction, repair, maintenance and management of the port will be the sole responsibility
of the developer
of the developer.<ref name=":4" />


== Gallery ==
== Gallery ==

Revision as of 18:34, 5 October 2014

Vijaydurg Port

Vijaydurg Port is a natural harbour on the west coast of the district of Sindhudurg in Maharashtra, India. The port is situated midway between Malvan and Ratnagiri at the mouth of the Vijaydurg creek in Devgad taluka. Its coastal jurisdiction extends 10 kms north up to the Jaitapur lighthouse. Goods weighing about 200 tons are generally loaded or unloaded at the port daily. The cargo brought by sea is transported by creek up to Kharepatan which is 26 miles up from Vijayadurg.[1]

Administration

The controlling authority of this port is "Assistant Range Officer".[1]

Commodities

The chief commodities imported in this port are food-stuffs, pulses, salt, oil-cakes, sugar, cement and dry fish. The chief commodities exported from this port are; mangoes, jungle-wood, hemp, bamboos and cocunuts.[1]

Food and related products as well as general merchandise are imported from Mumbai, salt from Mora and Karanja, tiles from Mangalore and salted fish from Malvan and Karwar. Mangoes, wood and salted fish are sent to Mumbai.[1]

Trade

The average turn-over of import and export at the port during 1953-58 was about 25,000 tons and about 25,000 passengers travel through the port every year.[2] An old anchor (length 13m, breadth 8m and road circumference 2m), belonging to the Maratha Navy was found lying in water near the port for over hundred years and still in good condition. It was moved to the Maritime Museum, Mumbai, from the port at the request of Captain J. R. Davis, Nautical Adviser to the Government of India, on 5th February 1956.[2]

Ferries

The region surrounding Vijaydurg Port has a good network of rivers and rivulets. There are lots of interruptions to road traffic due to absence of bridges over the numerous rivers, rivulets and creeks. Many ferries ply only after monsoon as the swelling waters begin to recede as the month of October advances.[3] The ferries ply between Vijaydurg and Kharepatan which is 40 kms towards the eastern side of Waghotan River.

Almost all the ferries are country crafts manned by two or three ferrymen. Small boats called Hodis ply across rivers and rivulets. The sailing vessels plying across creeks are called machwas. A hodi can accommodate four persons, while a machwa can carry up to fifty persons.[3]

The statistics regarding the number of passengers embarked and disembarked at this port for six years (1951 to 1957) are given in the table below:[1]

Year 1951-52 1952-53 1953-54 1954-55 1955-56 1956-57
Embarking 22,900 25,373 23,258 27,538 20,728 28,505
Disembarking 23,731 24,693 23,532 25,428 25,051 27,507

Konkan Steamer Service

File:Konkan Sevak.jpeg
Konkan Sevak
File:Konkan Shakti.jpeg
Konkan Shakti

Until 1983, Vijaydurg was a port of call for the Konkan Steamer service, which ran two ships: Konkan Sevak and Konkan Shakti, which were later sent to supply the IPKF (Indian Peace Keeping Forces) in Sri Lanka in the late eighties on the behest of late Prime Minister of India, Rajiv Gandhi.[4] In the past, a few operators like Damania did launch catamaran services, but they never really took off. The smaller catamarans that replaced them in the mid-nineties were described as "soulless" by many a traveller. 'The sea route on board the catamarans could never be a pleasant experience for the passengers due to the heavy rolling and pitching effects of the sea throughout the entire journey,' states the proposal passed by the state government.[5]

Relaunch of Mumbai-Goa Liner

Twenty-two years after its last voyage the Mumbai-Goa steamer service will set sail once again, with Goa Chief Minister Manohar Parrikar and his Maharashtra counterpart Prithviraj Chauhan keen on relaunching the service.[5]

A proposal to restart the service was made by the Goa Government in the last week of May, and was promptly seconded by the Maharashtra Government. "It has been cleared and the service will be launched in the next three months," Captain of Ports, Goa, James Braganza.[5] The service will be purely an alternative mode of transport between Mumbai and Goa, minus any frills, but comfortable. As earlier, the service is expected to operate between Ferry Wharf (Bhaucha Dhakka) in Mazgaon and Panaji port. En route it will halt at Raigad, Ratnagiri, Jaigad, Vijaydurg, Malvan and Vengurla, where smaller boats will ferry passengers to the shore. There is much scope for a daily steamer services on the route, as trains invariably run full and buses are not preferred by many.[5]

Construction of a new Minor Port

Maharashtra Maritime Board has proposed the construction of a modern and all weather port at Vijaydurg in Sindhudurg District, Maharashtra. The estimated investment in the project is Rs. 5000.0 Million (USD 100.0 million).[6]

Project Description

Maharashtra has a long coastline which could be effectively developed for carrying out inland water transport for goods and passengers. Maharashtra Maritime Board has identified development of a minor port at Vijaydurg in Sindhudurg District. The proposed port will be located at southern portion of Burmana bay near the mouth of Wagothane River.[7] As per a study carried out by Consulting Engineering Services (CES), the traffic projections are in the region of 2.0 mtpa and 2.5 mtpa for the years 2005 and 2010 respectively. The traffic composition will be of general cargo with or without containers.[6][7]

Operating Agency Maharashtra Maritime Board

Address : 3rd Floor, 14, Ramjibhai Ballard Estate, Mumbai-400 001 Tel : 091- 022- 2612143 Fax : 091- 022- 2614331 E mail : ceommb@bom3.vsnl.net.in Contact person : Chief Executive Officer

Gestation Period The project will be completed in a period of 3 to 5 years.
Revenue Generation The project is expected to earn revenues by way of port operations.
Status of the Project Planning stage.

Project Benefits

  • To facilitate inland movement of cargo and passengers.[6]

Status of government clearances needed for successful implementation of the project

No. List of the clearances needed Status
1. Environmental clearance To be obtained by the entrepreneur
2. Availability of land for the project Will be provided by GOM on lease by charging a nominal lease rental.

Location

The site lies in Sindhudurg district at about 60 km from Kokisare Railway station and 55 km from NH-17. Presently, there is one jetty (51m* 6.6 m) with maximum permissible draft of 3.0 m.[8] Bore logs available indicate soft clay for a depth of 3 to 6 m below sea bed at proposed harbour basin and channel, which is unerlain by moderate to completely weathered basalt layer and hard rock.[6][8]

Proposed implementation plan

The project implementation schedule begins with selection of the agency (Licensee) which will under take construction of facilities on “Build, Own, Operate & Transfer” basis.[6] The licensee will have to complete the survey of the project site, carry out detailed soil & other investigations followed by detailed engineering, selection of agencies to construct the port before commencing construction.[7] Considering the variety & volume of work involved in creation of the Port, it is suggested that total works be divided into several packages for execution as indicated below:

  • Breakwater
  • Jetties
  • Dredging
  • Tugs & navigational Aids
  • Electrical Facilities
  • Roads

The construction, repair, maintenance and management of the port will be the sole responsibility of the developer.[6]

See also

Reference