* 120,000 Man hours worked by Kokosing Construction without a lost-time accident
* 120,000 hours worked by Kokosing Construction without a lost-time accident
* 57,000 Square feet Crew Kicker Plaza
* 57,000 ft² (5,300 m²) Crew Kicker Plaza
* 40,000 Square feet of steel siding
* 40,000 ft² (3,700 m²) of steel siding
* 25,134 Seats
* 25,134 seats
* 14,000 Lineal feet of handrail (over 10 miles)
* 14,000 feet (4.3 km) of handrail
* 9,800 Parking spaces (800 paved, 9000 grass)
* 9,800 parking spaces (800 paved, 9000 grass)
* 8,625 Square feet of playing surface (75 yds by 115 yds) to accommodate any [[FIFA]] event
* 8,625 ft² (800 m²) of playing surface, 75 by 115 yd (69 m by 105 m) to accommodate any [[FIFA]] event
* 1,400 Tons of galvanized structural steel used for construction
* 1,400 tons of galvanized structural steel used for construction
* 562 Concrete bleacher support columns
* 562 concrete bleacher support columns
* 384 Square foot video board
* 384 ft² (36 m²) video board
* 288 Bathroom stalls
* 288 bathroom stalls
* 274 Days from groundbreaking to inaugural game (9 months, 1 day)
* 274 days from groundbreaking to inaugural game (9 months, 1 day)
* 193 Sinks
* 193 sinks
* 169 Foot light poles (4)
* 169 ft (52 m) light poles (4)
* 140 Doors
* 140 doors
* 84 Foot wide concrete soccer ball (Crew Kicker Plaza)
* 84 ft (26 m) wide concrete soccer ball (Crew Kicker Plaza)
* 62 Urinals*
* 62 urinals*
* 54 Individual 2,000-Watt bulbs per light pole
* 54 individual 2 kW bulbs per light pole
* 48 Feet tall at the highest point
* 48 ft (15 m) tall at the highest point
* 34 Sponsor panels
* 34 sponsor panels
* 32 Feet of scrolling matrix board
* 32 ft (10 m) of scrolling matrix board
* 30 Open-air Club Loges
* 30 open-air Club Loges
* 26 Shower heads
* 26 shower heads
* 22 Miles of wiring
* 22 miles (35 km) of wiring
* 19 Inch wide bleacher seats
* 19 inch (480 mm) wide bleacher seats
* 15 Acre site
* 15 acre (61,000 m²) site
* 13 Sports-themed arcade games
* 13 sports-themed arcade games
* 6 Sets of restrooms
* 6 sets of restrooms
* 3 Glacial rocks used for decor
* 3 glacial rocks used for decor
* 2 Automated Teller Machines
* 2 automated teller machines
* 1 1/4 Inch Tall Four-Blend Kentucky Bluegrass
* 1 1/4 inch (32 mm) tall Four-Blend Kentucky Bluegrass
* 1 Tenant - [[Columbus Crew]]
* 1 tenant - [[Columbus Crew]]


[[American football|football]]
[[American football|football]]

Revision as of 11:54, 22 July 2004

Columbus Crew Stadium seats 22,500 (expanded 30,000), was built with private funds, and is located on the Ohio state fairgrounds. The stadium opened May 15, 1999 with a match against the New England Revolution. It was the first stadium in the United States designed specifically to host major league soccer. The stadium has hosted the MLS All-Star Game in 2001 and the league championship in 2001, NCAA Soccer Final Four, US national soccer team matches, and 2003 Women’s World Cup. It has also hosted games for the Ohio High School State Championship tournaments in both football and soccer.

Date Built: 1999
Ownership: The Hunt family
Capacity: 22,500 (expanded 30,000)
Surface: Grass
Cost of Construction: $25 Million
Address: 1 Black And Gold Boulevard, Columbus, Ohio 43211
Tenant: Columbus Crew
Parking: 9,800


The numbers for Columbus Crew Stadium:

  • 120,000 hours worked by Kokosing Construction without a lost-time accident
  • 57,000 ft² (5,300 m²) Crew Kicker Plaza
  • 40,000 ft² (3,700 m²) of steel siding
  • 25,134 seats
  • 14,000 feet (4.3 km) of handrail
  • 9,800 parking spaces (800 paved, 9000 grass)
  • 8,625 ft² (800 m²) of playing surface, 75 by 115 yd (69 m by 105 m) to accommodate any FIFA event
  • 1,400 tons of galvanized structural steel used for construction
  • 562 concrete bleacher support columns
  • 384 ft² (36 m²) video board
  • 288 bathroom stalls
  • 274 days from groundbreaking to inaugural game (9 months, 1 day)
  • 193 sinks
  • 169 ft (52 m) light poles (4)
  • 140 doors
  • 84 ft (26 m) wide concrete soccer ball (Crew Kicker Plaza)
  • 62 urinals*
  • 54 individual 2 kW bulbs per light pole
  • 48 ft (15 m) tall at the highest point
  • 34 sponsor panels
  • 32 ft (10 m) of scrolling matrix board
  • 30 open-air Club Loges
  • 26 shower heads
  • 22 miles (35 km) of wiring
  • 19 inch (480 mm) wide bleacher seats
  • 15 acre (61,000 m²) site
  • 13 sports-themed arcade games
  • 6 sets of restrooms
  • 3 glacial rocks used for decor
  • 2 automated teller machines
  • 1 1/4 inch (32 mm) tall Four-Blend Kentucky Bluegrass
  • 1 tenant - Columbus Crew

football