Construction was completed and the line opened for traffic by July 1906.<ref>HAER PA-531, Data Pages, p. 3</ref>
Construction was completed and the line opened for traffic by July 1906.<ref>HAER PA-531, Data Pages, p. 3</ref>


When combined with the railroad's [[Trenton Cutoff]] and Philadelphia & Thorndale Branch, the new line permitted the PRR to operate a low-grade bypass between [[Morrisville, Bucks County, Pennsylvania|Morrisville, Pennsylvania]] (just south of [[Trenton, New Jersey]]) and [[Harrisburg]]. This allowed freight trains to avoid the congestion of the [[East Coast of the United States|eastern seaboard]] and the steep grades of the Main Line, <ref>Except for a {{Convert|10|mi|adj=on}} section between [[Thorndale, Pennsylvania|Thorndale]] and [[Parkesburg, Pennsylvania|Parkesburg]] where freight and passenger traffic shared the four-track main line.</ref>
When combined with the railroad's [[Trenton Cutoff]] and Philadelphia & Thorndale Branch, the new line permitted the PRR to operate a low-grade bypass between [[Morrisville, Bucks County, Pennsylvania|Morrisville, Pennsylvania]] (just south of [[Trenton, New Jersey]]) and [[Harrisburg]]. This allowed freight trains to avoid the congestion of the [[East Coast of the United States|eastern seaboard]] and the steep grades of the Main Line.<ref>Except for a {{Convert|10|mi|adj=on}} section between [[Thorndale, Pennsylvania|Thorndale]] and [[Parkesburg, Pennsylvania|Parkesburg]] where freight and passenger traffic shared the four-track main line.</ref>


The line flourished with freight traffic until the decline of northeast railroads and overall reduction in traffic made the line redundant. The line survived PRR's short-lived successor [[Penn Central]] (1968-76) until the era of [[Conrail]] (1976-89). Conrail
The line flourished with freight traffic until the decline of northeast railroads and overall reduction in traffic made the line redundant. The line survived PRR's short-lived successor [[Penn Central]] (1968-76) until the era of [[Conrail]] (1976-89). Conrail
Line 25: Line 25:
The Pennsylvania Railroad catenary supports remain, operated by Amtrak under [[easement]], to supply electricity from [[Safe Harbor Dam]] to the Parkesburg traction substation. Ironically, while they were one of the last parts of the line to be installed (c. 1938), they are the only remaining structure supporting railroad operations.
The Pennsylvania Railroad catenary supports remain, operated by Amtrak under [[easement]], to supply electricity from [[Safe Harbor Dam]] to the Parkesburg traction substation. Ironically, while they were one of the last parts of the line to be installed (c. 1938), they are the only remaining structure supporting railroad operations.


Since the right-of-way was transferred to the respective townships, about {{convert|13|mi|km}} of the line has been opened to the public.<ref>Traillink.com, April 2010</ref> Amtrak plans to upgrade the surface to a crushed-stone trail concurrently with its transmission line replacement project. The Safe Harbor ({{Coord|39.9253|-76.3844|name=Safe Harbor Trestle}}) and Martic Forge ({{Coord|39.9079|-76.3283|name=Martic Forge Trestle}}) trestles remain closed.
Since the right-of-way was transferred to the respective townships, about {{convert|29|mi|km}} of the line has been opened to the public in disconnected segments.<ref>{{cite web |url=http://www.traillink.com/trail/enola-low-grade-trail.aspx |title=Enola Low Grade Trail |author=<!--Staff writer(s); no by-line.--> |date= |website=TrailLink |publisher=Rails-to-Trails Conservancy |access-date=2015-03-14}}</ref> Amtrak plans to upgrade the surface to a crushed-stone trail concurrently with its transmission line replacement project. The Safe Harbor ({{Coord|39.9253|-76.3844|name=Safe Harbor Trestle}}) and Martic Forge ({{Coord|39.9079|-76.3283|name=Martic Forge Trestle}}) trestles remain closed.


==Notes==
==Notes==
Line 32: Line 32:
==References==
==References==
{{Refbegin}}
{{Refbegin}}
* "Pennsylvania Railroad, Safe Harbor Bridge, Spanning mouth of Conestoga River, Safe Harbor, Lancaster, PA ", ''Historic American Engineering Record'', Library of Congress Call Number [http://www.loc.gov/pictures/item/PA3741/ HAER PA,36-SAHAR,1-].
* HAER PA-531. "Pennsylvania Railroad, Safe Harbor Bridge, Spanning mouth of Conestoga River, Safe Harbor, Lancaster, PA ", ''Historic American Engineering Record'', Library of Congress Call Number [http://www.loc.gov/pictures/item/PA3741/ HAER PA,36-SAHAR,1-].
* [http://www.bullsheet.com/news/atglensusq.html ''Trail Planned for Former PRR Atglen & Susquehanna Branch''] (2005)
* {{cite web |url=http://www.bullsheet.com/200503.html |title=Trail Planned for Former PRR Atglen & Susquehanna Branch |last1=Brougham |first1=Allen |date=March 2005 |website=Bullsheet.com |publisher= |access-date=2015-03-14}}
* [http://www.traillink.com/trail/enola-low-grade-trail-%28formerely-atglen-susquehanna-trail%29.aspx Enola Low Grade Trail]{{deadlink|date=July 2012}}
* AbandonedRails.com. [http://www.abandonedrails.com/Atglen_and_Susquehanna_Branch "The Atglen and Susquehanna Branch"]
* AbandonedRails.com. [http://www.abandonedrails.com/Atglen_and_Susquehanna_Branch "The Atglen and Susquehanna Branch"]
*{{cite news |last= Crable|first= Ad|date= 2013-08-20|title= Manor Township rail-trail worth the wait|url= http://lancasteronline.com/news/manor-township-rail-trail-worth-the-wait/article_762968a7-1c8f-5ac8-941c-004093c57fd4.html|newspaper= Lancaster New Era|location= Lancaster, PA|access-date= 2015-03-14}}
*{{cite news |last= Crable|first= Ad|date= 2013-08-20|title= Manor Township rail-trail worth the wait|url= http://lancasteronline.com/news/manor-township-rail-trail-worth-the-wait/article_762968a7-1c8f-5ac8-941c-004093c57fd4.html|newspaper= Lancaster New Era|location= Lancaster, PA|access-date= 2015-03-14}}

Revision as of 04:06, 15 March 2015

The Atglen and Susquehanna Branch crosses the Conestoga River on the upper span of this bridge, located at the Safe Harbor Dam, PA.
Map of the A&S Branch in 1911

The Atglen and Susquehanna Branch is an abandoned branch line of the Pennsylvania Railroad. The line ran from Lemoyne to Atglen, Pennsylvania.

History

The Atglen and Susquehanna (A&S) Branch was built by the Pennsylvania Railroad (PRR) between 1902 and 1906. The branch was built to relieve congestion on the Philadelphia to Harrisburg Main Line and the railroad's Columbia & Port Deposit (C&PD) line. It was designed for freight service, and minimizing the grade profile was of high importance, since freight service on the main line was hampered by relatively steep grade profiles. Thus the branch was often known simply as the "Low Grade."

During construction of the A&S Branch, the existing C&PD stone bridge at the Conestoga River washed out. Rather than rebuild, the C&PD bridge was combined with the A&S bridge to form a unique two-line, two-level steel viaduct known as the Safe Harbor Trestle. This bridge at the Conestoga carried the C&PD line over the river, while the A&S ran parallel and approximately 100 feet (30 m) above.

Construction was completed and the line opened for traffic by July 1906.[1]

When combined with the railroad's Trenton Cutoff and Philadelphia & Thorndale Branch, the new line permitted the PRR to operate a low-grade bypass between Morrisville, Pennsylvania (just south of Trenton, New Jersey) and Harrisburg. This allowed freight trains to avoid the congestion of the eastern seaboard and the steep grades of the Main Line.[2]

The line flourished with freight traffic until the decline of northeast railroads and overall reduction in traffic made the line redundant. The line survived PRR's short-lived successor Penn Central (1968-76) until the era of Conrail (1976-89). Conrail downgraded the line, first removing the overhead catenary, then by rerouting traffic over the former Reading Company's line from Harrisburg to northern New Jersey. The last train on the line ran in 1988. Conrail petitioned the Interstate Commerce Commission to abandon the line in 1989 and track was removed around 1990.

Although trackage was dismantled prior to the 1999 breakup of Conrail by the Norfolk Southern Railway (NS) and CSX Transportation, the right-of-way had been retained due to disputes over the historical nature of the line's bridges, and passed to NS. A group called Friends of the Atglen-Susquehanna Trail had prepared to establish the line as a rail trail, but this plan was opposed by local township residents and ultimately failed. NS eventually sold the line to the seven townships through which it passes[3] in July 2008. NS received $1 from each of the townships, although it also supplied the townships with a total of $1.4 million for bridge removal or repair.

Amtrak, which received ownership of PRR's electric traction system, continues to operate the two 138 kV transmission lines that run along the A&S right-of-way. The transmission lines, utilizing the distinctive PRR catenary poles, were replaced with typical utility-style monopoles in 2012.[4]

Modern day

Currently, the right-of-way stands under heavy brush. The loose track ballast remains, although the ties have been removed, and the surface is rough.

The Pennsylvania Railroad catenary supports remain, operated by Amtrak under easement, to supply electricity from Safe Harbor Dam to the Parkesburg traction substation. Ironically, while they were one of the last parts of the line to be installed (c. 1938), they are the only remaining structure supporting railroad operations.

Since the right-of-way was transferred to the respective townships, about 29 miles (47 km) of the line has been opened to the public in disconnected segments.[5] Amtrak plans to upgrade the surface to a crushed-stone trail concurrently with its transmission line replacement project. The Safe Harbor (39°55′31″N 76°23′04″W / 39.9253°N 76.3844°W / 39.9253; -76.3844 (Safe Harbor Trestle)) and Martic Forge (39°54′28″N 76°19′42″W / 39.9079°N 76.3283°W / 39.9079; -76.3283 (Martic Forge Trestle)) trestles remain closed.

Notes

  1. ^ HAER PA-531, Data Pages, p. 3
  2. ^ Except for a 10-mile (16 km) section between Thorndale and Parkesburg where freight and passenger traffic shared the four-track main line.
  3. ^ Bart, Conestoga, Eden, Martic, Providence, Sadsbury, and West Sadsbury
  4. ^ Amtrak, Chicago, IL (2010-04-28). "Amtrak is Working on the Railroad in 2010: $1 billion construction program funds projects to improve reliability, safety and security." Press release no. ATK-10-062.
  5. ^ "Enola Low Grade Trail". TrailLink. Rails-to-Trails Conservancy. Retrieved 2015-03-14.

References