Central Spine Road: Difference between revisions
DH85868993 (talk | contribs) fix text alignment |
m Disambiguating links to Karak (link changed to Karak, Pahang) using DisamAssist. |
||
Line 13: | Line 13: | ||
| direction_b = South |
| direction_b = South |
||
| terminus_b = [[Simpang Pelangai]], [[Pahang]] |
| terminus_b = [[Simpang Pelangai]], [[Pahang]] |
||
| destinations= [[Gua Musang]]<br>[[Sungai Yu]]<br>[[Chegar Perah]]<br>[[Kampung Relong]]<br>[[Kuala Lipis]]<br>[[Raub]]<br>[[Bentong]]<br>[[Karak]] |
| destinations= [[Gua Musang]]<br>[[Sungai Yu]]<br>[[Chegar Perah]]<br>[[Kampung Relong]]<br>[[Kuala Lipis]]<br>[[Raub]]<br>[[Bentong]]<br>[[Karak, Pahang|Karak]] |
||
|header_type=under construction |
|header_type=under construction |
||
}} |
}} |
Revision as of 22:10, 25 May 2015
This article needs additional citations for verification. (September 2014) |
Federal Route 8 and 9 | |
---|---|
Central Spine Road | |
Route information | |
Length | 325 km (202 mi) |
Major junctions | |
North end | Kuala Krai, Kelantan |
East Coast Expressway FT 2 AH141 Kuala Lumpur-Karak Expressway FT 2 Federal Route 2 FT 185 Simpang Pulai-Kuala Berang Highway | |
South end | Simpang Pelangai, Pahang |
Location | |
Country | Malaysia |
Primary destinations | Gua Musang Sungai Yu Chegar Perah Kampung Relong Kuala Lipis Raub Bentong Karak |
Highway system | |
Central Spine Road, Federal Routes FT 8 and FT 9 is a new highway under construction in the central of Peninsula Malaysia, Malaysia. It is a toll-free highway. The 325 km (201 miles) highway replaces the former 2-lane FT 8 Gua Musang Highway and FT 9 Karak-Tampin highway. The construction first starts on Package 3 which is from Merapoh to Kampung Relong. The reason why it starts there first because the FT 8 Gua Musang Highway passes through Chegar Perah which is prone to roadkill. The highway had a long eco-viaduct built there. The next package that is to be built next will be Package 5 which is from the northern Raub till Karak which will connect it to the East Coast Expressway Karak Highway bypassing Bentong & Mempaga. This will also avoid the steep mountainous grade between Raub & Bentong.
Route background
This section is empty. You can help by adding to it. (June 2011) |
Features
- The highway featured four lanes, two on each side.[1]
- A long Eco-Viaduct for wild animals crossing
Notable features
At most section, the Federal Route—was built under the JKR R5 road standard, allowing maximum speed limit of up to 90 km/h.
Overlaps
Kampung Sungai Yu - Chegar Perah & Chegar Perah - Bukit Tujuh : FT 8 Merapoh Highway
Alternate routes
Sections with motorcycle lanes
None
List of Interchanges
Km | Exit | Interchange | To | Remarks | |
---|---|---|---|---|---|
KUALA KRAI | |||||
FT 8 CENTRAL SPINE ROAD Package 1 Start/End of highway Under construction
| |||||
FT 8 CENTRAL SPINE ROAD Package 1 Under construction
| |||||
Sungai Lakit Bridge | |||||
FT 8 CENTRAL SPINE ROAD Package 2 Under construction
| |||||
FT 8 CENTRAL SPINE ROAD Package 2 Under construction
| |||||
GUA MUSANG | |||||
FT 8 CENTRAL SPINE ROAD Package 3 Under construction
| |||||
Mentara | |||||
Kelantan Darul Naim Gua Musang district border
| |||||
Kelantan-Pahang border
| |||||
Pahang Darul Makmur Lipis district border
| |||||
FT 8 CENTRAL SPINE ROAD Under construction
| |||||
FT 8 CENTRAL SPINE ROAD Package 3 (Gua Musang-Kampung Relong) Section 3F JKR border limit | |||||
KUBANG RUSA INTERCHANGE | FT 8 MERAPOH HIGHWAY WEST Kampung Kubang Rusa Merapoh Gua Musang Kuala Krai Kota Bharu FT 185 SIMPANG PULAI-KUALA BERANG HIGHWAY Cameron Highland Ipoh Tasik Kenyir Kuala Terengganu EAST Kampung Sungai Yu Pusat Rekreasi Sungai Yu |
Parclo B-2 interchange | |||
SUNGAI YU ECO VIADUCT Eco-Viaduct
| |||||
SUNGAI YU INTERCHANGE | FT 8 MERAPOH HIGHWAY WEST Kampung Sungai Yu Pusat Rekreasi Sungai Yu Merapoh |
Trumpet interchange | |||
Chegar Perah | FT 8 MERAPOH HIGHWAY WEST Chegar Perah |
LILO Kuala Krai bound | |||
Chegar Perah | FT 8 MERAPOH HIGHWAY WEST Chegar Perah |
LILO Kuala Krai bound | |||
U-Turn | FT 8 CENTRAL SPINE ROAD U-TURN Chegar Perah Sungai Yu Kubang Rusa Mentara Gua Musang Kuala Krai Kota Bharu |
U-Turn south bound Under Construction | |||
FT 8 CENTRAL SPINE ROAD Package 3 (Gua Musang-Kampung Relong) Section 3F JKR border limit | |||||
FT 8 CENTRAL SPINE ROAD Under construction
| |||||
FELDA Telang | |||||
Kampung Kechur | |||||
Kampung Relong | |||||
FT 8 CENTRAL SPINE ROAD Package 3 Under construction
| |||||
FT 8 CENTRAL SPINE ROAD Package 4 Under construction
| |||||
Lipis-Raub district border
| |||||
FT 8 CENTRAL SPINE ROAD Package 5 Under construction
| |||||
RAUB | |||||
Raub-Bentong district border
| |||||
BENTONG INTERCHANGE | FT 8 FEDERAL ROUTE 8 Bentong Bukit Fraser |
Trumpet interchange Under construction | |||
MEMPAGA INTERCHANGE | Mempaga | Trumpet interchange Under construction | |||
FT 8 CENTRAL SPINE ROAD Package 5 Under construction
| |||||
KARAK HIGHWAY INTERCHANGE | East Coast Expressway AH141 KUALA LUMPUR-KARAK HIGHWAY WEST Kuala Lumpur Genting Highlands EAST Gambang Kuantan Kuala Terengganu |
Interchange Under construction | |||
FT 9 CENTRAL SPINE ROAD Under construction
| |||||
Kampung Telemong | |||||
Mancis | |||||
FT 9 CENTRAL SPINE ROAD Start/End of highway Under construction
| |||||
SIMPANG PELANGAI | NORTHWEST FT 9 Karak FT 9 Mancis SOUTHEAST FT 9 Kuala Klawang FT 9 Kuala Pilah FT 51 Seremban |
T-junctions |