Jump to content

Massachusetts Route 24: Difference between revisions

Route map:
From Wikipedia, the free encyclopedia
Content deleted Content added
m Reverted last 3 edits. -- No reference provided.
Added text to Exit List indicating MassDOT project to change exit numbers to those based on mileposts starting in 2016 and added External Link section with link to MassDOT proposed future exit numbers. Revised section on possible upgrade to interstate.
Line 42: Line 42:
The original portion of Route 24 opened in 1951, and brought commuters from Exit 10 in Assonet to [[Raynham, Massachusetts|Raynham]]. Route 24 is currently 40 miles (65 km) in length and has 21 interchanges from Fall River to Randolph.
The original portion of Route 24 opened in 1951, and brought commuters from Exit 10 in Assonet to [[Raynham, Massachusetts|Raynham]]. Route 24 is currently 40 miles (65 km) in length and has 21 interchanges from Fall River to Randolph.


==Possible upgrades to Interstate standards==
==Efforts to upgrade to Interstate standards==
There have been calls over the years for Route 24 to be upgraded to an interstate highway. In April 2007 the Old Colony Regional Planning Council included this proposal in its 25-year regional transportation plan draft. The Southeastern Regional Planning and Economic Development District (SRPEDD) endorsed a similar proposal the month before. In 1997, a study was initiated by the Massachusetts Highway Department (MHD) and the SRPEDD on what improvements were necessary in order to convert the route to an Interstate highway. The project would require major upgrades to 11 interchanges and minor work on 6 others. The proposal was tabled due to high costs projected for reconstruction of part of the highway south of [[Interstate 495 (Massachusetts)|Interstate 495]]. The current proposal seeks to have the route improved to interstate standards by 2020; the cost for the Stoughton to Bridgewater portion alone is estimated at $224 million.{{Fact|date=February 2008}}
There have been calls over the years for Route 24 to be upgraded to an interstate highway. In 1997, a study was initiated by the Massachusetts Highway Department (MHD) and the SRPEDD on what improvements were necessary in order to convert the route to an Interstate highway. The project would require major upgrades to 11 interchanges and minor work on 6 others, and the plan was halted due to high costs. In April 2007 the Old Colony Regional Planning Council included this proposal in its 25-year regional transportation plan draft. The Southeastern Regional Planning and Economic Development District (SRPEDD) endorsed a similar proposal the month before which if built, according to a MassHighway official, would have been signed as an extension of [[I-93 (MA)|I-93]]. The portion south of [[I-195 (MA)|I-195]] would have remained MA-24 and then RI-24.<ref>{{cite web |url=http://cacademy.info/alevitt/MHD.doc |title=personal correspondence |format=Microsoft Word DOC |first=Steve |last=Timmins |publisher=Mass Highway}}</ref> This proposal too was eventually tabled due to high costs projected for reconstruction of part of the highway south of [[Interstate 495 (Massachusetts)|Interstate 495]], the cost for the Stoughton to Bridgewater portion alone was estimated at $224 million. There are currently no proposals in the MassDOT highway listings to upgrade MA 24 to an interstate.{{Fact|date=January 2016}}


According to MassHighway, it will be an extension of [[I-93 (MA)|I-93]]. The portion south of [[I-195 (MA)|I-195]] will remain MA-24 and then RI-24. There is no word on the designation of I-93/[[US-1]] between exits 1 and 4.<ref>{{cite web |url=http://cacademy.info/alevitt/MHD.doc |title=personal correspondence |format=Microsoft Word DOC |first=Steve |last=Timmins |publisher=Mass Highway}}</ref>


The state is expected to begin work in 2015. The US 44 bridge will be replaced, and two other bridges will be widened.
The state is expected to begin work in 2015. The US 44 bridge will be replaced, and two other bridges will be widened.
Line 66: Line 65:


==Exit list==
==Exit list==
All interchanges will be renumbered to mileage-based numbers under a project scheduled to start in 2016.<ref name="Exit Numbers">{{cite web|author=Commonwealth of Massachusetts|year=2015|title=COMMBUYS - Bid Solicitation FAP# HSIP-002S(874) Exit Signage Conversion to Milepost-Based Numbering System along Various Interstates, Routes and the Lowell Connector |url=https://www.commbuys.com/bso/external/bidDetail.sdo?docId=BD-16-1030-0H100-0H002-00000005477&external=true&parentUrl=bid|accessdate=January 6, 2016}}</ref>
{{jcttop|exit|state=MA|length_ref=<ref name="MA Route Log">{{cite web|url=http://services.massdot.state.ma.us/mrla/RouteSelection.htm|title=Massachusetts Route Log Application|author=MassDOT Planning Division|date=|website=|publisher=Massachusetts Department of Transportation|accessdate=January 27, 2015}}</ref>|location_ref=<ref name="MA Route Log" />|exit_ref=<ref name="MassDOT Exit List MA-24">{{cite web|author=Massachusetts Department of Transportation|year=|title=Exit Numbers and Names: Route 24 (Fall River to Randolph)|url=http://www.mhd.state.ma.us/default.asp?pgid=../common/highways/ExitListI24&sid=ExitDetails|publisher=|accessdate=January 27, 2015}}</ref>|dest_ref=<ref name="MassDOT Exit List MA-24" />}}
{{jcttop|exit|state=MA|length_ref=<ref name="MA Route Log">{{cite web|url=http://services.massdot.state.ma.us/mrla/RouteSelection.htm|title=Massachusetts Route Log Application|author=MassDOT Planning Division|date=|website=|publisher=Massachusetts Department of Transportation|accessdate=January 27, 2015}}</ref>|location_ref=<ref name="MA Route Log" />|exit_ref=<ref name="MassDOT Exit List MA-24">{{cite web|author=Massachusetts Department of Transportation|year=|title=Exit Numbers and Names: Route 24 (Fall River to Randolph)|url=http://www.mhd.state.ma.us/default.asp?pgid=../common/highways/ExitListI24&sid=ExitDetails|publisher=|accessdate=January 27, 2015}}</ref>|dest_ref=<ref name="MassDOT Exit List MA-24" />}}
{{MAint|exit
{{MAint|exit
Line 243: Line 243:
{{refend}}
{{refend}}


==External Links==

*[http://www.gribblenation.net/mass21/ma24exits.html MA 24 Current and Future Exit Numbers List]


{{DEFAULTSORT:Massachusetts Route 024}}
{{DEFAULTSORT:Massachusetts Route 024}}

Revision as of 17:16, 6 January 2016

Route 24 marker
Route 24
AMVETS Memorial Highway
Fall River Expressway
Route information
Maintained by MassDOT
Length40.91 mi[1] (65.84 km)
Existed1951–present
Major junctions
South end Route 24 in Tiverton, RI
Major intersections
North end I-93 / US 1 in Randolph
Location
CountryUnited States
StateMassachusetts
CountiesBristol, Plymouth, Norfolk
Highway system
Route 23 Route 25
View of Route 24 from Stafford Road overpass, Fall River, Massachusetts

Route 24 is a freeway south of I-93 in southeastern Massachusetts, linking Fall River with the Boston metropolitan area. It begins in the south in Fall River at the border with Tiverton, Rhode Island where it connects with Rhode Island Route 24, and runs north to an interchange with Interstate 93/U.S. Route 1 in Randolph. Route 24 is also known as the Fall River Expressway, and officially as the Amvets Highway. Route 24 has a total of 21 interchanges (including the split at its northern terminus with Interstate 93.)

Route 24 connects many of the major cities of Southeastern Massachusetts with Boston: Brockton, Taunton, Fall River, and New Bedford (via the junction with Route 140).

Route description

The highway continues at the Rhode Island border at Rhode Island Route 24 and meets Interstate 195 in Fall River. It briefly runs concurrently with I-195 east (for less than a mile), then exits the interstate and travels north, merging with Route 79 at Exit 7 in northern Fall River. Routes 24 and 79 run concurrently northward until Exit 9 (Assonet). At this point, Route 79 exits the freeway and heads northeast. Route 24 continues north, intersecting the northern end of the Taunton-New Bedford Expressway (Route 140) in Taunton, and Interstate 495 in Raynham. The highway continues north through the city of Brockton and into Randolph, where Route 24 ends at a split junction with Interstate 93. This section of I-93 from Braintree to its junction with I-95 is frequently referred to by its former designation of Route 128. This designation was removed from I-93 in 1989, when the roadway obtained the additional designation of U.S. Route 1, although this is not shown on exit signs from Route 24. The route is officially 40.9 miles in length, however, mileposts continue up to 41.2 on the Exit 21B ramp to I-93 south.

The speed limit on Route 24 is 55 mph (89 km/h) from the Rhode Island border to the exit from Interstate 195. North of I-195, the speed limit is 65 mph (105 km/h).

Service plazas are located on either side of Route 24 in Bridgewater.

History

Route 24, along with Route 138, are both built parallel to an old Indian trail that went along the same north/south route from south of the Boston area into Boston. Route 124 on Cape Cod was originally designated Route 24 before 1951, and its number was changed to 124 upon the completion of the initial stretch of the Route 24 freeway.

The original portion of Route 24 opened in 1951, and brought commuters from Exit 10 in Assonet to Raynham. Route 24 is currently 40 miles (65 km) in length and has 21 interchanges from Fall River to Randolph.

Efforts to upgrade to Interstate standards

There have been calls over the years for Route 24 to be upgraded to an interstate highway. In 1997, a study was initiated by the Massachusetts Highway Department (MHD) and the SRPEDD on what improvements were necessary in order to convert the route to an Interstate highway. The project would require major upgrades to 11 interchanges and minor work on 6 others, and the plan was halted due to high costs. In April 2007 the Old Colony Regional Planning Council included this proposal in its 25-year regional transportation plan draft. The Southeastern Regional Planning and Economic Development District (SRPEDD) endorsed a similar proposal the month before which if built, according to a MassHighway official, would have been signed as an extension of I-93. The portion south of I-195 would have remained MA-24 and then RI-24.[2] This proposal too was eventually tabled due to high costs projected for reconstruction of part of the highway south of Interstate 495, the cost for the Stoughton to Bridgewater portion alone was estimated at $224 million. There are currently no proposals in the MassDOT highway listings to upgrade MA 24 to an interstate.[citation needed]


The state is expected to begin work in 2015. The US 44 bridge will be replaced, and two other bridges will be widened.

This is an early estimate of the project of the highway widening and Interstate upgrade project. They are not final.

- Phase I: Randolph I-93 Interchange Reconstruction ($30 million)

- Phase II: Randolph to Stoughton ($56 million)

- Phase III: Canton to Bridgewater ($224 million)

- Phase IV: Bridgewater to I-495 ($175 million)

- Phase V: I-495 to US 44 ($35 million)

- Phase VI: US 44 to Fall River ($357 million)

Total cost is expected to be $877 million, which makes the entire project more expensive than the still-ongoing Route 128 Add-a-lane project, or the US 3 Add-a-lane project northwest of Boston to the New Hampshire state line, itself completed in 2005.

Exit list

All interchanges will be renumbered to mileage-based numbers under a project scheduled to start in 2016.[3]

CountyLocation[4]mi[4]kmExit[5]Destinations[5]Notes
BristolFall River0.0000.000
Route 24 south – Tiverton RI, Newport RI[6]
Continuation from Rhode Island
0.2130.3431 Route 81 – Adamsville RI, Fall RiverSigned as Exits 1A (south) and 1B (north)
1.7112.7542Brayton Avenue / Eastern Avenue
1.8923.0453
I-195 west – Providence RI
Left exit; southern end of concurrency with I-195
3.2285.1954
I-195 east – New Bedford
Left exit southbound; northern end of concurrency with I-195
5.4348.7455 US 6 (President Avenue / Eastern Avenue)
7.72612.4346Highland AvenueSouthbound exit and northbound entrance
7.94312.7837
Route 79 south – North Fall River, Somerset
Southbound exit and northbound entrance; southern end of concurrency with Route 79
8.33113.4078AAirport Road / North Main Street
Freetown9.615.48BInnovation Way – Fall River, FreetownFormerly Executive Park Drive; opened in January 2012
11.26518.1299
Route 79 north – Freetown, Middleboro
Northern end of concurrency with Route 79
12.59420.26810North Main Street – Assonet, Dighton
Berkley15.72925.31311Padelford Street – Berkley, Dighton
Taunton17.39527.99512 Route 140 – Lakeville, Taunton, New BedfordSigned as Exits 12A (south) and 12B (north) northbound
Raynham19.87131.97913 US 44 – Middleboro, TauntonSigned as Exits 13A (east) and 13B (west)
PlymouthBridgewater22.86436.79614A
I-495 south – Cape Cod
Exits 7A-B on I-495
22.91736.88114B
I-495 north – Worcester
23.638.0Service Area
24.28239.07815 Route 104 – Bridgewater, Raynham
West Bridgewater27.84944.81916 Route 106 – West Bridgewater, MansfieldSigned as Exits 16A (east) and 16B (west)
Brockton31.24950.29017 Route 123 – Brockton, EastonSigned as Exits 17A (east) and 17B (west)
33.47753.87618 Route 27 – Brockton, StoughtonSigned as Exits 18A (south) and 18B (north)
NorfolkAvon35.66857.40219AHarrison Boulevard
19BCentral Street
Stoughton37.89560.98620 Route 139 – Randolph, StoughtonSigned as Exits 20A (east) and 20B (west)
Randolph40.80365.66621A
I-93 / US 1 north – Boston
Northern terminus; Exit 4 on I-93 / US 1.
21B

I-93 / US 1 south to I-95
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

KML is from Wikidata
  1. ^ "Office of Transportation Planning - 2005 Road Inventory". Executive Office of Transportation. 2005.
  2. ^ Timmins, Steve. "personal correspondence" (Microsoft Word DOC). Mass Highway.
  3. ^ Commonwealth of Massachusetts (2015). "COMMBUYS - Bid Solicitation FAP# HSIP-002S(874) Exit Signage Conversion to Milepost-Based Numbering System along Various Interstates, Routes and the Lowell Connector". Retrieved January 6, 2016.
  4. ^ a b MassDOT Planning Division. "Massachusetts Route Log Application". Massachusetts Department of Transportation. Retrieved January 27, 2015.
  5. ^ a b Massachusetts Department of Transportation. "Exit Numbers and Names: Route 24 (Fall River to Randolph)". Retrieved January 27, 2015.
  6. ^ Google Maps (October 2012). "Street View". Google. Retrieved January 27, 2015. {{cite web}}: |author= has generic name (help)