Jump to content

Interstate 540 (North Carolina): Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
540/640 removed - see discussion
Nutmegger (talk | contribs)
future infrastructure
Line 1: Line 1:
{{future infrastructure|sortkey}}

{{Routeboxint|
{{Routeboxint|
article_route = 540|
article_route = 540|
Line 127: Line 129:
[[category:Interstate Highways in North Carolina|40-5]]
[[category:Interstate Highways in North Carolina|40-5]]
[[Category:The Triangle, North Carolina]]
[[Category:The Triangle, North Carolina]]
[[Category:Future infrastructure]]

Revision as of 20:48, 17 August 2006

Template:Future infrastructure

Template:Routeboxint Interstate 540 (abbreviated I-540) is the modern perimeter loop of Raleigh, North Carolina. The road is several miles further from downtown Raleigh than Interstate 440, the Cliff Benson Beltline. Known formally as the Northern Wake Expressway, the "Outer Loop" presently runs 16 miles (26 km) from I-40 near Raleigh-Durham International Airport around the northern part of Raleigh to U.S. Route 1 (Capital Boulevard) northeast of Raleigh.

When finished, the loop will total over 50 miles in length; as of 2005, only about one quarter of the project has been completed and is open to traffic. As of November 2005, sections from US 1 to US 64 in Knightdale, North Carolina (Knightdale Bypass) in the east and from I-40 to NC 54 and NC 55 in the west are under construction. While work on the western section may be completed in 2006, NCDOT just announced that the work on the eastern portion will not be completed now until 2007. Work on the southern portion of the beltway has yet to begin, and the final segments may not open until 2030. At the request of several Wake County mayors, the North Carolina Turnpike Authority will study the use of tolls to complete I-540, potentially completing the project as early as 2012.

Exit list

This exit list encompasses both the completed portions of I-540 and any portions of the interstate which are currently under construction.

Exit Road(s) intersected Destination(s) Notes
? File:NC 54 Shield.PNG North Carolina State Highway 54 Under construction. Exit numbers for these interchanges unknown at this time.
? File:NC 55 Shield.PNG North Carolina State Highway 55
1 File:Interstate 40.svg Interstate 40 Raleigh, Durham Westbound only - End of freeway, all traffic exit at 1A.
Split into exits 1A (I-40 East) and 1B (I-40 West)
2 Aviation Parkway RDU Airport
3 Lumley Rd North Cargo, General Aviation (RDU Airport) Westbound entrance closed until August 12th due to guardrail repairs.[1]
4 U.S. Route 70 Raleigh, Durham Split into exits 4A (US 70 East) and 4B (US 70 West)
7 Leesville Road
9 File:NC 50 Shield.PNG North Carolina State Highway 50 Raleigh, Creedmoor
11 Six Forks Road North Carolina State Highway 98, Wake Forest Highway SR 1005
14 Falls of the Neuse Road SR 2000
16 U.S. Route 1

Capital Blvd

Raleigh, Wake Forest Eastbound only
17 Triangle Town Blvd Eastbound only - End of freeway, all traffic exit
19 U.S. Route 401 Rolesville Under construction
21 Buffaloe Rd Under construction
?
U.S. Route 64 Business

Knightdale Blvd

Knightdale Under construction
24 U.S. Route 64 Bypass
U.S. Route 264
Knightdale Bypass
Raleigh, Knightdale Under construction

References