Jump to content

Faridabad–Noida–Ghaziabad Expressway: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
mNo edit summary
Line 5: Line 5:


==Length==
==Length==
FNG Expressway is around 56&nbsp;km long with 19.9&nbsp;km in [[Noida]]-[[Greater Noida]] region, 8&nbsp;km in [[Ghaziabad, Uttar Pradesh|Ghaziabad]], while the remaining 28.1&nbsp;km is in the Faridabad region, especially the developing sectors of [[Neharpar]]. According to the plan, FNG from Noida side will become operational in the next 14 months while it would take three years for the whole stretch to become fully operational<ref>http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=CAP/2014/04/12&PageLabel=57&EntityId=Ar05700&ViewMode=HTML</ref>
FNG Expressway is around 56&nbsp;km long with 20 &nbsp;km in [[Noida]]-[[Greater Noida]] region, 8&nbsp;km in [[Ghaziabad, Uttar Pradesh|Ghaziabad]], while the remaining 28.1&nbsp;km is in the Faridabad region, especially the developing sectors of [[Neharpar]]. According to the plan, FNG from Noida side will become operational in the next 14 months while it would take three years for the whole stretch to become fully operational<ref>http://epaper.timesofindia.com/Default/Scripting/ArticleWin.asp?From=Archive&Source=Page&Skin=TOINEW&BaseHref=CAP/2014/04/12&PageLabel=57&EntityId=Ar05700&ViewMode=HTML</ref>


==Design==
==Design==

Revision as of 08:19, 17 October 2016

Faridabad-Noida-Ghaziabad Expressway or FNG Expressway is planned to be a part of Eastern Peripheral Expressway which is also called National Expressway 2 or KGP (Kundli-Ghaziabad-Palwal) Expressway.

Current status

As of September 2014, work is under progress on the Uttar Pradesh part of the upcoming expressway.[1] [2]

Length

FNG Expressway is around 56 km long with 20  km in Noida-Greater Noida region, 8 km in Ghaziabad, while the remaining 28.1 km is in the Faridabad region, especially the developing sectors of Neharpar. According to the plan, FNG from Noida side will become operational in the next 14 months while it would take three years for the whole stretch to become fully operational[3]

Design

The completed expressway designed by IIT-Roorkee will offer commuters direct connectivity between Noida and Greater Faridabad and put an end to massive traffic jams[4] A bridge is also planned from Noida's Sector 150 to National Highway 2 in Faridabad as a part of the FNG (Faridabad-Noida-Ghaziabad Expressway).

References