Jump to content

Dubai Canal: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Love
Tags: Mobile edit Mobile web edit
No edit summary
Tags: Mobile edit Mobile web edit
Line 1: Line 1:
Siriously stop it
Poooooooooooooooooo


== Infrastructure ==
== Infrastructure ==

Revision as of 06:55, 3 November 2016

Siriously stop it

Infrastructure

Roads and Transport Authority (RTA) will build bridges over the canal for Sheikh Zayed Road, Al Wasl Road and Jumeirah Road. The Sheikh Zayed road bridge will have eight lanes in each direction and three lanes in each direction on Al Wasl Road and Jumeirah Road. The crossings will be 8.5 meters above the water to allow boats to pass underneath.[1]

The project also includes three pedestrian crossings in addition to footpaths on all three new bridges and four marina stations for public transport.[1]

As of July 2014, the earthworks for the project near Sheikh Zayed Road have commenced.[2] There are currently diversions in place to help drivers entering or leaving Dubai. <ref> There

References

  1. ^ a b Davids, Gavin. "RTA to divide $544.5mn Dubai Canal project into three contracts". Big Project. Retrieved 3 March 2014.
  2. ^ http://www.thenational.ae/uae/transport/work-begins-on-sheikh-zayed-road-diversion-as-part-of-dubai-canal-project