Wandsworth Town railway station: Difference between revisions
Appearance
Content deleted Content added
→top: let's keep it at five |
Passenger usage for 15/16 added |
||
Line 23: | Line 23: | ||
| railexits1314 = {{increase}} 3.729 |
| railexits1314 = {{increase}} 3.729 |
||
| railexits1415 = {{increase}} 3.929 |
| railexits1415 = {{increase}} 3.929 |
||
| railexits1516 = {{increase}} 4.175 |
|||
| latitude = 51.4609 |
| latitude = 51.4609 |
||
| longitude = -0.1879 |
| longitude = -0.1879 |
Revision as of 11:08, 2 January 2017
Wandsworth Town | |
---|---|
Location | Wandsworth |
Local authority | London Borough of Wandsworth |
Managed by | South West Trains |
Station code(s) | WNT |
DfT category | C2 |
Number of platforms | 4 |
Fare zone | 2 |
National Rail annual entry and exit | |
2010–11 | 3.214 million[1] |
2011–12 | 3.451 million[1] |
2012–13 | 3.639 million[1] |
2013–14 | 3.729 million[1] |
2014–15 | 3.929 million[1] |
2015–16 | 4.175 million[1] |
Other information | |
External links | |
London transport portal |
Wandsworth Town railway station is in the London Borough of Wandsworth, in south London, in Travelcard Zone 2. The station and all trains serving it are operated by South West Trains.
History
The station opened as Wandsworth when the Nine Elms to Richmond line came into service on 27 July 1846. It was renamed Wandsworth Town on 7 October 1903.[2]
Services
The typical off-peak service from the station is:
- 8 tph (trains per hour) to London Waterloo
- 2 tph to Weybridge
- 2 tph via Richmond, Kingston and Wimbledon
- 4 tph via the Hounslow Loop Line (2 tph in each direction) (these come back to the station after the loop and continue to London Waterloo)
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Clapham Junction | South West Trains Hounslow and Kingston Loop Lines Waterloo to Weybridge (via Hounslow) Shepperton Branch Line |
Putney |
Connections
London Buses routes 28, 44 and night route N44 serve the station.
Improvement work
In August 2010 a major upgrade was approved to build a new ticket office with ticket barriers on York Road.[3] Work started in January 2011.[4]
See also
References
- ^ a b c d e f "Estimates of station usage". Rail statistics. Office of Rail Regulation. Please note: Some methodology may vary year on year.
- ^ Chronology of London Railways by H.V.Borley
- ^ Wandsworth Town Station upgrade approved Clapham Junction Action Group 6 September 2010. Retrieved 11 July 2011.
- ^ Wandsworth Town upgrade work begins Network Rail 21 January 2011. Retrieved 11 July 2011.
External links
Wikimedia Commons has media related to Wandsworth Town railway station.
- Train times and station information for Wandsworth Town railway station from National Rail