In 2004 the Gold Coast City Council resolved to construct Stage 3 of the dam. When the dam reached full capacity, on 7 January 2008 work began on Stage 3<ref name="hggr">{{Cite news |url=http://www.abc.net.au/news/stories/2008/01/07/2132739.htm |title=Heavy Gold Coast rains fill Hinze Dam |accessdate=11 July 2011 |date=7 January 2008 |work=ABC News |publisher=Australian Broadcasting Corporation }}</ref> and was completed on 19 December 2011. After nearly four years of construction the construction cost was {{AUD}}395&nbsp;million.<ref name=segwater2/><ref name="seq1">{{Cite news |url=http://www.seqwater.com.au/public/source-store-treat-supply/dams/hinze-dam |title=Hinze Dam reopens to the public |accessdate=25 December 2011 |date=19 December 2011 |work=Hinze Dam / Advancetown Lake|publisher=SEQ Water }}</ref> The Stage 3 works increased the height of the dam wall from {{convert|93.5|m}} to {{convert|108|m}}, and increased the reservoir capacity from {{convert|161070|ML|impgal USgal}} to {{convert|310730|ML|impgal USgal}}, with the added purpose of flood mitigation, beyond water supply.<ref name=segwater2/><ref name="seq1"/><ref name="uhdwf">{{Cite news |url=http://www.goldcoast.com.au/article/2011/03/11/298455_gold-coast-news.html |title=Upgrade of Hinze Dam wall finished |author=Lappeman, Suzanne |accessdate=11 July 2011 |date=11 March 2011 |work=[[Gold Coast Bulletin]] }}</ref> Stage 3 construction was completed by the Hinze Dam Alliance, a joint venture between Seqwater, with private sector partners [[URS Corporation]], [[Sinclair Knight Merz]] and [[CIMIC Group#Thiess|Thiess]]. The additional works with a higher dam wall provided {{formatnum:4500}} homes below the dam wall with flood protection from a [[1974 Brisbane flood|1974 Brisbane{{endash}}style flood]] event.<ref name="uhdwf"/>
In 2004 the Gold Coast City Council resolved to construct Stage 3 of the dam. When the dam reached full capacity, on 7 January 2008 work began on Stage 3<ref name="hggr">{{Cite news |url=http://www.abc.net.au/news/stories/2008/01/07/2132739.htm |title=Heavy Gold Coast rains fill Hinze Dam |accessdate=11 July 2011 |date=7 January 2008 |work=ABC News |publisher=Australian Broadcasting Corporation }}</ref> and was completed on 19 December 2011. After nearly four years of construction the construction cost was {{AUD}}395&nbsp;million.<ref name=segwater2/><ref name="seq1">{{Cite news |url=http://www.seqwater.com.au/public/source-store-treat-supply/dams/hinze-dam |title=Hinze Dam reopens to the public |accessdate=25 December 2011 |date=19 December 2011 |work=Hinze Dam / Advancetown Lake|publisher=SEQ Water }}</ref> The Stage 3 works increased the height of the dam wall from {{convert|93.5|m}} to {{convert|108|m}}, and increased the reservoir capacity from {{convert|161070|ML|impgal USgal}} to {{convert|310730|ML|impgal USgal}}, with the added purpose of flood mitigation, beyond water supply.<ref name=segwater2/><ref name="seq1"/><ref name="uhdwf">{{Cite news |url=http://www.goldcoast.com.au/article/2011/03/11/298455_gold-coast-news.html |title=Upgrade of Hinze Dam wall finished |author=Lappeman, Suzanne |accessdate=11 July 2011 |date=11 March 2011 |work=[[Gold Coast Bulletin]] }}</ref> Stage 3 construction was completed by the Hinze Dam Alliance, a joint venture between Seqwater, with private sector partners [[URS Corporation]], [[Sinclair Knight Merz]] and [[CIMIC Group#Thiess|Thiess]]. The additional works with a higher dam wall provided {{formatnum:4500}} homes below the dam wall with flood protection from a [[1974 Brisbane flood|1974 Brisbane{{endash}}style flood]] event.<ref name="uhdwf"/>

The eastern boat ramp is located in Mudgeeraba and features a craft and paddle launching platform as well as toilets and bin facilities. The western boat ramp, located in Springbrook, contains the same amenities with a smaller car park. In 2012 a body was discovered by fishermen. <ref>http://www.perthnow.com.au/news/national/body-of-man-found-at-hinze-dam-believed-to-be-58-year-old-man-missing-for-a-week/news-story/a56c0f722356ef71adee64fc9ebbb8e8?sv=85edd94630942b4422ab5463adc3f251</ref>


==Recreation==
==Recreation==

Revision as of 13:31, 26 March 2017

Hinze Dam
Spillway tower of Hinze Dam following Stage 3 upgrade, 2011
Hinze Dam is located in Queensland
Hinze Dam
Location of the Hinze Dam
in Queensland
CountryAustralia
LocationSouth East Queensland
Coordinates28°3′2″S 153°17′2″E / 28.05056°S 153.28389°E / -28.05056; 153.28389
Purpose
StatusOperational
Opening date
  • 1976 (1976) (Stage 1)
  • 1989 (1989) (Stage 2)
  • 2011 (2011) (Stage 3)
Operator(s)SEQ Water
Dam and spillways
Type of damEmbankment dam
ImpoundsNerang River
Height108 m (354 ft)[1]
Length1,850 m (6,070 ft)[2]
Dam volume4,261×10^3 m3 (150.5×10^6 cu ft)[1][3]
Spillway typeUncontrolled
Spillway capacity550 m3/s (19,000 cu ft/s)[3]
Reservoir
CreatesAdvancetown Lake
Total capacity310,730 ML (6.835×1010 imp gal; 8.209×1010 US gal)[2][4]
Catchment area207 km2 (80 sq mi)[2]
Surface area1,500 ha (3,700 acres)[2]
Normal elevation82 metres (269 ft) AHD
Website
www.seqwater.com.au

The Hinze Dam is a rock and earth-fill embankment dam with an un-gated spillway across the Nerang River in the Gold Coast hinterland of South East, Queensland, Australia. The main purpose of the dam is for potable water supply of the Gold Coast region.[1][5] The impounded reservoir is called Advancetown Lake.

Hinze Dam was named in honour of the Hinze family who lived in the valley that was flooded by the dam.[6]

Location and features

Dam wall, 2016

The dam is located in Advancetown, 15 kilometres (9.3 mi) south-west of Nerang immediately downstream of the confluence of the Nerang River and Little Nerang Creek.[5]

Open space, following completion of Stage 2 upgrade

The earthfill dam structure is 108 metres (354 ft) high and 1,850 metres (6,070 ft) long. The 4,261-thousand-cubic-metre (150.5×10^6 cu ft) dam wall holds back the 310,730-megalitre (6.835×1010 imp gal; 8.209×1010 US gal) reservoir when at full capacity. From a catchment area of 207 square kilometres (80 sq mi) that includes the Numinbah Valley and Springbrook Plateau, with most being contained within state forests and national parks, the dam creates Advancetown Lake, with a surface area of 1,500 hectares (3,700 acres). The uncontrolled un-gated spillway, located at 82 metres (269 ft) above sea level, has a discharge capacity of 550 cubic metres per second (19,000 cu ft/s).[1][2][3] Initially managed by the Gold Coast City Council up until 2008, the dam is now managed by Seqwater.[4]

The dam also provides the benefit of flood mitigation to populated areas along the Nerang River downstream of the dam.[3]

Construction

Hinze Dam spillway, following Stage 3 upgrade

The Southport Town Council planned the dam in 1947.[7] It was completed in 1976 and expanded in 1989 and 2011.

Stage One was completed in 1976, and provided 42,400 megalitres (9.3×109 imp gal; 1.12×1010 US gal) of potable water storage and supply.

Stage Two was completed in 1989, when storage of potable water was increased to 161,070 megalitres (3.543×1010 imp gal; 4.255×1010 US gal). This stage was completed at a cost of A$42 million and involved raising the main embankment, spillway and intake towers by approximately 18 metres (59 ft) to create a surface area of 9.72 square kilometres (3.75 sq mi).[1]

In 2004 the Gold Coast City Council resolved to construct Stage 3 of the dam. When the dam reached full capacity, on 7 January 2008 work began on Stage 3[8] and was completed on 19 December 2011. After nearly four years of construction the construction cost was A$395 million.[3][4] The Stage 3 works increased the height of the dam wall from 93.5 metres (307 ft) to 108 metres (354 ft), and increased the reservoir capacity from 161,070 megalitres (3.543×1010 imp gal; 4.255×1010 US gal) to 310,730 megalitres (6.835×1010 imp gal; 8.209×1010 US gal), with the added purpose of flood mitigation, beyond water supply.[3][4][9] Stage 3 construction was completed by the Hinze Dam Alliance, a joint venture between Seqwater, with private sector partners URS Corporation, Sinclair Knight Merz and Thiess. The additional works with a higher dam wall provided 4,500 homes below the dam wall with flood protection from a 1974 Brisbane–style flood event.[9]

The eastern boat ramp is located in Mudgeeraba and features a craft and paddle launching platform as well as toilets and bin facilities. The western boat ramp, located in Springbrook, contains the same amenities with a smaller car park. In 2012 a body was discovered by fishermen. [10]

Recreation

Advancetown Lake is a popular recreational facility for Gold Coast residents. Since the Stage 3 upgrade, recreational activities allowed include walking, electric or manual-powered boating, fishing, biking and horse riding. The facilities are open from 6 am to 6 pm daily.[4] No camping is permitted around the lake.[5] Dogs are also not permitted, while swimming has been strongly discouraged.[11] An interpretive centre was opened on 19 December 2011, along with new parking, walking trails, toilet facilities and barbecue areas.[4]

The Hinze Dam spillway overflows for the first time since the Stage 3 upgrade was completed, after heavy rain from Cyclone Oswald in January 2013

The final design of the dam was criticised in the media and by residents and politicians, some describing it as a "concrete bunker". The criticism arose because of a reduction in playground, boating and barbecue facilities; the banning of dogs; the extensive use of concrete; and because many of the facilities are either far from the water's edge or below the dam wall with no water views.[11]

Advancetown Lake has two boat ramps, one on the western and another on the eastern side.

Fishing

The dam is stocked with Mary River cod, silver perch, golden perch, southern saratoga and bass, while spangled perch are also present naturally.[5] Banded grunter have been found in the lake and being illegally introduced, it is recommended that, if caught, they should be destroyed.[5] A Gold Coast City Council permit is required to fish in the dam.[12] A Queensland State Government Stocked Impoundment Permit is not required.[13]

2018 Commonwealth Games

The Gold Coast is to host the 2018 Commonwealth Games. The area surrounding the Hinze Dam was originally proposed as the location for the mountain bike competition. A new course was constructed to meet international competition requirements. Some government representatives as well as some mountain bikers have sought to have the competition moved away to the unsecured trails at Nerang State Forest.[citation needed] The Gold Coast Mountain Bike Club maintain the course and host a race on the circuit the first Sunday of each month.[14]

See also

References

  1. ^ a b c d e "Register of Large Dams in Australia" (Excel (requires download)). Dams information. Australian National Committee on Large Dams. 2010. Retrieved 23 June 2014.
  2. ^ a b c d e "Hinze Dam". Water supply: Dams and weirs. Seqwater. 2014. Retrieved 1 July 2014.
  3. ^ a b c d e f "Hinze Dam Stage 3 Information" (PDF). Fact sheet (PDF). SEQ Water. 2011. Retrieved 3 July 2014.
  4. ^ a b c d e f "Hinze Dam reopens to the public". Hinze Dam / Advancetown Lake. SEQ Water. 19 December 2011. Retrieved 25 December 2011.
  5. ^ a b c d e Harrison, Rod; James, Ernie; Sully, Chris; Classon, Bill; Eckermann, Joy (2008). Queensland Dams. Bayswater, Victoria: Australian Fishing Network. pp. 58–59. ISBN 978-1-86513-134-4.
  6. ^ What's in a Name: Hinze Dam (streaming audio). Brisbane, Queensland: ABC Radio. 5 June 2012. Retrieved 2 July 2014. {{cite AV media}}: Cite has empty unknown parameter: |trans_title= (help)
  7. ^ "SOUTHPORT'S BIG WATER SCHEME". The Courier-Mail. Brisbane: National Library of Australia. 28 January 1947. p. 3. Retrieved 19 April 2014.
  8. ^ "Heavy Gold Coast rains fill Hinze Dam". ABC News. Australian Broadcasting Corporation. 7 January 2008. Retrieved 11 July 2011.
  9. ^ a b Lappeman, Suzanne (11 March 2011). "Upgrade of Hinze Dam wall finished". Gold Coast Bulletin. Retrieved 11 July 2011.
  10. ^ http://www.perthnow.com.au/news/national/body-of-man-found-at-hinze-dam-believed-to-be-58-year-old-man-missing-for-a-week/news-story/a56c0f722356ef71adee64fc9ebbb8e8?sv=85edd94630942b4422ab5463adc3f251
  11. ^ a b Tuttiett, Henry (19 December 2011). "Hinze Dam re-opens after $395m facelift". Gold Coast Bulletin. Retrieved 25 December 2011.
  12. ^ "Gold Coast City Council - Fishing". 23 November 2010. Retrieved 12 August 2011.
  13. ^ "Queensland Government Primary Industries and Fisheries - Do I need a permit to go fishing in a dam?". 1 July 2011. Retrieved 12 August 2011.
  14. ^ "Hinze Dam". Gold Coast Mountain Bike Inc. 2013. Retrieved 2 July 2014.