Jump to content

VR2: Difference between revisions

From Wikipedia, the free encyclopedia
Content deleted Content added
Jardim v (talk | contribs)
Jardim v (talk | contribs)
No edit summary
Line 10: Line 10:
<small>Map of VR2</small>
<small>Map of VR2</small>
|}
|}
The '''VR2''' (Fast Road 2 in English) is the second [[motorway]] in [[Madeira]] Island. Construction started in 2008<ref name="inicio"><cite class="citation web">[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/52940-gr-abre-concurso-para-via-rapida-c-lobosestreito-por-60-milhoes-LXDN52940 «Concurso para Via Rápida Cm.ª de Lobos-Estreito por 60 milhoes»]. </cite></ref> In 2011, this construction had to stop due to lands owners and finantial crisis in Portugal. <ref name="expropriacoes"><cite class="citation web">[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/106249-via-rapida-do-estreito-em-risco-de-parar-JLDN106249] <ref name="recomeco"><cite class="citation web"> [http://arquivo.jm-madeira.pt/artigos/r%C3%A1pida-para-o-estreito-pronta-no-final-de-2016 «Via Rápida para o Estreito pronta no final de 2016»]. In 2015, the construction continues by and European Financial Found for the Regional Development and it was finally opened in 25 of April 2017.<ref name="inauguracao"><cite class="citation web">[http://www.dnoticias.pt/madeira/via-rapida-ao-estreito-de-camara-de-lobos-inaugurada-amanha-CK1279004 «Via Rápida ao Estreito de Câmara de Lobos inaugurada amanhã»]. </cite></ref>
The '''VR2''' (Fast Road 2 in English) is the second [[motorway]] in [[Madeira]] Island. Construction started in 2008<ref name="inicio"><cite class="citation web">[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/52940-gr-abre-concurso-para-via-rapida-c-lobosestreito-por-60-milhoes-LXDN52940 «Concurso para Via Rápida Cm.ª de Lobos-Estreito por 60 milhoes»]. </cite></ref> In 2011, this construction had to stop due to lands owners and finantial crisis in Portugal. <ref name="expropriacoes"><cite class="citation web">[http://www.dnoticias.pt/impressa/hemeroteca/diario-de-noticias/106249-via-rapida-do-estreito-em-risco-de-parar-JLDN106249]. <ref name="recomeco"><cite class="citation web"> [http://arquivo.jm-madeira.pt/artigos/r%C3%A1pida-para-o-estreito-pronta-no-final-de-2016 «Via Rápida para o Estreito pronta no final de 2016»]. In 2015, the construction continues by and European Financial Found for the Regional Development and it was finally opened in 25 of April 2017.<ref name="inauguracao"><cite class="citation web">[http://www.dnoticias.pt/madeira/via-rapida-ao-estreito-de-camara-de-lobos-inaugurada-amanha-CK1279004 «Via Rápida ao Estreito de Câmara de Lobos inaugurada amanhã»]. </cite></ref>


With 3,7 &nbsp;km it goes from [[Câmara de Lobos]] to [[Estreito de Câmara de Lobos]], providing a fast connection between the downtown of [[Câmara de Lobos]] and the North of the same municipality, Jardim da Serra, Estreito de Câmara de Lobos and Covão.
With 3,7 &nbsp;km it goes from [[Câmara de Lobos]] to [[Estreito de Câmara de Lobos]], providing a fast connection between the downtown of [[Câmara de Lobos]] and the North of the same municipality, Jardim da Serra, Estreito de Câmara de Lobos and Covão.

Revision as of 17:43, 29 April 2017

 VR2 

3,7

Via Rápida 2
File:Mapa Madeira com VR2.png

Map of VR2

The VR2 (Fast Road 2 in English) is the second motorway in Madeira Island. Construction started in 2008[1] In 2011, this construction had to stop due to lands owners and finantial crisis in Portugal. [2]

With 3,7  km it goes from Câmara de Lobos to Estreito de Câmara de Lobos, providing a fast connection between the downtown of Câmara de Lobos and the North of the same municipality, Jardim da Serra, Estreito de Câmara de Lobos and Covão.

Junctions

There are 4 Junctions and 3 tunnels in total.

Junction ( Nó ) Km
Fonte da Rocha (Cidade Nova)
0,000
Fonte da Rocha - Pedreira do Barradas - 1200 m
Pedreira do Barradas
1,300
Fonte da Rocha ( 1 ) – Pedreira do Barradas 1,300
Covão - 335 m / 390 m (consoante o sentido)
Pedreira do Barradas ( 2 ) – Vargem 1,500
Vargem ( 3 ) – Covão 1,000
Vargem ( 4 ) – Estreito de Câmara de Lobos 0,900

References

  1. ^ «Concurso para Via Rápida Cm.ª de Lobos-Estreito por 60 milhoes».
  2. ^ [1]. <ref name="recomeco"> «Via Rápida para o Estreito pronta no final de 2016». In 2015, the construction continues by and European Financial Found for the Regional Development and it was finally opened in 25 of April 2017.<ref name="inauguracao">«Via Rápida ao Estreito de Câmara de Lobos inaugurada amanhã».

[2] [3] [4] [5]