Icône: Difference between revisions
Appearance
Content deleted Content added
m Category add/change/fix; AWB general fixes using AWB |
m Robot - Removing category Skyscrapers between 100 and 149 meters per CFD at Wikipedia:Categories for discussion/Log/2017 May 2. |
||
Line 89: | Line 89: | ||
[[Category:Buildings and structures under construction in Canada]] |
[[Category:Buildings and structures under construction in Canada]] |
||
[[Category:Residential skyscrapers in Canada]] |
[[Category:Residential skyscrapers in Canada]] |
||
[[Category:Skyscrapers between 100 and 149 meters]] |
|||
[[Category:Skyscrapers in Montreal]] |
[[Category:Skyscrapers in Montreal]] |
||
[[Category:Skyscraper office buildings in Canada]] |
[[Category:Skyscraper office buildings in Canada]] |
Revision as of 15:24, 4 June 2017
Icône Condominiums | |
---|---|
File:IconeRender.gif | |
General information | |
Status | Under construction |
Type | Condominiums, office space |
Town or city | Montreal, Quebec |
Country | Canada |
Coordinates | 45°29′50″N 73°34′21″W / 45.497113°N 73.572568°W |
Construction started | 2013 |
Completed | 2016 |
Cost | C$120 million |
Height | 146 metres (479 ft) |
Technical details | |
Floor count | 39 |
Design and construction | |
Architecture firm | Béïque Legault Thuot |
Icône is a skyscraper complex currently under construction in Montreal, Quebec, Canada designed by the architecture firm Béïque Legault Thuot. The towers will be located on René-Lévesque Boulevard at the corner of De la Montagne Street, near the Bell Centre and facing the Roccabella development.
The West Tower will be 39 floors and 146 metres (479 ft) tall, while the East Tower will be 27 floors and 107 metres (351 ft) tall.[1] The promoter of the project is Metropolitan Parking Inc.
The West Tower will consist of 358 luxury condos.[2] The East Tower, meanwhile, will be mixed-use, containing office space and rental apartment units.
-
Construction site in October 2013
-
Construction site in December 2014
-
Construction site in September 2015
-
Construction site in March 2016
References
- ^ "Bell Centre condo project to break ground". Montreal Gazette. October 26, 2012. Retrieved August 11, 2013.
- ^ "Icône Condominiums". Montreal Gazette. June 3, 2013. Retrieved August 11, 2013.
External links